Loading...
02-22-2018 Council Newsletter Coundl NIewsk#er TIGARD Ptw ded to the Tigard C-4,Council or, a uve.k<j,&71' it, s>ay ahrfta. o,currant at February 22, 2018 1. Tigard Police Dashboard—January 18 gyres. A4"a:ch 13 Council Meeting Cancelled At the February 13" City Council meeting during the Lack of quorum Chiefs presentation it was brought to our attention that the 90`"Percentile for January's Priority 1 &2 Tuesday, Mar. 20 Workshop Meeting response times were mathematically incorrect. The 6:30 p.m.—Town Hall police department reviewed the calculation Tuesday, Mar. 27 Business Meeting methodology and realized that we erred in our 6:30 p.m.—Town Hall calculations. We identified the 90`'percentile but then took an additional step and reported the average of those times below the 90'percentile. The following corrections have been made: For January 2017 Priority 1 &2 calls,we had 335 calls. Normal reporting would place the average response time at 6:14, the 90' Percentile is 11:00 minutes. For January 2018 we had 331 calls. The average response time was 5:32 and the 90'Percentile was 10:00 minutes. The Police Department values the feedback and accuracy is important. 2. Supplemental info for CIP Briefing Engineering attached project sheets in advance of their briefing on Feb. 27 during the Council meeting. 3. Public Works Project Update Ma issa Grass attached an update of work underway in Public Forks. 4. Thanks! Sharing community appreciation vu-ith Council. 5. News Articles o Tigard promotes Safe Routes to School through art literacy o Police pull out all stops in search for white van 6. Council Calendar Tues., Feb 27 Business Meeting 6:30 p.m. —Town Hall Tuesday, March 6 Business Meeting 6:30 p.m. —Town Hall T3125 S�t7 Hall Bh d.tT pfil; OR?'+323 eh vc�viv't3 rd-6r gov Thune-.50'3.639'. 1.11 1'F ALX: 503.684.71,297-1 TDb 5()329 4172 Item# Newsletter: Tigard PD Strategic Dashboard For January 2018 2016 Population Estimate: 51,253 (Adopted Budget FY 2017-2018) rPetson ed Group A Offenses Jan 2017 Jan 2018 %Chg 2017 YTD 2018 YTD %Chg Crime 38 27 -38.95% 38 27 -28.95% ault 24 22 'a -8.33% 24 22 -8.33% Robbery 5 2 0 -60.00% 5 2 -60.00% Property Crime 172 260 51.16% 172 2600 51.160,14 Burglary-Residential 4 4/ 0.00010 4 4 0.00% Burglary-Business 4 2 0 -50.004o 4 2 -50.00% Burglary-Other 4 10 4 1 -75.00% UUI\fv 8 6 0 -25.00% 8 6 -25.00% Theft 84 12410 47.62% 84 1240 47.62°0 Vandalism 29 62* 113.79% 29 62 113.799/6 Societal Crimes 28 500 78.57% 28 50 78.57% DLIII 7 90 28.570% 7 90 28.57% Drug Offense 8 24 200.004o 8 24 0 200.00% Disorderly Conduct 2 6 '' 200.000 0 2 6 200.000110 Calls for Service Jan 2017 Jan 2018 %Chg 2017 YTD 2018 YTD %Chg Dispatched Calls 1606 1792 11.58% 1606 1-92 11.58% Self Initiated Calls 1377 1943 41.10% 1377 1943 41.10% Response Time Priority 1 &2 6:23 6:2? 1.04% 6:23 6:27 1.04% Priority 3 9.90 10.7' ' 8.79% 9.90 10.77 8.79°io Priority 4+ 10.03 10.501 4.69% 10.03 10.50 4.69% -it Community Snapshot Community Concerns Stranger Danger (3 Reports in Two Weeks) Multiple Reports of Transients Community Outreach and Events Upcoming Events Monthly Landlord Forum(1/10,''2018) Spring Shred Event(4/21,'2018) Tigard Breakfast Rotary K-9 Donation Presentation(1/23,'2018) r'Drug Turn in Event(4/28,'2018) *Ashwood Neighborhood Watch Kick-Off Meeting(1/31/2018) *New TPD Informational kiosk'go live'at Regal Bridgeport Cinema(1,!'24/2018) Coffee-with-a-Cop(2!10/2018) *Person Crime-Assault,Homicide,Robbery,Kidnap,Forcible/Non-Forcible Sex Offense *Property Crimes-Arson,Bribery,Res Burglary,Bus Burglary,Oth Burglary,Forgery,Vandalism,Embezzle,Fraud,Theft,UUMV,Bad Check *Societal Crimes-Drug Offense,Prostitution,XX capons,Curfew,DisCou,DUII,Family Offense,Liqour Laws,Peeping Tom,Trespass 1 =m Tigard PD Strategic Dashboard For January 2018 ` 2016 Population Estimate: 51,253 (Adopted Budget FY 2017-2018) Department Staffing Information Actual Budget %Budget Sworn 10 72 97% Non-Sworn 16.5 16.5 100010 Total Number of Personnel 86.5 88.5 98% Patrol Officer Staffing 33 35 Personnel Unavailable for Work Patrol All Other Overall #of Recruits in Pre-Academy - - #of Recruits in Academy 2 - 2 #of Recruits in FTEP 1 - 1 #of Personnel on Extended Sick Leave 1 - 1 #of Personnel on Military Leave 1 - 1 #of Personnel on Light Duty 2 1 3 #of Personnel on Administrative Leave - - - Total Personnel Unavailable to Work during some Period during the Month L7 11 8 Total Officers Available to work PATROL some period during the Month 26 Operational Effectiveness Snapshot Budget Information is based on the best available data. FY 2016-2017 Budget FY 2017-2018 Budget Percent YTD Status Percent YTD Status Department Budget Actual Budgeted Actual Budgeted Administrative 63% 5840 5% 5140 58% -740 Operations 54% 58% -440 54% 58% -5% Services 540/'0 58% -4% 58% 58010 -1% Total Department Budget 55% 58% -4% 55% 58% -3% Budget Information is based on the best available data. FY 2016-2017 Budget FY 2017-2018 Budget YTD Percent YTD us Department Overtime Actual Budgeted Actual Budgeted Administrative 51% 58% -80/0 53% 58% -5% Operations 58% 1500 354 0 58%* -23% Services 460/0 58% 10 -13% 60% 58%0 2°o Total Overtime 1 63% 58% i 5%1 42% 58% -16% 2 Tigard PD Strategic Dashboard For January 2018 2016 Population Estimate: 51,253 (Adopted Budget FY 2017'-2018) Coils For Service - S Yeat` retial -.1.inuary JANUARY JANUARY PUBLIC DEMAND CALLS 1192 1117SELF INITIATED CALLS 461 U1 TTM mom Response Times - 5 Year Trend -January For— PRIORITY 1-2 PRIORITY 3 :IL 9-54 Priority 1= Priority 3= Imminent threat to life Urgent call where crime prevention is needed Priority 2=Immediate threat to life,occuring now Priority 4+ =Cold crimes or public assistance 3 ' Tigard PD Strategic Dashboard For January 2018 ar 2016 Population Estimate: 51,253 (Adopted Budget FY 2017-2018) St LF INITIATED PUBLIC[3t±OM JL1Y�-1� lAY-ix i00.yVV i1j'i4I Elm ImAUG M LY is L JUNC 1lfNfMEMELUA MAY APR APR M-AR MAP JAM-.4.71.414 1 � F I. ��L% r C? Iwo ! AI 0 _Cn, iXX 15k;;, Yk 2506 Tracking Code Cases -January Overdose 0 0 0 1 0 6 Police Hold 0 10 9 10 10 0 Suicide 0 0 0 0 0 1 Attempt Suicide 0 4 3 4 5 14 DHS Referral 33 39 44 34 33 43 Vulnerable Adult mull 8 1 3 4 2 Dom Violence 9 6 11 7 ; 13 DV No Crime ':L :: :*<,,11 0 13 8 8 ORC Theft 4 14 1 1 1 2 3 1 3 Graffiti 2; 22 1 31 1 9 5 1 36 4 Tigard PD Strategic Dashboard For January 2018 2016 Population Estimate: 51,253 (Adopted Budget FY 2017-2018) n - 9Dt ercerstile PRIORITY ■ ti w ■ r ■ w ISON Jan 2017 a Jan 2018 f rf rr 1-0-11:00 i r rr Priority • Prior" 90th Percentile Response Time Jan 2017 Jan 2018 °.`o Chg 2017 STD 2018 YTD °46 Chg Priority 1 &2 11:00 10:00 -9.09% 11:00 10:00 0 -9.090o Priority 3 25:18 10:00 -60.47% 25:18 10:00 0 -60.47% Priority 4+ 23:00 19:00 -17.390,16 23:00 19:0010 -17.39% The 90th percentile calculations are on Dispatched Calls Minus Cancelled calls, Duplicate Calfs,and Qued out calls. Minus calls that were missing Dispatched Times � �inus calls that were missing Arrival Times. BHI - 'Transient Total Calls Logged: 239 #of Calls-BHI 120 #of Calls Transient 135 #of Calls Dispatched 171 #of Calls Self Initiated 68 Total Time Spent 159:21:26 (hr:min:sec) 5 Item#n/ ', City of Tigard Newsletter: Z'ZZ-_4 C7 Memorandum To: Honorable Mayor& City Council From: Lori Faha, P.E., City Engineer Re: Supplemental Information for February 27, 2018 Council Workshop Meeting Briefing on Capital Improvement Plan (CIP) Projects Date: February 22, 2018 Attached please find copies of the most recent status reports for all FY2017-18 CIP projects managed by Engineering. These reports summarize work, budget and schedule status for each project. The reports support the CIP status report that will be presented to Council at the February 27 Workshop Session. Enclosure FACILITIES Civic Center Visioning Plan cMillan x 91020 1/16/1$ The existing 20-year facilities plan(developed in 2008)is in need of updating or being replaced.A space and facilities strategic plan Descriptionis needed to not only determine the best use of existing space but to also determine the best strategy for long-term needs.The space planning includes assessment of staff,police,recreation and other community needs. BudgetOn Target * M WA Architects—Closed Schedu;eQI MinorlssueContracts MWAArch itects—c„ 6/30/18 Scope On Target Total Project Budget: $565,000 Status: Planning Total Project $359,764 External $460,000 $45,887 Internal � $77,000 Project Budget FY 2017/18 $51,078 External $164,000 Q2 $9,696 Internal $40,000 Q1 Total Project%Spent: 63% Project Managers Total Project Estimated%Complete: 60% 1) Contract awarded—July 2016 2) Task Force Committee formed—July 2017 Project extended to FY18 to incorporate input from a Citizen Advisory Group • Completed public involvement efforts,including stakeholder interviews,focus groups and phone surveys • Evaluated future space requirements • Evaluated existing site characteristics SnapshotofWork • Evaluated site massing and Schedule • Completed adjacency matrix for site Progress • Completed review FTE forecast memo from ECONW • Preliminary cost estimates completed • Formed Citizen Advisory Group • Citizen Advisory Group has been meeting to discuss Local Option Levy • Citizen Advisory Group has begun meetings to discuss Civic Center needs ff"..77T.7-, • Citizen Advisory Group will tour the West Linn Police facility • Provide a narrative discussion of resiliency strategies regarding Bond Measure to City Council Risks/Issues • This effort will identify risks and issues associated with a bond measure for a Civic Center • Q1 project budget carryforward in FY18 • Project extended into FY18 W.