Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (38)
/Pt 57--)-m l 3 `-/> /fit f�5 I here by certify that this plan, specification or report was prepared by me or under my direct supervision and that I am NICET Certified at Level IV. Brent D Kotula Date: Req. No. 113889 I I AquaSAFETM FIRE SAFETY SYSTEM OFFICE COPY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : RIVER TERRACE EAST TH-One Head Calculation (H.1) Drawing : RESIDENTIAL Location : UNIT K-6 1-1/4 SERVICE TIGARD OR 97223 Remote Area : 1 Contract : 19816F 035 Data File : 19816F 035 River Terr East K-6, 1-1_4 serv.wxl Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor Page 1Date 12/6/2017 RIVER TERRACE EAST TH-One Head Calculation (H.1) HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE EAST TH Date - 12/4/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 1 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 035 Calculated By - PATRICK BROWN Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: (X) 1 ( )2 ( ) 4 ( ) S ( )Other Date T ( ) Specific Ruling Made by E M Listed Flow at Start Point - 17 Gpm System Type Listed Pres. at Start Point - 12 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 18 x 18 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 129 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 17 Psi Required 57.37 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: A Date of Test - x Rated Cap. T Time of Test - x @ Psi E Static (Psi) - 100 Elev. R Residual (Psi) - 95 Other Flow (Gpm) - 300 S Elevation - 100 P Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Page 2 Date 12/6/2017 City Water Supply: C1 -Static Pressure : 100 Demand: : 12.560 C2-Residual Pressure: 95 D1 -Elevation C2- Residual Flow 300 D2-System Flow : 16.974 D2-System Pressure : 57.365 Hose(Demand) D3-System Demand :71-6:P71-- Safety Margin : 42.610 150 140 130 p 120 R 110 Cl E 100 " S 90 S 80 U 70 R 60 E 50 40 30 20 10 50 100 150 200 250 300 FLOW(N ^ 1.85) 350 400 450 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Page UpRIVERonor 3 TERRACE EAST TH-One Head Calculation (H.1) Date 312/6/2017 Fitting Legend ,/2 ,/4 1 11/4 1% 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 Abbrev. Name 2 2 2 3 4 5 6 7 8 10 12 14 18 22 227 35 40 455 11 50 61G3 E 90'Generic Gated Elbowaly1 1 1 1 1 1 1 1 1 2 2 3 T rValve 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 881 991 101 121 T 90'Aq Flow tTe Tee 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Ru Branch 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 Utr" Aquapex Tee-Run Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 ' Flow Summary - NFPA 2007 Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Paget4 Date 12/6/2017 SUPPLY ANALYSIS Node at Static Residual Source Pressure Pressure Available Flow Pressure Total Demand STRRequired Pressure 100.0 95 300.0 99.975 16.97 57.365 NODE ANALYSIS Node Ta Pressure Discharge 9 Elevation Node Type at Node at Node Notes H.1 129.0 T.14 129.0 4'9 14.0 16.97 T.15 129.0 14.08 H.3 129.0 14.37 T.16 129.0 14.43 H.4 129.0 14.47 1 T.17 129.0 14.7 14.75 T.25 119.0 T.31 109.0 19.3 T.30 109.0 24.13 S.1 104.0 24.47 PRV 100.0 4 MTR 100.0 44.36 .31 STR 100.0 53.72 T.13 129.0 57.36 T.18 119.0 13.69 H.2 129.0 18.89 H.5 129.0 14.03 H.7 129.0 14.14 H.6 129.0 14.29 18.51 T.20 119.0 18.59 T.21 119.0 H.9 119.0 18.98 T.26 119.0 19.08 T.33 109.0 19.5 T.32 109.0 24.06 H.8 119.0 24.08 T.19 119.0 18.7318.89 T.23 119.0 T.24 119.0 19.1 T.27 119.0 19.12 H.11 119.0 19.29 19.4 T.28 119.0 H.10 119.0 19.41 1 H.12 109.0 24.07. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 • ti Final Calculations - Hazen-Williams Page 5 Uponor Page 52/6/2017 RIVER TERRACE EAST TH-One Head Calculation (H.1) Hyd. Qa Dia. Fitting PPip s Pt Pt **** ** ..C„ or g' Pe v ******* Notes Ref. Eqv. Ln. Total Pf Pn Point Qt Pf/Ft H.1 6.19 0.671 Utb 17.0 7.000 17.000 12.000 K Factor=4.90 to 150.0 Vel= 5.62 0.0 24.000 2.082 T.14 6.19 0.0867 - 1Utr 2.0 5.000 14.082 T.14 -4.07 0.671 to 150.0 Utb 17.0 19.000 0.0 T.15Vel= 1.92 2.12 0.0120 0.0 24.000 0.288 - -------- ------ - - -- 4.370 T.15 0.0 0.671 Utr 2.0 3.000 10.0 to 150.0 0.0 2.000 Vel= 1.92 0.0 5.000 0.060 H.3 2.12 0.0120 14.430 H.3 0.0 0.671 Utr 2.0 1.000 0.0 to 150.0 0.0 2.000 Vel= 1.92 0.0 3.000 0.036 -- 2.12 0.0120 --- __ -- T.16 ----- _.--- - _ - T.16 0.0 0.671 Utr 2.02.000 14.4660.0 to 150.0 0.0 2.000 Vel = 1.92 0.0 4.000 H.4 2.12 0.048 0.0120 _-- _ Utb 17.0 3.000 14.514 H.4 0.0 0.671 to 150.0 0.0 17.000 0.0 Vel= 1.92 T.17 2.12 0.0120 0.0 20.000 0.240 T.17 2.08 0.862 Utr 2.0 15.000 14.754 4.2 0.0125 150.0 0.0 2.000 4.331 0.0 17.000 to 0.213 -- -- - - Vel = 2.31 --- ---- T.25 T.25 0.47 0.862 Utb 17.0 19.000 19.298 0.0 14.000 4.331 to 150.0 T.31 4.67 0.0152 0 0 33.000 0.501 Vel = 2.57 T.31 3.77 1.054 0.0 20.000 24.130 150.0 0.0 0.0 0.0 to T.30 8.44 0.0170 0.0 20.000 0.340 Vel= 3.10 T.30 8.53 1.054 Utr 4.0 6.000 24.470 to 150.0 T 2.44 6.440 2.166 Vel= 6.24 0.0 12.440 0.773 S.1 16.97 0.0621 27.409 S.1 0.0 1.054 2E 2.44 1.000 16.732 ** Fixed Loss= 15 to 150.0 0.0 2.440 0.214 Vel= 6.24 3.440 -_---_------ 0 0 PRV 16.97 0.0622-- ----_-- '--------- ----- ------------ 2E 2.44 100.000 44.355 PRV 0.0 1.054 3.000 ** Fixed