PFI2018-00040 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
= COMMUNITY DEVELOPMENT Permit#: PF12018-00040
2
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/27/2018
Parcel: SEG2109
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE
Project Description: Replace underground SEC-350 feet and remove SVC saver
Owner: FEES
Description Date Amount
PFI Permit Fee 02/26/2018 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
AMY SWEANY
10800 SW AVERY ST
TUALATIN, OR 97062
PHONE: 503-612-2935
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: sele VYL•
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12018-00040
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices, flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time, without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have
authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
City ofTigard FEB 2 0 2018
PUBLIC WORKS —ENGINEERING CITY OF TIGARD
Pubhc-Fadhty Improven*N'TRY`hermit
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
C�
,..,{ TYPE I—Franchise Utility Work
Check one: R Utilities ❑Sidewalk/driveway approach ❑Streetimprovements performed by NWN, PGE
Detailed description: Replace 9
Re lace under round SEC-350ft& remove and/or utility agency.
SVC saver ❑ TYPE 2—Sidewalk/Driveway/Sewer
Work performed for the purpose of:
PGE Job M2446973 • Sidewalk installation or repair.
• Driveway approach installation
10195 SW Kable Street
Property address/location(s): and/or repair
Tigard, OR 97224 • Sanitary sewer lateral installation
=. %Q/0�2_ and/or main line tap
Portland General Electric Submitted b Am Swean ❑ TYPE 3—Full scale Development
Applicant: t Y Y Yl
Work performed with Land use
Address: 10800 SW Avery Street approval which includes any of
City/state: Tualatin,OR Zip: 97062 the following:
Phone: 503-612-2935 Email: preregcoord@pgn.com • Subdivisions or Partitions
Contact name: Phil Merriman Phone: 503-935-6943
• Street widening
• Mainline installation for Sanitary
pP
Contractor:
PGE Approved Contractor sewer, Storm sewer,Tigard water
and/or Tigard Water Service area
CCB#: Expiration:
Address: SUBMIT COMPLETED APPLICATION TO:
City/state: Zip: City of Tigard
Rnm ng/Engineering
Phone: Email: 13125 SW Hall Blvd.
Contact name: Phone: Tigard,OR 97223
Applications for"minor work in light-of-way"
N/A only may be emailed to:
Engineer: rompermits .tigaard-or.gov
Address:
City/state: Zip:
Phone: Email: Case No.: f�al�
Contact name: Application submittal fee(.007%of
Engineers Estimate) S
Estimated value of work is required(if over$5,000):$ 14,705.48 Additional fees:$
(within the public right-of-way) Application accepted:
By: k9 Date:
Is work related to a LAND-USE DECISION? ❑ Yes VdNo
If so,please specify(MLP,SDR,SUB,etc.) case#: Application reviewed:
By V Date:
Is work related to a BUILDING PERMIT? ❑ Yes E(No Applicant notified:
If so,please specify(BUILDING PERMIT)case#: By: P\t' Date:
IAENG\PermitAppAcatiom\pri—application Rev.10/16/2017
City ofTigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov • 503-718-2421 • Page 1 of4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject
ro .
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attaclunents,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
11
QV--\ c �-4 v' S`-� 1 S 2-0 1 c`3
Applicant/authorized agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page Z of 4
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75
30 1 100
35 40 350 350 350 125
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
wows
ROAD
AHEAD A
t�+•4
�
(o 1 t
ROAD
AHEAD
<*�
OE
B
� B
A (off
JA
u►E
FKW
toots Ma BE wwaWORK
AHEAB B , C
Buffer
too rt.M
C B B A
rtao BE
wows
AHEADsro� toot<ntoL
(OPS-'q A
B BE
�o stor
Bcoptlon.q
1 t EA
PODAD
<AHEAD
woFX
December 2011 Chapter 5
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3— Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340— Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the "Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The "ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
p ———————————— ———————
� I 1 o_
GJ1 C,f�A A W W N N
CD
SingFlager Operation
N I fle g
or Low Volumesm� I (Optional) 3
(�T 400) I o
O o LM o s
0 0 0 i 1 BE
FLAME"
_' �♦— IIIIIII
P
ONE LANE
e e c PREPARE
ROAD
H H TOSTO
AHEAD
ROAD
WORK
' A AHEAD
a:amw
low I A BB
, • A
------------------------i
T
Ort
1 mile _I
max.