+ I 1111liwiiiiiiiiiiiiiiii R 111 -751A Project Name: I Fanno Creek Remeander(City/Clean Water Services) i Andy Newbury Project Number: 92013 1/16/2018 This joint project with Clean Water Services will result in lengthening the stream channel,which is recommended in order to lower or eliminate the rate of incision or erosion by decreasing the steepness/slope of the streambed.This will require the removal and replacement of the Ash Avenue Pedestrian Bridge,replacing it with one designed for better flood passage.The project also includes reconstructing a segment of the Fanno Creek Trail providing for an upgraded trail that is not subject to failures due to creek bank erosion. Budget On Target * Clean Water Services Schedule 67 Minor Issue Scope On Target Total Project Budget: $",409,900$1,600,000 DesignCity of Tigard Budget: $6801000$675,000 Total Project $37,501 External $632,000 $15,096 Internal = $43,000 Project Budget FY 2017/18 53,540 External $455,000 $3,916 Internal . $15,000 Total Project%Spent: 9% Project Manager's Total Project Estimated%Complete: 9% ' *CWS is delaying construction to spring/summer 2018 • IGA signed by CWS and City ONE.■ , . • CWS to complete permitting work • Invitation to bid to be advertised in February • Continued streambank failures with potential impacts to the Fanno Creek Trail and a sanitary sewer line under the trail are at risk until the project is completed • Due to permitting delays,construction is not scheduled to begin until spring 2018 and ending in fall 2018 • Total project budget increase approved in FY18 budget to account for updated cost estimate Project Name; Dirksen Nature Park-Oak Savanna Restoration Carla Staedter e Project Number. 92016-02 1/16/18 F A nine acre area of Dirksen Nature Park houses some remnant Oregon white oak populations.This area is being restored back to a native oak savanna to be used for education and enjoyment by the public.The project will remove non-native trees,shrubs and r grasses.Native grasses and wildflowers will be planted along with additional oak trees and a native shrub hedge around the savanna.A walking trail through the savanna will be lined on each side with rustic buck and pole fencing made from trees taken down as part of the restoration. On Target * Ash Creek Forest Mgmt.—6/30/19 On Target On Target Total 2roject Budget: $318,000 Status: Construction Total Project 183 835 External $278,000 Project Budget Internal $39,000 FY 2017/18 X29.828 External $79,000 5 449 Internal $10,000 Total Project%Spent: 65% Project Manager's Total Project Estimated%Complete: 80% 1) Plant Sedges and Rushes—October 2017 to March 2018 4) Oak and Native grass planting—Fall 2018 2) Additional bulb planting—Dec 2017 Project Schedule 3) Spring Spray—2018 • Sedges,Rushes,and Bulbs Planted late fall early winter of 2017 • Plants have germinated and are becoming established. Public signage has been installed to encourage staying on the trail so seeds can germinate and become established • Spring Spray 2018 • Summer Monitoring for Weeds and Spray as Needed • Fall 2018 planting of oaks and seeding of native grasses • Long-term management of Oak Savanna requires grazing or burning. Most of the savanna at Dirksen is wet meadow. If grazing is chosen,need to get DSL/CWS approval to have animals in a wetland. If burning is used,need to have approval and support of TVFR • Operations staff need to be updated and educated about the long-term care of the oak savanna • Extra seeding and weed removal of the area between Tigard Street and the edge of the savanna will be required as an interim solution until half street improvements and the paved trail are constructed in 2021 or later Dirksen Nature Park-Oak Savanna Overlook Carla Staedter • 92016-03 1/16/18 Installation of a hard surface overlook at a high point in the Oak Savanna will provide park users an area to experience and view the newly-restored savanna. The overlook will include a walkway and will incorporate a stone veneer seat wall and basalt columns laid sideways to discourage entry into the savanna. These basalt columns will have descriptive words sandblasted into their faces describing the character of a savanna. Bronze replicas of plants,insects and animals that live in an Oak Savanna will be embedded into the paving of the overlook. ,�.qq On Target * Rip Caswell(Sculptor)—Closed L� On Target * Lee Contractors—10/31/17 •• On Target + Ash Creek-6/30/19 Total Project Budget: $94,000 Status: Construction Total Project $69,935 External $73,000 $20,553 Internal $21,000 FY2017/18 $36,935 External $40,000 $7,413 Internal $8,000 Total Project%Spent: 96% Project Manager's Total Project Estimated%Complete:99% 1) Begin commissioning of Brass Replicas—July 2016 4) Bidding—May 2017 2) Design—Jan 2017 5) Construction—July 2017 3) Permitting—April 2017 6) Complete sandblasting on overlook rocks—March 2018 *2/17/17 Schedule updated to reflect grant • Overlook construction is completed and bronze animals are installed • Additional native flower and rush planting near the overlook by NW Youth Corp • Sandblasting of interpretive words on the basalt rocks • Waiting on final invoice from Lee Contractors to assess final cost of project • Additional native wildflower bulbs have been installed in the vicinity of the overlook Dirksen Nature Park-Nature Play Areas Carla Staedter 92016-04 1/16/18 This project will construct two play areas designed to provide park users with the opportunities to climb,run,jump and build with rocks,logs and other natural features.One area will be designed for toddlers and younger children while the other will provide more challenging natural play elements.The play areas will be sited on the outer edge of the park's mowed playfield bordering a forest.They will be covered in bark chips and adjacent to the future restroom/interpretive shelter. Budget On Target ScheduleOn TargetContracts Scope On Target Total Project Budget: $2,26,090$333,000 Total Project $195 External $305,000 $7,332 Project Budget Internal $28,000 FY 2017/18 External $10,000 $2,123 Internal $10,000 Total Project%Spent: 2% Project Manager's Total Project Estimated%Complete: 5% 1) Park design completed—April 2016 4) Construction—July 2018 • 2) Permitting completed—March 2018 5) Substantial completion—Oct 2018 3) Bidding—April 2018 • • Extra time was needed to coordinate harvesting of the library sequoia an opportunity that was unexpected when the • budget was developed. Sequoia wood will be incorporated into Nature Play elements ' • Sequoia trunk and branches harvested and stockpiled at Dirksen Nature Park rr � • In-house update of nature play area design to incorporate library sequoia wood • In-house preparation of sequoia logs by parks staff to prepare for installation in Summer/Fall 2018 • Parks staff is very busy with routine maintenance so there is some risk of relying on them to prep logs. Back-up plan needs to be developed to ensure that logs are ready to be installed this summer if staff is too busy to complete the project • Project construction was moved to summer 2018 to respond to funding availability,above schedule reflects approved adjustments • Project budget increase included in approved FY18 budget,reflects updated construction cost estimating r Dirksen Nature Park—Forested Wetland Restoration and Jeff Peck B Boardwalk 92016-05 1/16/18 A forested wetland is located in the center of Dirksen Nature Park. The health of the wetland is threatened by numerous demand trails and the presence of non-native plants. The project will restore and protect the wetland by removing non-native vegetation and abandoning old demand trails,replanting with native emergent vegetation and establishing a new trail and elevated • boardwalk. The boardwalk will allow park users an up close and personal look at this watery and unusual wetland. A sect . Due to construction cost increase,the second boardwalk will not be funded at this time. ,Target * Western Wood Struc.—12/31/17 * Morgan Holen—12/30/17 On Target * Lee Contractors—10/31/17 * Carlson Testing—12/30/17 e• 0 1 Minor Issue * Geotechnical Resources—6/30/18 * NW Youth Corps-2/09/18 Total Project Budget: $295,000 Status: Construction Total Project $228,982 External $265,000 "i6 Project Budget Internal m $30,000 FY 2017/18 $228,401 External 1 $265,000 20 943 Internal $10,000 Total Project%Spent: 95% Project Manager's Total Project Estimated%Complete: 951 J 1) Substantial completion—Oct 2017 Project Schedule 2) Boardwalk Completion—November 2017 3) Forested Wetland Restoration—February 2018 Snapshot of Work • Boardwalk and soft path completed and Schedule Progress • The forested wetland to be restored under separate contract with the NW Youth Corps • The second boardwalk to be constructed at the existing Fanno Creek Trail has been removed from the project scope due to escalating construction costs. It will be considered a stand-alone project in the future when funding becomes available. This allows for the remainder of the project to match the budget . - Dirksen Nature Park-Interpretive Shelter and Restroom Jeff Peck . - 92016-06 1/16/1R = This project will construct a covered interpretive shelter with attached restrooms adjacent to the nature play areas. It will include a hard-surfaced pathway to the Fanno Creek Trail,benches,picnic tables,covered awning and all required site utilities. The facility will be designed to accommodate undercover outdoor learning and picnicking and provide a needed gathering area for