Loss= 3 to 150.0 0.0 2.440 Vel= 6.24 MTR 16.97 0.0621 0.0 102.440 6.363 MTR 0.0 0.995 E 2.336 35.000 53.718 to 150.0 T 5.841 9.345 0.0 Vel= 7.00, STR 16.97 0.0822 G 1.168 44.345 3.647-_--- ---- 0.0 57.365 K Factor= 2.24 16.97 H.1 10.78 0.671 Utr 20 00 5.000 12.000 2.000 0.0 to 150.0 1.093 Vel= 9.78 T.13 10.78 0.2419 0.0 7.000 T.13 -2.08 0.862 Utr 2.0 15.950 13.693 0.0 2.000 4.331 to 150.0 Vel=- 4.78 .862 0.0---- 17.950 0 --_- - T.18 8.7----0.0480 ---_- ---- T.18 -0.16 0.862 Utb 17.0 13.000 18.886 to 150.0 0.0 14.000 4.331 Vel= 4.69 T.30 8.54 0.0464 0.0 27.000 1.253 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 • '' Final Calculations - Hazen-Williams Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Page 6 Date 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 8.54 24.470 K Factor= 1.73 T.13 2.08 0.671 Utb 17.0 10.000 13.693 to 150.0 Utr 2.0 19.000 0.0 H.2 2.08 0.0115 0.0 29.000 0.334 H2 0.0 0.671 Vel= 1.89 Utr 2.0 8.000 14.027 to 150.0 0.0 2.000 0.0 H.5 2.08 0.0116 0.0 10.000 0.116 Vel= 1.89 H.5 0.0 0.671 Utr 2.0 11.000 14.143 to 150.0 0.0 2.000 0.0 H.7 2.08 0.0115 0.0 13.000 0.150 Vel= 1.89 H.7 0.0 0.671 0.0 10.000 14.293 to 150.0 0.0 0.0 H.6 2.08 0.0115 0.0 0.0 10.000 0.115 Vel= 1.89 H.6 0.0 0.671 Utb 17.0 11.000 14.408 to 150.0 Utr 2.0 19.000 0.0 T.17 2.08 0.0115 0.0 30.000 0.346 Vel= 1.89 0.0 2.08 14.754 K Factor= 0.54 T.14 4.07 0.862 0.0 14.773 14.082 - - to 150.0 0.0 0.0 T.20 4.07 0.0118 4.331 0.0 14.773 0.175 Vel= 2.24 T.20 -1.49 0.671 Utr 2.0 4.000 18.588 to 150.0 Utb 17.0 19.000 0.0 T.21 2.58 0.0171 T.21 0.0 23.000 0.393 Vel= 2.34 0.0 0.671 Utr 2.0 4.000 18.981 to 150.0 0.0 2.000 0.0 H.9 2.58 0.0172 0.0 6.000 0.103 Vel = 2.34 H.9 0.0 0.671 Utb 17.0 7.000 19.084 to 150.0 0.0 17.000 0.0 T.26 2.58 0.0171 0.0 24.000 0.411 Vel= 2.34 T.26 1.19 0.862 Utr 2.0 21.000 19.495 --- - - to 150.0 0.0 2.000 4.331 T.33 3.77 0.0102 0.0 23.000 0.235 T.33 -0.30 0.862 Vel 2.07 to 0.0 2.000 24.061 150.0 0.0 0.0 0.0 T.32 3.47 0.0085 0.0 2.000 T.32 0.017 Vel= 1.91 0.30 0.862 Utr 2.0 3.000 24.078 to 150.0 0.0 2.000 0.0 T.31 3.77 0.0104 0.0 5.000 0.052 0.0 Vel= 2.07 3.77 24.130 KFactor= 0.77 T.20 1.49 0.671 Utb 17.0 6.000 18.588 to 150.0 0.0 17.000 0.0 H.8 1.49 0.0062 0.0 23.000 0.143 Vel= 1.35 H.8 0.0 0.671 Utb 17.0 6.000 18.731 to 150.0 Utr 2.0 19.000 0.0 T.19 1.49 0.0062 0.0 25.000 0.156 Vel= 1.35 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-WilliamsCalculation (H.1) Page 7 Uponor ST Date 12/6/2017 RIVER TERRACE EATH-One Head Hyd. Qa Dia. Fitting Pipe Pt Pt ******* Notes *"'"" Ref. "c' or Ftng's Pe Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.19 