Loading...
PFI2018-00014 gI CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12018-00014 Date Issued: 02/26/2018 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG1396 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: NWN PFI Project Description: Install 2 short side SVCS main is on the 8' in ROW under asphalt. @ 9795&9799 SW Frewing Owner: FEES Description Date Amount PFI Permit Fee 02/05/2018 $300.00 PHONE: Contractor: LOY CLARK PO BOX 1369 TUALATIN, OR 97062 PHONE: FAX: Applicant: AISHA RIVERS 220 NW 2ND AVE PORTLAND, OR 97209 PHONE: 503-226-4211 Total $300.00 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant r n C,�,/V�/„�L_A Signature: vl Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12018-00014 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Not Met Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Not Met Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 04-WORK SITE REPAIRS Not Met Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 17- NOTICE TO COMMENCE WORK Not Met Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 06-TRAFFIC CONTROL PLAN Not Met Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Not Met Notice Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Not Met Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 20- EMERGENCY CONTACTS Not Met Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems, take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 03-WORK SITE EROSION CONTROL Not Met Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Not Met Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook [OTTCH]. PFI_Utilities 12- UTILITY NOTIFICATION Not Met Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 18- PERMIT/PLAN ON SITE Not Met Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Not Met Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI—Utilities 13- UTILITY LOCATION CONFLICT Not Met Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 14-TEMPORARY PATCH Not Met Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work- PFI—Utilities 15- REPAIR OF EXISTING FACILITIES Not Met Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Utilities 19-MONUMENT PROTECTION Not Met Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Utilities 16- PRECONSTRUCTION MEETING Not Met Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting- PFI—Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Not Met Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI—Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Not Met Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. RECEIVED City of Tigard JAN 2 5 2018 PUBLIC WORKS — ENGINEERING 't CITY CF'i IGARD ' r, iffifNGINEERING Public FacilityImprovement (PFI) Pe DESCRIPTION OF WORK(in the right-of-way) REQUIRED SUBMITTAL Check one: El Utilities ❑ Sidewalk/driveway approach ❑ Street improvements ELEMENTS Detailed description: Install (2)short side svcs; main is on the Fin ROW ❑ 'Minor work in right-of-way halt//V11R#3530436 & 3530439 (sidewalk repair,curb cut,street under as p opening,etc.)requires: •application form,completed and signed •Submit one(1)copy of scaled sketch Property address/location(s): 9795 & 9799 SW Frewing St of the proposed work to be done �C-1 0 0 •Submit one(1)copy of traffic "' control plan –OR– Applicant's name: NW Natural/Aisha Rivers El Substantial project work requires PP above items and professional Address: 220 NW 2nd Ave engineered plans for: •Street widening City/state: Portland, OR Zip. 97209 •Subdivision infrastructure Phone: 503-226-4211 x4428 Email: nwnpermits@nwnatural.com •Main utility line extension: - Storm Drain,Sanitary–Tigard LO Clark - Water–Tigard Water Service Contractor's name: Y area(includes Durham,King City CCB#: 52281 Expiration: and a portion of unincorporated Address: PO Box 1369 Washington County) City/state: , Zip: TualatinOr97062 DELIVER APPLICATION TO: City of Tigard Phone: 971-806-2841 Email: Jade.leedy@loyclark.com Planning/Engineer ing 13125 SW Hall Blvd. Engineer's name: NW Natural/Rich Girard Tigard,OR 97223 220 NW 2nd Ave Applications for"minor work in right-of--way" Address: only may be emailed to: City/state: Portland, OR Zip. 97209 LQmermits&tigard-orr go_v Phone: 360-921-0314 Email: r2g@nwnatural.com Case No.: POU 11 — 0000 Estimated value of work (within the public right-of-way): $ application submittal fee: $soy ,od Is work related to a LAND-USE DECISION? ❑ les ❑ No Application accepted: If so, please specify (MLP, SDR, SUB, etc.) case #: By: Date: 15 Is work related to a BUILDING PERI HT? ❑ Yes ❑ No Application reviewed: If so,please specify(BUILDING PERMBy: 64 Date:IT) case#: . Applicant notified: �1'L�t�1.1►.