the park and adjacent Fanno Creek Trail. On Target * TS Gray Construction—Closed On Target On Target Total Project Budget: $69,009$736,000 ttin Total Project External $694,000 $2,725 Internal $42,000 Project Budget FY 2017/18 External $175,000 $2,725 Internal �$15,000 Total Project%Spent: 3% Project Managees Total Project Estimated%Complete: 2% 1) Grant application and presentation—June 2016 5) Purchase Romtec Restroom—March 2018 2) Grant award—July 2016 6) Begin Construction—July 2018 3) IGA signed by Council—April 2017 7) Substantial completion—October 2018 4) Permitting—February 2018 • Performed constructability review to refine costs to build restroom structure • Requested most of remaining PRAB recommendation to use Parks payment funds to help pay for increasing cost of restroom/shelter. Increased project budget in FY2018 budget • Amend the 1200-C erosion control plans for the Restroom Shelter and Nature Play improvements • Amend Nature Play layout plan • Permitting of restroom shelter • Purchase restroom shelter Risks Issues 1 • Project delivery schedule adjusted to start earlier to meet requirements of grants recently acquired from State Parks • Project budget adjustments reflecting results of a constructability review are included in the FY18 budget NNW-- PARKS Project Name: Tigard Street Her stage Trail and Public Space Jeff Peck a • 92034 1/16/18 The city has signed a lease for the Use of the inactive railroad corridor from Tiedeman Avenue to Main Street.The City was awarded a Connect Oregon VI Grant and Washington County MSTIP funding to assist with the development of 3/4 mile,12'wide multi-use pathway with amenities including fencing,lighting,landscape,and art features. A public open space will be created adjacent to Main Street and the Tigard Chamber of Commerce building. This project is related to LQC 98009 which used porous paving material to create a temporary pathway in advance of the full project. +; Minor Issue * Walker Macy—Closed * Alta—10/25/18 On Target * CESS NW—Closed * Pacific Habitat-1/31/19 On Target * AMEC—Closed Total Project Budget: $;6203,999$1,300,000 YFf�jilt- �i City of Tigard Budget: $352,000 Total Project $168,112 External $1,200,000 $73,589 Internal _$100,000 Project Budget FY 2017/18 $61,118 External $890,000 .$26,903 Internal 0 $40,000 Total Project%Spent: 19% Project Manager's Total Project Estimated%Complete: 15% 1) Connect Oregon grant award notification—Nov 2016 4) Begin design services—May 2017 2) Grant agreement between City and ODOT 5) Invitation to bid—February 2018 Grant application—Feb 2017 6) Begin construction—May 2018' 3) RFP solicitation for design and construction 7) Substantial project completion—September 2018 administrative services—March 2017 Snapshot of Work • 1St public engagement meeting—June 291h and Schedule • 2nnd public engagement meeting—July 27th Progress • 30%Design Submittal received—August 24th • 31d public engagement meeting—August 31st • • 60%design submittal • Permitting • Aesthetic elements including public plaza amenities may be limited due to ODOT rail limitations and requirements • All desired amenities will cost more than current budget,and the city is exploring additional grant funding opportunities • Project budget updated in FY18 budget to reflect updated internal cost estimate Project Name: Fannn Creek Trail Connection(RFFA) Mike McCarthy Project Number: 92046 1/16/18 This project constructs four segments of the Fanno Creek Trail.Segment 1-Grant Avenue to Woodard Park,Segment 2-Ash Avenue to Hall Boulevard,Segment 3-City Library to Bonita Road,Segment 4-85th Avenue(south of Durham Road)to the Tualatin River.There is a separate CIP(#92013-The Fanno Creek Remeander)which will realign the trail from Main Street to Ash Avenue.The Regional Flexible Funds Grant is federal dollars. BudgetOn Target * Ash Creek—Closed ScheduleMinor IssueContracts Scope r,. On Target Total Project Budget: $6,461•,999 $5,486,000 Status: Design City of Tigard Budget: $,1,1"'-1,999 $1,140,000 Total Project $144,502 External $930,000 $95,431 Internal $210,000 FY 2017/18 $132,812 External $455,000 $15,078 Internal — $60,000 Total Project%Spent: 21% Project Manager's Total Project Estimated%Complete: IS% 1) Design team selected—Feb 2016 ■ 2) Design Start—Nov 2017 3) Construction—2020-21 • Design is in progress • Vegetation has been trimmed to allow for survey and other field evaluation work Survey and geotechnical evaluation is in progress • Potential alignment has been identified • Design work continues • Technical and citizen advisory committees tentatively begin meeting February 28 • Public open house tentatively March 7 • Design and construction contracts being run through ODOT • Extended duration of consultant scope and fee negotiations by ODOT has required more city staff coordination time and cost than originally anticipated • Federal transportation funds and ODOT are only allowed to be spent on some trail amenities;Separate city funds will be necessary to really provide a nice trail user experience • Due to project delays,projected unused FY2017 funds were moved forward in FY2018 budget • City portion of total project budget increased slightly with FY18 budget to reflect latest estimates 72 Tiedeman Crossing/Fanno Creek Trail Carla Staedter .. 92051 1/16/18 With the Open Spaces Bond Measure,Metro will fund the design and construction of the Tiedeman Connection gap in the Fanno Description Creek Trail.The project will realign the trail near Tiedeman Avenue to address safety issues.Construction will include a new pedestrian bridge over Fanno Creek. O Minor Issue * IGA-Metro O Minor Issue * IGA Amendment pending with Metro O Minor Issue Total Project Budget: $660,000 Status:-Conwr-U—Com Total Project S188.004 External $595,000 $69,170 Internal x$65,000 FY 2017/18 $6,303 External $365,000 $8,447 Internal -$20,000 Total Project%Spent: 38% Project Manager's Total Project Estimated%Complete: 58% 1) Bridge fabrication contract released-July 2017 4) General construction start date-June 2018 2) Bridge Delivery date-TBD but prior to June 2018 5) Complete new trail and install bridge-October 2018 3) Bid general contract-March 2018 6) Project complete-December 2018 • Bridge fabrication contractor selected. Shop drawing review completed. Working on schedule for bridge delivery prior ■ to June 2018 ■ • Percent complete and budget spent numbers are misleading since%of the cost of the bridge will not be billed until delivery • Site construction delayed to summer 2018 due to delayed permitting and difficult bidding climate • Set date for bridge delivery • IGA amendment to Council to reflect additional$150K of funding provided by Metro • Bid general contract in February or March 2018 to raise likelihood of lower site work bid • Difficult bidding climate • CWS requesting easement encroachment agreement that may have long term costs to the city 1mr- Metro has agreed to fund$150K of project cost/scope increases due to increasing bridge width,current bidding climate, and additional floodplain work. IGA amendment reflecting this increased funding will go to Council in December 2017 Have entered into an agreement with Clean Water Services to take over site planting and plant establishment resulting in a project cost savings of approx.$25K Bull Mountain Park Trail Jeff Peck OWN 92052 1/16/18 Paved trail connection through the park.This project supports the vision statement in the City of Tigard's Strategic Plan:"The most ■ walkable community in the Pacific Northwest..."It helps serve as a match for the Friends of Bull Mountain Park Nature in Neighborhood Grant from Metro. BudgetQ Minor Issue * Lango Hansen—12/31/17 ScheduleQ Minor IssueContracts MOU-Friends of Bull Mountain Park-4/30/17 Amendment 1 Scope Q Minor Issue Total Project Budget: X89,000$160,609 $177,500 Construction Total Project 14 7 External $i25,000 $3 985 $142,000 QI Internal $35,000 FY 2017/18 $57,415 External $60,000 QI $8,439 Internal 0000' $5,000 Total Project%Spent: 103% Project Manager's Total Project Estimated%Complete: 99% 1) Contractor selection—July 2016 3) Begin construction—Oct 2016 2) Permitting—Sept 2016 4) Project completion—June 2017 • Contractor has substantially completed the paved loop through the park,the nature play,and the picnic shelter Upcoming Work • Volunteer landscape planting Items • Punch-List to Final Completion • Segments of the trail are to be removed and repaved to meet ADA IM • Continuing demand for internal staff time for technical assistance to Friends of Bull Mountain Park • Paved path adjustments may be needed to provide desired ADA accessibility • Some trail sections are being adjusted to meet ADA • Thicker pathway section added to accommodate wet weather construction • Final picnic shelter footing design provided • Electric meter relocated away from pathway • Budget adjustment necessary for FBMP approved by PRAB and City Council • FY18 Q1 adjustment for additional staff time to be added to budget above $40,000 external funds for FBMP approved by PRAB and City Council in FY2018 budget $20,000 internal funding added in FY2017 to continue project coordination and monitoring of the project Americans with Disabilities Act Transition Plan Lori Faha • 92055 1/16/18 ' The city must complete an up-to-date Americans with Disabilities Act(ADA)Transition Plan. The ADA Transition Plan will focus primarily on accessibility and barrier removal needs in the city transportation,parks,and facilities(buildings)system. The city has ■ previously completed accessibility and condition inventories of some parts of these systems. This data will be utilized in this effort. The Plan will also integrate and coordinate the schedule of needed improvements with ongoing and planned projects such as the Pavement Management Program. O Minor Issue MIG—12/31/19 Minor Issue •• On Target Total Project Budget: $225,,-__ Total Project Project Budget $117 External $200,000 $17,597 Internal _$25,000 Total Project%Spent: 6% Project Manager's Total Project Estimated%Complete: 5% 1) TBD with consultant,identified need to extend project into FY19 Snapshot of Work • Advertised for citizen advisory group members and Schedule • Held staff kick-off meeting and received input on efforts underway and needs Progress • Selected consultant,contract approved by council • Kick-off meeting with staff and consultant • Create citizen advisory group • Consultant start data collection • An up to date plan is needed ASAP to comply with regulations and provide legal coverage • Consultant fees were somewhat larger than budget after negotiating needed scope elements—project budget increase for consultant fees and additional staff time needed to manage longer project schedule are included in FY19 requested CIP budget PARKS Project Name; Saxony Demolition&Remediation(12535&12533 SW Main) Andy Newbury = Project Number: 97013-01&97013-02 1/16/18 Demolition and remediation of contaminated soils on the Saxony-Pacific properties on Main Street to allow for redevelopment of ■ the site into a combination of public space and private development which would include commercial and residential or office spaces.Demolition and cleanup costs partially funded by two$200,000 grants from EPA. 0 On Target —8/15/19 0 Minor Issue ]EVA son Environmental—Closed On Target ast Services—Closed Total Project Budget: $550,000 Status: Complete Total Project $511870 External $510,000 $32,348 Internal W$40,000 Project Budoet FY 2017/18 $325,027 External 627,999 $20,008 $440,000 QI Internal . $5,000 $32,000 QI Total Project%Spent: 99% Project Manager's Total Project Estimated%Complete: 95% 1) Hire consultant for cleanup plan—Sept 2016 4) Bid and award—May 2017 2) Public involvement—Oct 2016 5) Begin cleanup and demolition—June 2017 Project Schedule 3) Final Cleanup plan and bid documents—Mar 2017 6) End cleanup and demolition—Aug 2017 *Project demolition schedule extended through summer 2017 due to regulatory in-water work window requirements • Demolition completed • Existing sanitary sewer lateral capped • Continued soil monitoring • Project closeout • Received one bid response. The bid was higher than the engineers estimate and additional money has been requested in the Q1 supplemental. Final project costs will now be less than construction contract amount due to low level of contaminated soil found g SANITARY SEWER Fanno Creek Slope Stabilization(Arthus Court) Andy Newbury 93009 1/16/18 Sanitary sewer piping and a section of Fanno Creek Trail are being threatened by erosion on the outside bend of Fanno Creek. A section of the bank along Fanno Creek near Arthur Court has eroded due to high water levels. This is threatening a sanitary sewer main and a portion of the Fanno Creek Trail. The project will restore the section of eroding bank and divert high flows from the impacteI areas. •: 0 Minor Issue f* lnMtergity EC—Closed * Shannon&Wilson—6/30/18 ^� On Target ogan Holen—Closed V Minor Issue Tree—Closed Total Project Budget: $1,155,000 Status: Design Total Project $114,943 External $1,030,000 $49,525 Internal — $125,000 FY 2017/18 $8,395 External — $50,000 $4,922 Internal —$10,000 Total Project%Spent: 14% Project Manager's Total Project Estimated%Complete: 15% 1) 30%design—Dec.2017 5) Bid and award—May 2018 2) 60%design—Ja n.2018 6) Begin construction—June 2018 Project Schedule 3) Final design—Feb.2018 7) End construction—August 2018 4) Permitting—Apr.2018 • Survey Completed •a ■ • Meetings with DSL,Corps and ODFW to discuss proposed design • 30%design • Continued streambank erosion may occur with potential impacts to the Fanno Creek Trail and a sanitary sewer line near the trail at risk until the project is completed • If an individual permit from DSL/Corps is needed for this project,project construction will be delayed until next summer • Budget increase has been requested due to additional bank repairs needed SANITARY SEWER East Tigard Sewer Replacement Jeff Peck >r 93013 1/16/18 This project is in the Sanitary Sewer Master Plan and involves increasing the capacity of an existing sanitary sewer line(serving the area north of Hunziker Street)to prevent overflows and to improve the access for routine maintenance.It will also provide sanitary sewer service for a portion of the undeveloped adjacent parcel(the Fields property).Clean Water Services(CWS)is funding the majority of this project. .: 0 Minor Issue * CESS NW(due-diligence)—Closed ■ . & I On Target * CES NW—12/31/17 +• 0 1 Minorlssue * Braun—,7, 2/28118 Total Project Budget: 2,260,000 Status: Constr tion City of Tigard Budget: $246,999—$219,900$264,000 Total Project External $1,374,278 $1,713,009 "� $2,107,000 Q1 $149,898 Internal W $134;900 + $153,000 FY 2017/18 External $1,123,656 $i,296,999 " $1,815,000 QI $56,642 Internal $60,000 Total Project%Spent: 72% Project Manager's Total Project Estimated%Complete: 80% Project 5chedule 1) Design phase—Jan 2016 3) Construction phase begins—August 2017 2) Permitting and ROW negotiation—Oct 2016 4) Substantial project completion—February 2017 • 15"Sanitary Sewer mainline installed and connected to existing system in Hunziker Road .-.MIAM • 8"Sanitary Sewer mainline through Potso Dog Park parking lot to Wall St and one 8"creek crossing completed LOOK AHEAD Upcoming Work • One creek crossing Items • Reconnect one existing sewer service • Site restoration • A Contamination Media Management Plan(CMMP)was created to assist with removal of contaminated soils • One remaining easement acquisition requiring eminent domain proceedings • Additional utility locates required. This resulted in an increase to consultant contract • Additional scope and fees added to manage contaminated soils on site • Additional funding approved by CWS and City Council to cover high construction costs SANITARY Project Name: J Pacific Highway Sanitary Sewer Line Andy Newbury = Project Number., 330SS 1/16/18 This project will repair approximately 3,520 linear feet of sanitary sewer line from 65th Avenue to Pfaffle Street within the Description southbound lane of Pacific Highway.If possible,a cured-in-place-pipe(CIPP)trenchless construction method will be used;this should minimize traffic disruption on Pacific Highway. BudgetOn Target * Century West—Gf4GA46/30/18 ScheduleOn TargetContracts Insituform Tech—6/30/18 Scope ® On Target Total Project Budget: $340,000 Status: Construction Total Project $38,074 External $303,000 $9,223 Internal � $37,000 Project Budget FY 2017/18 $2,195 External $250,000 $3,395 Internal =$15,000 Total Project%Spent: 14% Project Manager's Total Project Estimated%Complete: 20% 1) Hire consultants—Oct 2016 5) Permits—July 2017 2) 30%design—Feb 2017 6) Bid and award—July 2017 Project Schedule 3) 60%design—Mar 2017 7) Begin construction—March 2018 4) Final design—June 2017 8) End construction—May 2018 • Begin construction which is currently scheduled for March 2018 • Due to current bidding climate,the construction completion date was extended to the end of the fiscal year. This resulted in receiving a low bid below the Engineer's estimate East Fork Derry Dell Creek(Viewmont Ct to Fairhaven Way) Carla Staedter 93057 1/16/18 Erosion of the East Fork of Derry Dell Creek has resulted in exposed manholes and laterals of the adjacent sanitary sewer system from approximately Viewmont Court to Fairhaven Way adjacent to 110th Avenue. The incised stream areas will be brought back up to previous stream elevations to provide protection to the sanitary sewer system. Project will include new stream cross sections and the insertion of wood logs and bank treatment. •: �a�i On Target ( On Target On Target Total Project Budget: $980,000 Status: Planning Total Project External $908,000 .$4,14:1 Internal =$70,000 Project Budget FY 2017/18 External $275,000 $4143 Internal �$40,000 Total Project%Spent: .5% Project Manager`s Total Project Estimated Complete:1% • 1) Schedule Pending Meeting with On-Call Consultants • • Met with HDR,their fees were coming in above the allowed$100K to use the on call services contract • Meeting with Otak to see if they have a recommended approach under$100K for consulting fees • Scoping and development of schedule • • Contract with on-call consultant team • Meeting with The Soil and Water Conservation District and the Tualatin River Watershed Council to discuss partnering on outreach to private landowners • Project construction schedule could move to Summer 2019 if an Individual Corp and DSL permit is required • Project will be scaled back to reflect changes in site conditions as a result of private landowner stream restoration efforts. Light touch grade control is all that will be required in lower reaches of the creek. While creek bed below the Gaarde Culvert will require stream channel reconstruction. These site changes will cut the cost of the project in half Fanno Creek Sanitary Siphon Repair And Newbu s Y rY 93058 1/16/18 An existing sanitary sewer line and manhole are exposed due to bank erosion along Fanno Creek. This project will use engineered structures to stabilize the bank and protect the exposed sewer line. On Target * AKS-6/30/18 On Target ® On Target Total Project Budget: * Total Project S- External $260,000 53,660 Internal $30,000 FY 2017/18 External $50,000 $3,660 Internal $22,000 Total Project%Spent: 1% Project Manager's Total Project Estimated%Complete: 1% 1) 30%design—Dec.2017 5) Bid and award—May 2018 2) 60%design—Jan.2018 6) Begin construction—June 2018 Project3) Final design—Feb.2018 7) End construction—August 2018 4) Permitting—Apr.2018 • Survey Completed + • Geotechnical explorations completed • Reviewed design alternatives Upcoming Work, • 60%Design Items I • Continued streambank erosion may occur with potential impacts to an existing sanitary sewer manhole and sewer line in and adjacent to Fanno Creek • The project scope has changed. The exposed siphon within Fanno Creek will be removed and the manholes that are near the eroded bank will be moved further away. New lines will be placed by directional drilling Slope Stabilization(Derry Dell/118th Court) Carla Staedter 94016 1/16/18 The project will design and construct slope stabilization measures for an active slide just downstream of 118th Court.The project will also restore a length of Derry Dell Creek where erosion and stream incision are contributing to these landslides and threatening sewer infrastructure.As part of the permitting process,stream channel mitigation will be required.The project will strategically identify and implement stream channel mitigation sites between 118th Court and 115th Avenue.Stream channel mitigation sites will be selected to restore areas of Derry Dell Creek that are currently incising and without restoration would cause future erosion threats to private property,and existing sewer infrastructure. On Target * Shannon&Wilson—Closed On Target * Wolf Water Resources—6/30/18 On Target Total Project Budget: $1,,26,+0,999$1,325,000 Status: Construction Total Project $456,598 External $1,224,000 $56,015 Internal M$101,000 FY 2017/18 $311,066 External $1,016,000 $21,720 Internal 0$40,000 Total Project%Spent: 39%invoice pending for this time period Project Manager's Total Project Estimated%Complete: 85% 1) Survey/wetland—Jan 2017 4) Final design—April 2017 7) Begin construction—July 2017 2) 50%design—March 2017 5) Permits—June 2017 8) End construction—March 2017 3) 90%design—April 2017 6) Bid and award—June 2017 • • Rock Slide Repair Embankment in Place as well as streambed reconstruction at the base of the slide repair • • Outfall Repair is completed •: • New pedestrian bridge is installed Upcoming • Non-native removal and replanting of vegetated corridors as required by Service Provider permit through Clean Water Items Services • Locals have been dumping large amounts of yard debris where we need to replant streambanks. Will need to do outreach to avoid additional dumping fees and failed vegetated corridor plantings should dumping not stop Stormwater Master Plan Lori Faha = WNW 94037 1/16/18 Tigard's Stormwater Master Plan has not been updated in over 30 years.The environmental regulations regarding the management of stormwater infrastructure have changed dramatically,Tigard's stormwater infrastructure is aging and many stream systems in the city are experiencing erosion issues with risk of infrastructure and property damage.This Master Plan will describe projects and programs that will address the regulatory requirements and will also identify and prioritize projects to address needs for the existing stormwater system. Budget Minor Issue * OTAK Inc.(Aerial)—Closed ScheduleMinor IssueContracts OTAK,Inc.—12/31/17 ScopeOn Target * Ash Creek—Closed Total Project Budget:$3,23,999$400,000 Status: Planning Total Project $274,047 External $295,000 $102,617 Internal $105,000 FY 2017/18 $8,585 External $20,000 $18,170 Internal $10,000 Total Project%Spent: 94% Project Manager's Total Project Estimated%Complete: 95% 1) Issue RFP for consultant team—Jan 2016 3) Early action projects identified for budgeting—Nov 2016 Project Schedule 2) Consultant Notice to Proceed—May 2016 4) Complete master plan project—Aug2917 Dec 2017 Note: master plan adoption process delayed for discussions about costs and implications of overall recommendations Snapshot of Work • Consultant and staff work to compile and analyze background information has required more effort than planned due to and Schedule lack of prior master plan Progress • Final draft of master plan placed on website for viewing and comments • Presented draft plan at Council Work Session 878 T- Upcoming Work • Council consider for adoption • Internal and consultant staff time to collect,compile and assess background information from a multitude of sources has been higher than anticipated as the City has not prepared a master plan in 35 years. Additional project budget approved in FY18 budget. Some additional staff time cost anticipated for extended adoption process • Part of FY2015/16 project budget moved to FY2016/17 in a technical adjustment,due to May 2016 start date for consultant work 0 Schedule and budget increased and updated in FY2017/18 budget 124th Ave/Ann Court Culvert Replacement Andy Newbwy # 94038 1/16/18 An existing 30th storm culvert is failing. It is undersized and erosion is threatening the road crossing. During heavy rain events, stormwater will flow onto 124th Avenue. This project will replace approximately 85 lineal feet of 30"stormline with an approximate 60"wide box culvert. P On Target " Century West—6/30/18 On Target Q On Target Total Project Budget: $230,000 Status: Design Total Project $8,081 External $200,000 $2,492 Internal —$30,000 FY 2017/18 $8,081 External $65,000 $2,492 Internal 1 $22,000 Total Project%Spent: 5% Project Manager's Total Project Estimated%Complete: 5% 1) 30%design—Dec.2017 5) Bid and award—May 2018 2) 60%design—Ian,2018 6) Begin construction—June 2018 Project Schedule 3) Final design—Feb.2018 7) End construction—August 2018 4) Permitting—Apr.2018 • Wetland studies completed • Surveying completed • 30%design • Wetland delineation submittal to DSL Pro ject Name. 1.Stormwater Rate Study and Audit/Funding Strategy Lori Faha a Project 94039 1/16/18 The stormwater master planning effort is identifying significant project and program needs that have not been quantified, prioritized or addressed for many years(the city's last Stormwater Master Plan is over 30 years old). This project will provide an Description analysis of options and impacts to current stormwater rates and charges if the cit implements the projects being identified and Y P P g Y- P P 1 g� prioritized in the Stormwater Master Plan. MIS On Target On Target �) On Target Total Project Budget: $100,000 On-Hold, . adoption Total Project External $85,00 $186 0 Internal -$15,000 Total Project%Spent: % _ Project N ma e. Total Project Estimated%Complete: % 1) 2) Snapshot of Workand Schedule • Progress Upcoming Work Items • Pavement Management Program(PMP) IMMike McCarthy 95001 1/16/18 On Target _ * Murray5mith-12/31/18 ^� On Target * 5-2-Summer 2017—Closed •• a On Target Total Project Budget: $2,350,000 D. u. $1,659,812 External $2,275,000 $51,378 Internal M $75,000 Total Project%Spent: 73% Project Manager's Total Project Estimated%Complete: 80% Project5chedule1) Design in progress for crack seal/ramp work in June and paving/slurry seal starting in July 2018 • • Paving,and surface seal work completed in summer 2017 • • Design for 2018 paving season in progress. Work is planned to include 2 miles of paving and 20 miles of crack seal/slurry seal • • Bid and award paving and slurry seal projects in spring 2018 • Crack seal,slurry seal,curb ramps,and paving in summer 2018 STREETS Project Name: Pedestrian and Cyclist Connections Piogiam M. Mike McCarthy Project Number: 95027 6 51/16/18 �• , r Projects may include sidewalk/bike lane/pathway construction,crosswalk treatments and minor intersection modifications. Projects will typically cost less than$50,000.Funds from this program can also be used to cover matching funds for eligible grant projects benefitting pedestrians and cyclists. On Target * OBEC—Closed On Target * S2—Closed •• On Target Total Project Budget: $300,000 Ongoing FY 2017/18 • $49,190 External $260,000 $21,624 Internal —$40,000 Total Project%Spent: 24% Project Managers Total Project Estimated%Complete: 30% • Multiple projects each fiscal year • Constructed new pathway from 100th Ave to Highland Dr • Installed new crosswalk and RRFB flashing lights on Bonita Road at 791h Ave/Fanno Creek Dr • Constructed curb ramp on 72nd at Fir Street • • Constructed new sidewalk along part of 115th Ave • Installed new lights at 121st/Katherine and 121st/Springwood crosswalks • Installed markings and lights/signs for new crosswalk on Walnut Street at 116th Ave • Built walkway along North Dakota St east of 114th Ave • Completed survey and preliminary design for sidewalk along Grant Ave from the Fanno Creek Trail to Tigard St • Yard signs now available(and in yards around the city)encouraging'Look Out for Each Other and'20 is Plenty' • Issue consultants on-call task orders for design of specific projects • Detailed design of sidewalk along Grant Ave from Fanno Creek Trail to Tigard St • Build pathway connecting 92nd Ave to North Dakota St • Improvements for cyclists at 72nd Ave railroad crossing 0 Select projects for FY 2018-19 Project Name- _rUpper Boones Ferry/Durham Adaptive Signals Mike Mr,Carthy _ a Project Number. 