0.16 0.671 Utr 2.0 10.000 18.887 to 150.0 Utb 17.0 19.000 0.0 l= 1.50 T.23 1.65 0.0075 0.0 29.000 0.218 Ve t T.23 -0.30 0.671 Utr 2.0 1.000 19.105 to 150.0 0.0 2.000 0.0 Vel= 1.22 0.0 3.000 0.016 T.24 1.35 0.0053 T.24 0.30 0.671 Utb 17.0 6.000 19.121 to 150.0 0.0 17.000 0.0 Vel= 1.50 T.27 1.65 0.0075 0.0 23.000 0.173 T.27 -0.46 0.671 Utb 17.0 6.000 19.294 to 150.0 Utr 2.0 19.000 0.0 Vel= 1.08 H.11 1.19 0.0041 0.0 25.000 0.103 H.11 0.0 0.671 0.0 3.000 19.397 to 150.0 0.0 0.0 0.0 T.28 1.19 0.0040 0.0 3.000 0.012 Vel= 1.08 - --- .- -_-- - -- T.28 0.0 0.671 Utr 2.0 2.000 19.409 to 150.0 Utb 17.0 19.000 0.0 Vel= 1.08 T.26 1.19 0.0041 0.0 21.000 0.086 0.0 1.19 19.495 K Factor= 0.27 T.18 0.16 0.862 Utb 17.0 5.000 18.886 to 150.0 0.0 14.000 0.0 T.19 0.16 0.0001 0.0 19.000 0.001 - - Vel= 0.09 -- -- - - 0.0 0.16 18.887 K Factor= 0.04 T.23 0.30 0.671 Utb 17.0 6.000 19.105 to 150.0 Utr 2.0 19.000 0.0 Vel= 0.27 H.10 0.3 0.0004 0.0 25.000 0.009 H.10 0.0 0.671 Utb 17.0 5.000 19.114 to 150.0 0.0 17.000 0.0 Vel = 0.27 T.24 0.3 0.0003 0.0 22.000 0.007 ----------- 0.0 0.30 19.121 K Factor= 0.07 a T.27 0.46 0.862 Utb 17.0 2.000 19.294 to 150.0 0.0 14.000 0.0 Vel= 0.25 T.25 0.46 0.0002 0.0 16.000 0.004 0.0 19.298 K Factor= 0.10 0.46 -- - -----T.33 0.30 0.671 Utb 17.0 11.000 24.061 to 150.0 Utr 2.0 19.000 0.0 Vel= 0.27 H.12 0.3 0.0003 0.0 30.000 0.009 H.12 0.0 0.671 Utb 17.0 8.000 24.070 to 150.0 0.0 17.000 0.0 0.0 25.000 0.008 Vel= 0.27 T.32 0.3 0.0003 0.0 0.30 24.078 K Factor= 0.06 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 I here by certify that this plan, specification or report was prepared by me or under my direct supervision and that I am NICET Certified at Level IV. Brent D Kotula Date: Req. No. 113889 AquaSAFETM FIRE SAFETY SYSTEM OFFICE COPY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Drawing : RESIDENTIAL Location : UNIT K-6 1-1/4 SERVICE TIGARD OR 97223 Remote Area : 1 Contract : 19816F 035 Data File : 19816F 035 River Terr East K-6, 1-1_4 serv.wx2 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 t Uponor Page 1 RIVER TERRACE EAST TH -Two Head Calculation (H.7 & H.6) Date 12/6/2017 HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE EAST TH Date - 12/4/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 1 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 035 Calculated By - PATRICK BROWN Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: ( ) 1 (X)2 ( ) 4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 13 Gpm System Type Listed Pres. at Start Point - 7.04 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 16 x 16 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 129 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 26.0732 Psi Required 78.96 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: A Date of Test - x Rated Cap. T Time of Test - x @ Psi E Static (Psi) - 100 Elev. R Residual (Psi) - 95 Other Flow (Gpm) - 300 S Elevation - 100 P Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Page 2 Date 12/6/2017 City Water Supply: Cl -Static Pressure : 100 Demand: C2- Residual Pressure: 95 D1 -Elevation : 12.560 C2- Residual Flow : 300 D2-System Flow : 26.073 D2-System Pressure : 78.963 Hose ( Demand) D3-System Demand : 26.073 Safety Margin : 20.983 150 140 130 p 120 R 110 Cl E 100 o t , 02 S 90 i e S 80 - D2 U 70 R 60 E 50 40 30 20 a 10 : D1 . . . . 50 100 150 200 250300 . .350 400450 450 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Page 3 Uponor Date 32/6/2017 RIVER TERRACE EAST TH-Two Head Calculation (H.7 & H.6) Fitting Legend Abbrev. Name 1/2 3/4 1 1'/4 11/2 2 2% 3 31/2 4 5 6 8 10 12 14 16 18 20 24 E 90'Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Generic Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb" Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch s Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 1 Flow Summary - NFPA 2007 Uponor RIVER TERRACE EAST TH -Two Head Calculation (H.7& H.6) Page 4 Date 12/6/2017 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 100.0 95 300.0 99.946 26.07 78.963 NODE ANALYSIS Pressure Node Tag Elevation Node Type at Node at Node Discharge Notes H.7 129.0 4.9 7.04 13.0 H.5 129.0 10.49 H.2 129.0 13.14 T.13 129.0 20.83 T.18 119.0 26.15 T.30 109.0 32.74 S.1 104.0 36.61 PRV 100.0 53.82 MTR 100.0 70.9 STR 100.0 78.96 H.6 129.0 4.9 7.12 13.07 T.17 129.0 20.07 T.25 119.0 25.88 T.31 109.0 31.82 H.4 129.0 20.45 T.16 129.0 20.53 H.3 129.0 20.58 T.15 129.0 20.68 T.14 129.0 21.14 T.20 119.0 25.69 T.21 119.0 26.2 H.9 119.0 26.34 T.26 119.0 26.87 T.33 109.0 31.68 T.32 109.0 31.72 H.1 129.0 20.9 H.8 119.0 25.88 T.19 119.0 26.07 T.27 119.0 26.01 H.11 119.0 26.44 T.28 119.0 26.5 T.24 119.0 26.04 T.23 119.0 26.04 H.10 119.0 26.04 H.12 109.0 31.7 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams • e 5 ag Uponor PPage 52/6/2017 RIVER TERRACE EAST TH -Two Head Calculation (H.7 &H.6) Hyd. Qa Dia. Fitting Pipe Pt Pt **•«*** Notes *""""" Ref. "C" or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H,7 11.33 0.671 Utr 2.0 11.000 7.040 K Factor=4.90 to 150.0 0.0 2.000 0.0 H.5 11.33 0.2652 0.0 13.000Vel= 10.28 3.447 - -_ H.5 0.0 0.671 Utr 2.0 8.000 10.487 to 150.0 0.0 2.000 0.0 H.2 11.33 0.2651 0.0 10.000 2.651 Vel= 10.28 H.2 0.0 0.671 Utb 17.0 10.000 13.138 to 150.0 Utr 2.0 19.000 0.0 Vel= 10.28 T.13 11.33 0.2651 0.0 29.000 7.689 T.13 -1.93 0.862 Utr 2.0 15.950 20.827 to 150.0 0.0 2.000 4.331 T.18 9.4 0.0554 0.0 17.950 0.995 _ - - Vel= 5.17 T.18 2.32 0.862 Utb 17.0 13.000 26.153 to 150.0 0.0 14.000 4.331 T.30 11.72 0.0834 - - 0.0 27.000. 2.251Vel= 6.44 T.30 14.35 1.054 Utr 4.0 6.000 32.735 to 150.0 T 2.44 6.440 2.166 Vel= 9.59 S.1 26.07 0.1374 0.0 12.440 1.709 S.1 0.0 1.054 2E 0.04 1.000 2.440 10 to 150.016.732 ** Fixed Loss= 15 PRV 26.07 0.1378 0.0 3.440 0.474 Vel= 9.59 PRV 0.0 1.054 2E 2.44 100.000 53.816 ** Fixed Loss= 3 to 150.0 0.0 2.440 3.000 MTR 26.07 0.1374 0.0 102.440 14.079 Vel= 9.59 MTR 0.0 0.995 E 2.336 35.000 70.895 to 150.0 T 5.841 9.345 0.0 Vel = 10.76 STR 26.07 0.1819 G 1.168 44.345 8.068 0.0 26.07 78.963 K Factor= 2.93 H.7 1.67 0.671 0.0 10.000 7.040 to 150.0 0.0 0.0 0.0 Vel= 1.52 H.6 1.67 0.0077 0.0 10.000 0.077 KFactor=4.90 H.6 13.07 0.671 Utb 17.0 11.000 7.117 to 150.0 Utr 2.0 19.000 0.0 Vel= 13.37 T.17 14.74 0.4317 0.0 30.000 12.952 T.17 -2.73 0.862 Utr 2.0 15.000 20.069 to 150.0 0.0 2.000 4.331 T.25 12.01 0.0872 0.0 17.000 1.483 Vel= 6.60. T.25 -3.23 0.862 Utb 17.00.0 14.00019.000 25.883 to 150.0Vel= 4.83 1 T.31 8.78 0.0488 0.0 33.000 1.611 T.31 5.57 1.054 0.0 20.000 31.825 to 150.0 0.0 0.0 0.0 T.30 14.35 0.0455 0.0 20.000 0.910 Vel= 5.28 0.0 14.35 32.735 K Factor= 2.51 T.17 2.73 0.671 Utb 17.0 3.000 20.069 to 150.0 0.0 17.000 0.0 H.4 2.73 0.0190 0.0 20.000 0.381 Vel= 2.48 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor RIVER TERRACE EAST TH -Two Head Calculation (H.7& H.6) Dat 6 te 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes *****' Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.4 0.0 0.671 Utr 2.0 2.000 20.450 to 150.0 0.0 2.000 0.0 T.16 2.73 0.0192 0.0 4.000 0.077 Vel= 2.48 T.16 0.0 0.671 Utr 2.0 1.000 20.527 to 150.0 0.0 2.000 0.0 H.3 2.73 0.0190 0.0 3.000 0.057 Vel = 2.48 H.3 0.0 0.671 Utr 2.0 3.000 20.584 to 150.0 0.0 2.000 0.0 T.15 2.73 0.0192 0.0 5.000 0.096 Vel= 2.48 T.15 0.0 0.671 Utr 2.0 5.000 20.680 to 150.0 Utb 17.0 19.000 0.0 T.14 2.73 0.0191 0.0 24.000 0.458 Vel = 2.48 T.14 1.93 0.862 0.0 14.773 21.138 to 150.0 0.0 0.0 4.331 T.20 4.66 0.0151 0.0 14.773 0.223 Vel= 2.56 T.20 -1.70 0.671 Utr 2.0 4.000 25.692 to 150.0 Utb 17.0 19.000 0.0 T.21 2.96 0.0222 0.0 23.000 0.510 Vel= 2.69 T.21 0.0 0.671 Utr 2.0 4.000 26.202 to 150.0 0.0 2.000 0.0 H.9 2.96 0.0222 0.0 6.000 0.133 Vel = 2.6 9 H.9 0.0 0.671 Utb 17.0 7.000 26.335 to 150.0 0.0 17.000 0.0 T.26 2.96 0.0222 0.0 