�Cc� )S A J-00 Cj T s-rtzct–T, -r-e* j cv+t es By: AL" Date: 2 t� �t l` .. 1 fe t 4 +& ,eg C f�} •TN �,�l N 1 �f I:\CURPLN\Masters\Land Use Applications Rev.07/16/2014 l�f � City of Tigard • 13125 SW Hall Blvd. 0 Tigard,Oregon 97223 www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work. When the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT: • The above request does not violate any deed restrictions that may be attached to or imtiosed ution the subject tirotierty. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in the plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. SIGNATURES of each owner of the subject property required. Digitally signed by Aisha Preston DN: aha Preston,o=N,c Natural,ou,Aisha Prestonemail=ap@nwnatural.com,c=US AI s h a Preston 2/24/16 Date:2016.02.23 10:33:57-08'00' Applicant/Authorized Agent's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov 503-718-2421 • Page 2 of 4 X00 �sB *h J{,7205 r� ms's 7,0 #9950 e5 0 JL12 io 'rr'- o S� c6 `� • 9799 SW Frewing St, #3530436 all, Aa O dazes 9795 SW Frewing St, #3530439 s� A. yneNy� 011, �hh0 � \Ql �3255 #�32 165 #1°44 5�� 215 19� RPl9/ _gyp Fie a�9 �3d ,�g15° 125 of 1 ' Ql 1 gg15 /1 Ag121� 2 �nf 2 M� y6fi lQl '9 *75 " � 9 101111, SW Barnum Dr NW Natural PLAT: 1-044-019 COUNTY: WASHINGTON 01/24/18 14:5 (503)226-4211 TOWNSHIP: T02S RANGE: R01 W SECTION: 2SW SCALE: 1 IN = 100 FT USER ID:aap i Page 94 2011 Edition Self-Regulating Lane Closure Diagram 350 Use this detail for closures of one lane of a low-speed, two-lane, two-way road. 1. Use this diagram only if all of the following are true: a. Work space is less than 200 feet. b. The posted speed is 40 mph or less (unless not posted and speed governed by basic rule). c. Average Daily Traffic (ADT) is less than 400. d. Sight distance (in feet) is more than 750 at each end. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 3. For added visibility, a truck-mounted arrow panel or PCMS in caution mode may be used. 4. A"Lane Ends (Right)" (W4-2R) symbol sign, or"RIGHT LANE ENDS" (W9-1 R)sign, may be placed inside the cone taper for more emphasis. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 100 35 40 350 350 350 125 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 95 Self-Regulating Lane Closure Diagram 350 ROAD\' — A WORK B 7JA • Initial AHEAD Warning • Sign • • , ONE LANE ® \ ,,,� ROAD AHEAD • Protection Vehicle • TO YIELD W/TMA(both Optional) ONCOMING OR TO See Chapter 4 • TRAFFIC ONCOMING TRAFFIC • Buffer •• 50'-100' a I5� ORV A 1E, ONE LANE\ B ROAD AHEAD ROAD C � WORK AHEAD Warning 1 / Initial Warning Sign December 2011 Chapter 5 Machine Mill The Sand And Seal Paving Joints With 12 � � Area For A 1-1/2" Hot Paving Grade Exsting 12„ Min Blanket Inlay Oil (pg 64-22 Or Asphaltic Min See Notes Below Equivalent) COnCrete Exsting �a.�' �'Y Jr.,1 ��.,.{ •• � ,,,..'' %s.' �� Road 1, �;' >�� - ..• . �; �� Base �'��.�`-�1.`.,_J C����' ..�r,. . . • ' �..�.�`--�1-�`�''-.�.�r� v� Non—Compressible Backfill Cement Slurry ' (for Mojor Roads Or As• J i 1= Asphaltic Concrete Pavement Specified) i ' Undisturbed Ground "7" Patch, 6 Thick Or. Match I Ground Existing Pavement (whichever Is Greater) Up To The Level Of ; Original Pavement. {�— Crushed Aggregate _I Or Granular Pipe Zone Backfill I —{ d Material { f III lil ! I III-- I { 11 .ail { ! fl fl1 -lll . ,II ! i { { R 0 o Trench Width �; ------ Per Plan or hAs Specified * o Notes: $ Blanket Patches To Be Constructed With Level 2, 1/2 Inch, Dense, P9-64-22 o Hmoc In Dry Pavement Conditions, Where Existing Pavement Is At Least 60• F And Rising. Tock All Pavement To 8e Inlaid With Emulsified Asphalt. �s The City Engineer Shall Determine the Final Width and Length of the Inlay Patch to Best Fit Travel Pottems. 3 to o� o�u CAPITAL CONSTRUCTION AND �� TRANSPORTATION DIVISION City of Tigard FIG_URE -0�� �- 13125 SA ,� BLVD. Blanket I n I�y !. •. nav caRo, oRrc97223 .z VOICE: 503-639-4171 W. 503-624-0752 Detail FILE NO a I www.RWD�-oR.cov n�a