95041 1/16/18 This project will install traffic signal coordination from Durham Road to Pacific Highway including 13 traffic signals and two rail F� crossin s.Traffic users consist of residential,school,city ty park,office and retail. Budget Q Minor Issue * Washington County Schedule Q Minor Issue Scope Minor Issue Total Project Budget: $1,000,000 Status: DpsLgn City of Tigard Budget: tiMhO99$185,000 Total Project $124,357 External $143,000 $20,993 Internal $42,000 Project Budget FY 2017/18 $720 External $10,000 $1,579 Internal $20,000 Total Project%Spent: 79% Project Manager's Total Project Estimated%Complete: 40% *This project is primarily federally funded-$1M.Percent spent reflects that the city's match has been paid 1) Preliminary design began—Feb 2016 3) System implementation complete—Winter 2019 2) Detailed design begins—Fall 2017 • Schedule-project delayed due to slow ODOT procurement process and new ODOT ADA requirements Snapshot of Work • Per the IGA,the city provided the county a 10.27%match in one lump sum payment due upon the execution of the and Schedule agreement. The county is responsible for administering the remainder of the grant funds Progress • Installed new signal controllers,timing plans,and coordination throughout corridor • ADA ped button/landing inventory complete • Guidance/interpretation received on ADA requirements for project • Design scoping and contract amendment based on new understanding of ADA requirements • Detailed design of system and communications along corridor and crosswalk changes at High School • Implementation of technology new to Tigard • New ODOT ADA interpretations will add some scope and cost to project • City will consider constructing some ADA elements in advance using ped/bike program funds • Budget increase in FY18 budget due to additional city engineering staff time needed to support for lengthened duration of project q Commercial Street Sidewalk(Main to Lincoln) Andy Newbury 95042 1/16/18 This project will construct a sidewalk along one side of Commercial Street from Main Street under the Pacific Highway overcrossing to Lincoln Avenue;a pedestrian path connecting Commercial Street to Center Street and sidewalk along east side of Pacific Highway from Naeve Street to Beef Bend Road will be constructed.This is part of a larger TriMet-managed project to improve access to transit along the Pacific Highway corridor. This portion of the project will be managed by ODOT. WOOn Target * TriMet On Target On Target Total Project Budget: $1,976,990 $1,305,000 Status: Design Cityof Tigard: $619,999$205,000 Total Project $134,182 External $166,000 $13,732 Internal $39,000 FY 2017/18 $114,024 External $145,000 $3,647 Internal —$15,000 Total Project%Spent: 15% Project Manager's Total Project Estimated%Complete: 15% *This project will be partially funded with the STIP Enhance Project to be completed cooperatively with TriMet 1) Hire consultants—Oct 2016 5) Permitting—Sept 2018 2) Preliminary design—Jan 2017 6) Bid and award—October 2018 3) Draft acceptance plans—April 2017 7) Begin construction—April 2019 Project Schedule 4) Final design—July 2018 8) End Construction—September 2019 Preliminary-waiting for schedule from ODOT • Respond to utility conflict letter • Meeting to review advance plans submittal • ODOT is managing design and construction contracts for the sidewalk portion of the project • Project scope could be revised due to cost issues • Total project budget reduced in FY18 budget because scope was reduced-stormwater quality facility was pulled out to become a separately budgeted and scheduled city project Hunziker Industrial Core _ Andy Newbury FEW 95047Description 1/16/18 New public infrastructure improvements to SW Wall Street,providing a connection from SW Hunziker Road to Tech Center Drive. The project supports development and redevelopment of adjacent industrial lands to achieve higher levels of employment. On Target * MSA-„ice,G!]�6/30118 On Target * Wallis-11/30/20 0 On Target Total Project Budget: $6,876,969 $4,713,000 Status� Construction Total Project $634,757 External $4,530,000 $146,783 Internal =$183,000 BudgetProject FY 2017/18 External $325,877 - $3,364,000 $44,744 Y Y Internal 1$60,000 Total Project%Spent: 17% Project Manager's Total Project Estimated%Complete: 15% lMr4) RFP for Design and Construction Mgmt.-Nov 2015. 5) RFP construction services-Nov 2017 Survey,geotechnical,traffic report-Feb 2016 6) Bid and award-February 2017 Design complete-Sept 2017 7) Begin construction-March 2018 Permits-Sept 2017 8) End construction-September 2018 • Issued invitation to bid • Completed site certification from for EDA • Received and review bids • Completed bidder checklist for EDA • Completed license agreement with Trimet • Property Management Agreement approved by the EDA Upcoming Work • Council meeting to approve contract Items • Issue notice to proceed • Pre-construction meeting • Total project budget reduced because second phase of the project(Tech Center Drive Connections)has been divided out as a separate project(to start in FY19) • Project bids came in approximately$600,000 below estimate i i Commercial Street Sidewalk CDBG - Andy Newbury B 95049 1/16/18 Construct sidewalk along the north side of Commercial Street from 95th Avenue to Lincoln Street.This would connect with existing r- sidewalk along the north side of Commercial west of 95th,and would connect with a cooperative project(with the state and TriMet)to add sidewalk from Lincoln Street under the Pacific Highway bridge,and connecting to Main Street.The city has been awarded a Community Development Block Grant. Budget O Minor Issue CES NW— „76/30/18 Schedule 0 Minor Issue Scope On Target or Total Project Budget: $202,090$253,000 Total Project $40,658 External t"v $19,092 $231,000 Q1 Internal — $25,990 $23,000 QI Project Budget FY 2017/18 $3,005 r9 External ' $6;786 $192,000 Q1 Internal M $10,000 Total Project%Spent: 24% Project Manager's Total Project Estimated%Complete: 30% 1) Hire design consultants—Dec 2016 4) Award construction contract*—April 2017 2) Complete design—Feb 2017 5) Begin construction*—May 2017 3) Send out for bid*—April 2017 6) End construction*—Feb 2017 *Project rebid and construction schedule extended • Issued notice to proceed to contractor • Pre-construction meeting a� s • Begin construction the week of February 12 • Contractors are very busy which are impacting construction costs. Low bid on second advertisement was still over engineer's estimate.Low bid was$178,172 and engineers estimate was$125,000. City requested additional funds from the CDBG and city council and have received approval • Construction completion has now been extended to April 30,2018 to allow time to obtain additional funding from the CDBG OIL 49 Project Name: North Dakota Street(Fanno Creek)Bridge Replacement Mike McCarthy Project Number: 95056 1/16/18 '! This project will replace the existing bridge with a new bridge wide enough to accommodate pedestrians and cyclists along with vehicles.Environmental regulations would require a new bridge to be significantly higher and longer than the current bridge.The ' project may also reduce flooding over the roadway.The city has been selected by ODOT for STIP grant funding to cover most of the project cost.The grant application outlines several project scope and cost options and includes a city match of up to$800,000. ® On Target QMinor Issue ® On Target It Total Project Budget: $3,769,000 $3,729,000 Pre-Design City of Tigard Budget: X76,999 $800,000 Total Project External $600,000 X1,579 Internal $200,000 Project Budget FY 2017/18 External $40,000 $347 Internal $35,000 Total Project%Spent: 0% Project Managers Total Project Estimated%Complete: 1% • The City has been notified this project will receive Federal Bridge Replacement Funds • Project scoping with ODOT has begun • ODOT finalizing funding allocation and timeline • Project scoping • Target construction timeframe 2020 • Federal funding and requirements • ODOT procurement and review processes and coordination • Slight budget adjustments made in FY18 budget to match expected budget and grant award STREETS Railroad Crossing Closure Kim McMillan e 95059 1/16/18 An Ash Avenue at-grade crossing of railroad tracks downtown has been a recommendation in the Tigard Downtown Improvement Plan,in City Council goals,and could enhance access to SW Corridor light rail that may travel through downtown Tigard. To achieve an additional at-grade rail crossing,the city would need agreement from ODOT Rail and Portland&Western Railroad,and would likely be required to abandon an existing crossing elsewhere. This project presumes,based on the prior conversations with permitting agencies,the city must give up one at-grade rail crossing in order to receive approval for a new at-grade crossing downtown at Ash Avenue. This project would produce planning and design documents required by ODOT Rail and Portland& Western Railroad for closure of an existing city at-grade street crossing at North Dakota Street. The design would include re- routing of existing streets to maintain street connectivity for autos,bicycles and pedestrians. The planning and design work will include analysis of several alternative street re-routing options to determine the most feasible option with the least disruptive impacts. The exact scope of the work,including the required level of design,will be determined during negotiations with the railroad agencies,Tri-met and Metro during the initial phase of this project. N- NI ® On Target * OBEC—1/31/19 _ On Target * DKS-9/30/17 .• On Target Total Project Budget: $510,000 Status: Planning Total Project $5� External $425,000 $1.604 P,,ojec,Budget Internal $85,000 FY2017/18 59,978 External — - $425,000 1604 Internal $75,000 Total Project%Spent: 12% Project Manager's Total Project Estimated%Complete: % 1) The consultant team has analyzed three alternatives that will allow the closure of the North Dakota rail crossing 2) They have completed their work pending further direction from city staff ScheduleProject 3) Additional traffic analysis was completed mid-November 2017 4) A memo for council packet will be prepared by Engineering and Community Development for an upcoming council meeting in the first quarter of 2018. The memo will discuss how this work relates to the Ash Avenue Crossing • A draft report comparing the three alternatives was received. Considerations include impacts to the neighborhood and environment,costs to construct and property acquisitions ■ • The consultant,OBEC,reviewed the report with staff and additional analysis has been requested • DKS has completed a Roundabout Analysis _ • Additional traffic analysis involving roundabout configurations for bringing North Dakota Street into the Tigard/Tiedeman intersection • OBEC will use information from the traffic analysis to refine their report. Was complete January 2018 • Staff update for council at an upcoming meeting in early 2018. STREETS Tigard Street(Fanno Creek)Bridge Replacement Mike McCarthy = NEW M 95060 1/16/18 The structure has deteriorated and needs to be replaced. There is a lack of bike lanes on the bridge and a lack of sidewalk along the north side. This project will replace the existing Tigard Street Bridge over Fanno Creek with a new structurally sound bridge Description wide enough to accommodate pedestrians and cyclists(on both sides)along with motor vehicles. Environmental regulations would require a new bridge to be significantly higher and longer than the current bridge,which may necessitate some rework of the existing Fanno Creek Trail just west of the bridge. This project will construct a new sidewalk along the north side of Tigard Street from the bridge to Tiedeman Avenue. On Target On Target •• ® On Target Total Project Budget: $4,552,000 Status: On Hold City of Tigard Budget: $1,152,000 Total Project External $1,020,000 $3,523 Internal - $132,000 Project Budget FY 2017/18 External $3,523 Internal $10,000 Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 1% Project Schedule • Depends on funding and potential grant timelines Snapshot of Work • Application for Federal funds through Mors Local Bridge Program was submitted October 12,2017 and Schedule Progress • Awaiting funding decision in late 2018 • Federal funding and associated federal and ODOT requirements WATER Cach Reservoir and Pump Station Rob Murchison 96040 WN1/16/18 The project is for the design of a new water reservoir,associated new water lines,and replacement of a temporary pump station for the city's 550-foot service area. The reservoir will be constructed on city property located on the west side of Bull Mountain in the Sun Rise Lane vicinity. A new permanent pump station will replace an existing temporary pump station on the Menlor Reservoir site to move water from the 410-foot to the 550-foot service areas. •: On Target 0 1 Minor Issue •P 0 1 Minor Issue Total Project Budget: $13,399,999 $23,000,000 . . Total Project External $22,000,000 518,037 Internal $1,000,000 FY 2017/18 External $8,500,000 5 2,293 Internal W$400,000 Total Project%Spent: 0% Project Manager's Total Project Estimated%Complete: 1% *Project schedule under development • Based on current cost estimate,project is being reviewed for potential schedule and/or cost adjustment • This work is being coordinated with the Water System Master Plan project • As early action item in Water Master Plan,evaluate whether project can be divided into phases to spread-out expenditures and staff resource needs • Prepare project charter and schedule • Funding may be an issue given large increase in project cost estimate • Internal staff resource loading is an issue given the size of the project • Current construction cost escalations will require a value engineering effort to better plan and mitigate construction cost increases • Project cost estimate has been updated,resulting in approximately 50%increase in expected costs • Original estimate did not reflect the most accurate cost data or ascending cost environment. It also did not include contingency Red Rock Creek Waterline Relocation R.Murchison Project Number: I96046 1/16/18 Decommissioning of over a half mile of existing 12"waterline currently located in Red Rock Creek. Installation of fire lines to properties currently being served on the northwest and southwest side of creek. Minor Issue * Westlake—1/31/19 MinorIssue * MSA-16/30/18 Minor Issue Total Project Budget: $467,GW $477,000 Design Total Project $32,293 External $430,000 $57,661 Internal — $47,000 FY 2017/18 $1,303 External $353,000 $38,097 Internal — $25,000 Total Project%Spent: 19% Project Manager's Total Project Estimated%Complete: 20% 1) Design—Spring 2018 4) Project completion—Summer 2019 2) Permitting—Summer 2018 3) Construction—Fall 2018 • Phase I-Wall Street/Red Rock Creek o Preliminary topography complete 0 Preliminary layout complete 0 Re-budgeting of the project underway 0 90%Wall Street drawings submitted and City comments provided • Phase II-Milton Ct to Tech Center Drive(internal budget increased expenditures are due to adding this work phase) o Surveyor complete 0 Permitting in Progress-METRO has verbally agreed to a waterline easement 0 Preliminary layout in progress • Complete design and permitting phase of the Tech Center Drive to Milton Ct phase • Existing water line in creek is inaccessible for maintenance and at risk of breakage without the project • Adding scope to complete needed water system pipe loop connections at Milton to Tech Center is anticipated to increase total project budget—this request will be made in the FY19 budget process • Added the Milton Ct to Tech Center Drive phase in order to take advantage of the proposed Fanno Creek Trail project. This will allow the dead end crossing of a waterline located in Tech Center drive to be connected to the dead end waterline located in Milton Court • Design and construction schedule extended to occur after the Wall Street roadway improvements are complete.The proposed Wall Street roadway will include a waterline to replace the existing waterline located in Red Rock Creek Canterbury Pump Station Rob Murchison 96047 2/14/18 This project will rehabilitate the existing pumps and electrical components.This will extend the life of the existing pump station until the Bull Mountain Road Water Pipeline is constructed. ® On Target 9 Minor Issue On Target r4atus:Planning Total Project Budget: $80,008$250,000 Total Project External i $215,000 Q1 $15,327 Internal $34,500 Q1 Project Budget FY 2017/18 External $215,000 Q1 $5,836 Internal � $25,000 Total Project%Spent: 6% Project Manager's Total Project Estimated%Complete: 1% Project Schedule *To be developed by consultant • Currently Negotiating scope and schedule with Murraysmith • Coordinating hydraulic modeling with water master plan project •N . � • Finalize PO in February • Kickoff meeting in early March • Project is proposed in two phases-first preliminary design and final design-second construction. Project phasing needs to better define best solution to aging pump station problems. This may cause further schedule extension Water Master Plan a ' • - /SB65t�� - Rob Murchison 9604$ 1/16/1$ The city conducts water master planning every five to ten years. The current Water Master Plan was adopted in May 2010,with a minor addendum in 2014 to include River Terrace development. The Water System Master Plan is a comprehensive study of the city's water source,storage and delivery systems and will be used to guide future water utility decisions. The master plan has a 30- year planning horizon and is predicated on the city's anticipated population growth during that time. Budget 0 Minor Issue Schedule 1 On Target Scope L9 On Target Total Project Budget:$369,906$397,000 Status: Plannin Total Project S- External $28,495 $331,000* Internal - $355,690$66,000* Project Budget FY 2017/18 External $125,999$241,000- $28,495 125,998$241,000*$28,495 Internal $`5,009$56,000* Total Project%Spent: 7% Project Manager's Total Project Estimated%Complete:10% Project Schedule • Kickoff meeting was held,Murraysmith is working on various task and early action items(potential 410 service zone reservoir location)are in process • Murraysmith has sent a formal data request. City staff is currently reviewing and gathering requested data. Project is on schedule with ultimate goal of delivering a draft of the Water Master Plan in the spring 2019 Upcoming Work • Current work items include data gathering,hydraulic modeling and workshop planning Items • The proposed professional services fee was more than budgeted. Public Works and Finance Department recommended using the Tigard High School Well Abandonment project savings to supplement the Water Master Plan project budget deficiency. Council approved the contract with Muraysmith at the 11/07/2017 meeting Item# Public Works Update 2/22/18 Newsle�r:Z ZZ ' S3 Here is a summary of the work happening in Public Works. Some Heroes Wear Capes, Others Orange Thank you to the Public W'orks field staff who worked long hours this week to clear Tigard roads of ice and snow. Crews worked on both plowing and de-icing this week. Streets supervisor Vance Walker reported using about 2,000 gallons of Magnesium Chloride. City crews will continue to monitor the weather and respond as needed through the weekend. Pictured(L-R): Alike Hendrix, Glenn Davis, Kyle Arnbart, Kristopber Gates, Kenny Clark, Herb Burris, Chris Plummer ,t .. Y i fl 9L Hunziker Road Construction Last Friday Braun Construction paved a permanent asphalt patch over the sev=er improvements in Hunziker Road just west of Wall Street on Friday, February 16. The roadway was restricted to one lane of \ traffic with flaggers directing vehicles. I}4 This work is part of the East Tigard Sewer Replacement project. This project will increase the capacity of an existing sanitary sewer line to prevent overflows and improve access for routine maintenance. It will also provide sanitary sewer service for a portion of the undeveloped adjacent parcel. Public Works Staff Celebrate Completion of Projects in Cook Park Joe Coulter and David Howes (pictured below) led a tour for citywide staff to view recent projects in Cook Park. Both projects are recent examples of ways innovative efforts by our team have led to reduced expenses for the city. The project led by Mr. Coulter helps to reduce erosion and protects a bridge over Kruger Creek in Cook Park. Mr. Howes described the Green Team project just across the trail to capture sediment and prevent future erosion along the creek. r; +�5 rY r t �' Com_!t/�_ '. •�' Celebrating the Life of Paul Izatt On Thursday, February 15,Tigard Public Works Ift of-.- employees gathered with family and friends to celebrate the life of our co-worker and friend Paul Mariner Izatt (1961-2018). Paul worked for the City of Tigard in various �- positions starting in 1990,including the Sewer ` Dept.,Engineering Dept. and ending with the position of GIS Technician. His life and many contributions to the city will be honored with a plaque outside of Tigard Public Works. View his obituary online: hIM://obits.oregonlive.cotn/obituaries/oregon/obituary.aspx?page=lifesto Q:ftid=188097781 Item# - Page Es 0 :.t= at ±r r i! ohI-_:;:+:s�sing—__'s Newslett r.�� r�0 ~^ O A iN. Fci�a nng - S-late *rc ti gay us. a s zte L, .a:�a„�:ull W _ 0 Tharks to-Irgard's Public';FYoocs Team who came!r;a 2 ate. and worked on de-icing our roads through the;normllig! S c City of 71gard. Oregon Cityoffikp d - - Pasts f'nfitoS Ab ilt V.-deOS City of Tigard, OregonD -Send Message Sarvices Shop !: � '�_£t':9w�:se reaches :... .- l�iater ( Like L �i"r;39?"t ai, h so Irf Qj • ryarC• rfs rs Jobs .. orrmjnt,1 T,ria.Huynit Oh city c?SeYBr is a%*scrne Thar..im to you;can go to wo:k this i71vT9flf�' Knsten Tabor Thinks .0•sI APKia Kearns Thank you so much!" r� the best— Karen ftancork Tank ycui pub!.,.voi+:s staff! Aaron B9ey T n.ar.� yaL;� Lauie Armstrong Good r'ioft:gLIS Vx cj Reeves Nootman.^ank'i:3u !.,t;e Fart; Taking care of Tigard Communications Manager Sharon Gavin Betty W. _ Thank you PW crew.You are appreciated! Thank r L Stephanie S. Thank You so much for all your hard work-we Thanks to Ti ard's PW Team who came in a 2 appreciate all you do! *❑❑ g Thank a.m. and worked on de-icing our roads through the morning! t_ Nancy D. Vera, Melodie, Chris, and 73 others thanked you Thank you for all your efforts! PW is Pretty Wild, working all hours! :) Thank Kristen G. - - Gail N. .. Well done! Thank Great Job!! Much appreciated. Stephanie thanked Kristen Thank ,. Marta H. Julia S. They did my street at 3:101 Great job extremely Thank you! appreciated! Thank Thank :e thanked MI,. Rae Lee M. } Thank you! Thank Christina T. 11-0111 H1.111 %1OH111.1in I�dNi Awesome job! Thank or thanked Christina Cheryl Y. Thank you !! Thank, Mary A. Thanks guys,you did a great job. I had no trouble getting to work at 6:30 this morning. Thank Stephanie Lharmed Mary Sharon R. Thanks guys! .0191% 7-4% ._4x Thank Joewayne C. Julia V. i,,,: Thank you!!! Thank Great job! Thank you for the easy early am commute! Thank Vera M. Thank you! Thank Stephanie S. You all are incredible! Thank you!!! ' *" Thank Slep Juliette W. . . Great job!! Thank Sarah S. Thank you! Chris B. Amazing that such a small team can prevent so many accidents! Kudos to you all. Thank Item# Newsletter-2,4Z Tigard promotes Safe Routes to School through art literacy The Times Thursday, February 22, 2018 Winning student in 2018 poster contest announced Tuesday by Tigard Mayor John Cook. r SBfe,Row,e5 Nr d J TI Mia's poster The Tigard-Tualatin School District's Art Literacy Program and the City of Tigard's Safe Routes to School program have teamed up for the second annual Safe Routes to School art literacy poster contest. am Mia Enciso a first-grader from Metzger Elementary School, with Tigard Mayor John Cook. This year's winner is Mia Enciso, a first-grader from Metzger Elementary School. The news was announced Tuesday at her school. rkr Tigard Mayor John Cook presented the grand prize winner with a new backpack. r'ti4pler The winning art will be used on the city's promotional poster for Walk and Bike to School Day on May 9. Two additional winners from each grade will be chosen to have their artwork on display in March at several Tigard r_.... •► locations, including the school district's Hibbard Administration Building, Tigard Public Library and Symposium Coffee. This year's contest took place at Metzger Elementary School in tandem with lessons about French painter Henri de Toulouse-Lautrec. Volunteer educators taught students about the painter and his most famous works, including "At the Moulin Rouge." Students were encouraged to reflect the painter's style and incorporate it into a poster about safely walking and biking to school. Winners were chosen by volunteer educators and Tigard's Safe Routes to School coordinator. The district's Art Literacy Program provides elementary school students the opportunity to learn about art and create their own in art in the classroom. The program has been supported through donations from Parents Support Organizations and other organizations since 1982. Walk to School Day events raise awareness of the need to create safer routes for walking and bicycling and emphasize the importance of issues such as increasing physical activity among children, pedestrian safety, traffic congestion and concern for the environment. The events build connections among families, schools and the broader community. The Times • Thursday,February 22,2018 P01 " e p ic ull out all stops ■ ■ in search for white van ■ Police run down lar incident in another part of second incident occurring in trict's school bus company,no- the city that occurred Jan. 11 the vicinity of Southwest 93rd tifying them to be on the look- tips on 41 vans and and a third episode as well. Avenue and Inez Street,just out for such a van. They also McAlpine told the council blocks away from Templeton put out alerts statewide. Check 191 registered that her department put a pri- Elementary School.Police are Frisendahl said pulling out ority on deploying numerous not disclosing the location of all the stops was important be- sex offenders fenders personnel and resources into the final incident in order to en- cause the youth of the commu- the search to catch the individ- sure the integrity of the investi- nity are extremely important to By RAY PITZ ual involved. gation if someone i5caught and the Tigard Police Department. The Times "(What)I want to assure,not questioned. Since there has been nothing only you but the audience, is Tigard Police Lt.David Fris- new during the initial inti- The owner of a white van, that we put a lot of effort into endahl,who oversaw the inves- dents, officials speculate that who allegedly tried to lure that and it doesn't show in the tigation, said the department the intense investigative ef- Tigard children into the ve- crime statistics,but there are saturated the areas where the forts may have driven the indi- hicle in three separate Iota- 191 registered sex offenders in van was reported, using offi- vidual to stop or suspend his tions throughout the city has the city of Tigard,"McAlpine cers,detectives and school re efforts. yet to be found.But it's not said. "We checked every ad- source officers to help with the The suspect in the initial in- for a lack of trying,with po- dress looking for a vehicle that search, going as far as using cident was described as a white lice putting in extensive per- might be similar.We deployed plain clothes officers to make male around age 30 who had a sonnel hours and resources 85 different personnel in a two- sure students remained safe. short,salt-and-pepper-colored into the effort. week span at all the elementa- "We had targeted opera- beard.The van had Oregon li- on Feb. 13, Tigard Police ry schools looking for anything tions for over eight days,"he cense plates containing the Chief Kathy McAlpine updated suspicious so we took it quite said, noting that at least 75 tree emblem and it had a dent the Tigard Citv Council on at- seriously." hours were devoted cumula- in the rear. Also, the student tempts to find the white,work- As a result, police checked tively to the investigation."We who saw it reported that the type van whose occupant alleg- out tips on 41 white vans,McAl- tried to cover all our bases." windows of the van were tinted edly tried to get an elementary pine said. In addition to coordinating and that there was a tarp cov- school-aged student to get in- The initial Jan.3 incident oc- with the Tigard-Tualatin ering the rear windows. tide on Jan. 3. That episode curred near Mary Woodward School District,police also con- The child was not injured vas followed by another simi- Elementary School, with the tatted First Student, the dis- and he ran to a safe location.