24.000 0.532 Vel= 2.69 T.26 2.62 0.862 Utr 2.0 21.000 26.867 to 150.0 0.0 2.000 4.331 T.33 5.58 0.0211 0.0 23.000 0.485 Vel= 3.07 T.33 -0.45 0.862 0.0 2.000 31.683 to 150.0 0.0 0.0 0.0 T.32 5.13 0.0180 0.0 2.000 0.036 Vel= 2.82 T.32 0.45 0.862 Utr 2.0 3.000 31.719 to 150.0 0.0 2.000 0.0 T.31 5.58 0.0212 0.0 5.000 0.106 Vel= 3.07 0.0 5.58 31.825 K Factor= 0.99 T.13 1.93 0.671 Utr 2.0 5.000 20.827 to 150.0 0.0 2.000 0.0 H.1 1.93 0.0100 0.0 7.000 0.070 _ Vel = 1.75 H.1 0.0 0.671 Utb 17.0 7.000 20.897 to 150.0 0.0 17.000 0.0 T.14 1.93 0.0100 0.0 24.000 0.241 Vel= 1.75 0.0 1.93 21.138 K Factor= 0.42 T.20 1.70 0.671 Utb 17.0 6.000 25.692 to 150.0 0.0 17.000 0.0 H.8 1.7 0.0080 0.0 23.000 0.183 Vel= 1.54 H.8 0.0 0.671 Utb 17.0 6.000 25.875 to 150.0 Utr 2.0 19.000 0.0 T.19 1.7 0.0079 0.0 25.000 0.198 Vel= 1.54 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 + Final Calculations - Hazen-Williams Page 7 Uponor Date 12/6/2017 RIVER TERRACE EAST TH -Two Head Calculation (H.7 &H.6) Hyd. Qa Dia. Fitting Pipe Pt Pt *** *** Notes *"" "' Ref. "C" or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.19 0.62 0.862 Utb 17.0 5.000 26.073 to 150.0 0.0 14.000 0.0 T.18 2.32 0.0042 0.0 19.000 0.080 Vel= 1.28 0.0 2.32 26.153 K Factor= 0.45 T.25 3.24 0.862 Utb 17.0 2.000 25.883 to 150.0 0.0 14.000 0.0 T.27 3.24 0.0077 0.0 16.000 0.123 Vel = 1.78 T.27 -0.63 0.671 Utb 17.0 6.000 26.006 to 150.0 Utr 2.0 19.000 0.0 H.11 2.61 0.0176 0.0 25.000 0.439 Vel- 2.37 H.11 0.0 0.671 0.0 3.000 26.445 to 150.0 0.0 0.0 0.0 T.28 2.61 0.0177 0.0 3.000 0.053 Vel= 2.37 T.28 0.0 0.671 Utr 2.0 2.000 26.498 to 150.0 Utb 17.0 19.000 0.0 T.26 2.61 0.0176 0.0 21.000 0.369 Vel = 2.370.0 2.61 26.867 K Factor= 0.50 T.27 0.62 0.671 Utb 17.0 6.000 26.006 to 150.0 0.0 17.000 0.0 T.24 0.62 0.0013 0.0 23.000 0.029 Vel= 0.56 T.24 -0.11 0.671 Utr 2.0 1.000 26.035 to 150.0 0.0 2.000 0.0 T.23 0.51 0.0007 0.0 3.000 0.002 Vel = 0.46 T.23 0.11 0.671 Utr 2.0 10.000 26.037 to 150.0 Utb 17.0 19.000 0.0 T.19 0.62 0.0012 0.0 29.000 0.036 Vel= 0.56 0.0 0.62 26.073 K Factor= 0.12 T.24 0.12 0.671 Utb 17.0 5.000 26.035 to 150.0 0.0 17.000 0.0 H.10 0.12 0.0 0.0 22.000 0.001 Vel= 0.11 -_ H.10 0.0 0.671 Utb 17.0 6.000 26.036 to 150.0 Utr 2.0 19.000 0.0 T.23 0.12 0.0 0.0 25.000 0.001 Vel = 0.11 0.0 0.12 26.037 K Factor= 0.02 T.33 0.44 0.671 Utb 17.0 11.000 31.683 to 150.0 Utr 2.0 19.000 0.0 H.12 0.44 0.0007 0.0 30.000 0.020 Vel= 0.40 H.12 0.0 0.671 Utb 17.0 8.000 31.703 to 150.0 0.0 17.000 0.0 T.32 0.44 0.0006 0.0 25.000 0.016 Vel = 0.40 0.0 0.44 31.719 K Factor= 0.08 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087