B A
Buffer
Protection Vehicle
Tt
ROAD w/TMA(both Optional)
WORK See Chapter 4
Tf,D
AHEADAHEADBE
ONELANE PREPARE
ROAD To STOP Two Flagger Operation
AHEAD
CD (Optional) pco
LEGEND
10310 10290 10200 c
1 WORK LOCATIONS
WL 3 VT-999(NEW):
Install: evPE PIT
JUNCTION BOX 1730 UNFUSED
0• 0 REMOVE/ABANDON FACILI77ES_INSTALL FACILITIES
3 W INSTALL ADDITIONAL FACILITIESIMODIFYFACILITIES
-- > CONDUCTORS
0V.D.=1.88% O
VT-99 g FLCKR=3.13% Q INSTALL 1-4N AL-TX UG SECONDARY
PROVIDED d INSTALLED BYPGE
I 00 OWNER: -------- 1.3"CONDUIT
M TERRY MCEE PROVIDED d INSTALLED BYPGE-
Z Z 503-639-5049 APPROVED CONTRACTOR
WL 2 VT-998(NEW): a W INSTALL 1-#350 AL-TXUG SECONDARY
Install: e O j 10195 •PROVIDED&INSTALLED BYPGE
JUNCTION BOX 1730 UNFUSED '+� g 2 2�'
-------- 1-3"CONDUIT
O W W� •PROVIDED&INSTALLED BY PGE-
1 �h APPROVED CONTRACTOR
I
1 D
1 yp U ABANDON SECONDARY CABLE
1 O N 'GROUND ABANDONED CABLE PER LC24010-3
1 9� a CONDUIT
1
2 1 SPARE 1-3"CONDUIT
'PROVIDED&INSTALLED BYPGE-
VT-99am= APPROVED CONTRACTOR
Lu• Z
0-Z CIO TENSION:92#
1 0 Lu X O -. TENSION:77# o
1 ~ W/LUBESW KABLE ST
1 v C) 165' VT 5275
---------•A 350AL-TX-------
---- -3409 'n
A 1/0 AL-TX ra
A 350 AL-TX 1 a
A 350 AC-TX _
7r p2+n 1
Q 10170 1�a 10040
10120 1oaaD CREW NOTES:
o ♦ WL 1: DUE TO SHARED SECONDARY
0 25 50 100 Feet SERVICE, LINE CREW TO VAC DOWN AND
oil N
U) ABANDON ON OR NEAR PROPERTY LINE.
l l l l l t l l
WL 3: LINE CREW TO RETURN WLC 16
34314- PGE 1730 SPLICE BOX CONTACT PGE SERVICE SAVER TO YARD.
FOR APPROVED POS
MANUFACTURERST-
POLYMER COVER
MARxED LANDSCAPING NOTES
ELECTRJC
ELECTRICCONPIrr-
IdARk[R
WL 2: TOP SOIL&BUILD CONCRETE THINK PUN 4-IFOR-ERAII, PGE CONSTRUCTION DRAWING
BLOCK RETAINING WF AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED
2-ABOVE FINAL GRADE\ SAFETY
UNLESS IN SIDEWALK 1_
FINAL GRADE ELBOWS WL 3: TOP SOIL&
ADIUS Foreman Date:
4o CRUSHED RO K FIRST
3'TPERM SVCGeneral Foreman: Date:
CUT CONDUITS OFF TRAKCAP&INSTALL
2"MAX, 6•WELL COMPACTEDF 500 PULL STRING (Signature Only required for field construction chen ess'GROUND 3/4-MINUS BACKFILL SDPMI'ENGREVIEW. ASBUILTBYDESIGNERROD RY CU57 AROUNDAND UNDER SCALE ACCOUNT A ./0 NO
SPLICE BOX NY DEVL471)N FROM THIS DESIGN MUST3a 1R 2/5/2018 1 in=50 ft 1070001 1000004545 M2446973
BY THE PGE PROJECTMANAGER] TITLE
` PGE-REPLACE UG SEC-35OFT&REMOVE SVC SAVER
IZE
CALL 811 BEFORE YOU DIG CIRCUITURH s11
Pj L ATTENTION: /pG Ey DURHAM-BATTLER 11 x 17
49'TRENCH DUCT TO SERVICE TOP VIEW OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED LOCATION
SIDE VIEW MARK CAP&INSTALL BYTHE OREGON UTILITY NOTIFICATION CENTER. • 10195 SW KABLE ST,TIGARD,97224
I" 20'OF 5000 PULL STRING
PTIONA' THOSE RULES ARE SET FORTH IN OAR 952-001-0010 1 DESCRIPTION
ALL SECONDARY VAULTS(1730)TO BE INSTALLED ON PROPERTY LINES WITHIN THE UTILITY EASEMENT THROUGH 952-001-0090 YOU MAY OBTAIN COPIES OF FROM PD-3409 TO METER-10195 SW KABLE SHEET
AND AT FINAL GRADE.ALTERNATE LOCATIONS MUST BE APPROVED BY PGE AND WILL BE NOTED THE RULES BY CALLING THE OREGON UTILITY COUNTY SECTIONS WC)RK IMTH
ON THE SKETCH. NOTIFICATION CENTER ADMINISTRATION @(502-232-1987) WASHINGTON C2111C 1 OF 1
THE COST FOR RELOCATION OR ADJUSTMENT OF A 1730 VAULT WILL BE THE RESPONSIBILITY OF TO REQUEST UTILITY LOCATES CALL THE OREGON Krwwwhars� {�below WILSONVILLE DESIGN BY PHONE DRAWN BY
THE BUILDER OR DEVELOPER REQUESTING THE MOVE.PGE APPROVALS OF THE INS TALLATION WILL BE BASED UTILITY NOTIFICATION CENTER,811 AT LEAST Call Wtmyou . UNECREWCENTER Phil Merriman 971-804-3579 Misty Mesaga
ON FINAL GRADE AND LOCATION CRITERIA SET BY THE DEVELOPER AND HIS OR HER AGENT. 9 W SW SOECKVAN RE
2 BUSINESS DAYS PRIOR TO EXCAVATION .PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED