Permit (131) N
Fes. .
CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2017-00320
Tf ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/02/2018
Parcel: 1S136DB00200
Jurisdiction: Tigard
Site address: 11595 SW PACIFIC HWY
Project: Rack Attack Subdivision: None Lot: None
Project Description: TI for new tenant:Modifying storefront for a new vehicle bay overhead sectional door. Scope of work also includes
ADA upgrades,awning replacement,and parking modifications.
Contractor: JHC COMMERCIAL LLC Owner: KBF II LLC
11125 SW BARBUR BLVD BLD C JGF II LLC
PORTLAND, OR 97219 602 THIRD ST, SUITE 94107
SAN FRANCISCO, CA 94107
PHONE: 503-624-7100 PHONE:
FAX: 503-684-5295
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 12/28/2017 $509.05
Demolition
Occupancy Grp: Occupancy Load: 50
12%State Surcharge-Building 12/28/2017 $61.09
Dwelling Units: 0 Plan Review 12/28/2017 $330.88
Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 12/28/2017 $91.00
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 12/28/2017 $10.00
Value: $30,000 11x17)
Plan Review-Fire Life Safety 12/28/2017 $203.62
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,205.64
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans, This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OA
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.:01 - ;!
Issued By: III.. _,..0:44.10,e6.y, (�; Permi$eeSignature:
03.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
,
Building Permit Application
• Commercial
City of Tigard Received y J + 0. Perm No.: /�yy ) j A
b b 'l I ! i Dates : II- 1 3 f 7 � i���l7_6:63,4o...
�U)3
Ill13125 SW Hall Blvd.,Tigard.OR 97 '„ 1 A°dr"" t a t . Plan Re‘tew
g Phone: 503.718.2439 Fax: 503 598.3 .t .0.'' Date/By: ii—?-P')7 other Permit:
T 1 GA RD Inspection Line: 503.639.4175 t tm 1,` Date Ready/By: / Jun.. ® See Page 2 for
Internet: www.tiga[d-or.gov �r-' 1, a ll. N tedMethod: l, I Supplemental Information
TYPE OF W s '.,.,t k � tn
s .�*: A:° REQUIRED DAT1-AND 2-FAMILY DWELLING
0 New construction titan ittoii.�4 Permit fees*arc based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
0 I-and 2-family dwelling ®Commercial/industrialValuation: $
❑Accessory building 0 Multi-family Number of bedrooms:
1:1Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 11595 SW Pacific Ilwy New dwelling area: square feet
City/State/ZIP:Tigard,OK 97223 Garage/carport area: square feet
Suite/bldg./apt.no.: Project name:Rack Attack Covered porch area: square feet
Cross street/directions to job site:SW 72ud ave—Fred Meyer shopping center Deck area: square feet
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: Lot no.:200 Permit fees*are based on the value of the work performed.
Tax map/parcel no.:1S136DB Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
An exterior remodel to an existing 5,020 sf building on Pacific Hwy to replace Valuation: $S30,000.00
one of the storefront systems with an over-head door,replacement of the awnings Existing building area: 5,020 square feet
and new exterior paint.The parking layout will be adjusted for ada and the door New building area: 5,020 square feet
0 PROPERTY OWNER ® TENANT Number of stories: I
Name:Rack Attack Type of construction: V-B
Address:1737 SW Morriston St. Occupancy groups: �~
City/State/ZIP:Portland,OR 97205 Existing: M
Phone:(503)226-7300 Fax:( )
New: M
® APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
t'Please refer islet.schedule)
Business name:CIDA,Inc.
Structural plan review fee(or deposit): $491.05
Contact name:Dustin Johnson
FLS plan review fee(if applicable): 196.42
Address: 15895 SW 72"d Ave,Suite 200
Total fees due upon application: S687.47
City/State/ZIP:Portland,OR 97224 _
Phone:(503)226-1285 Fax::( )
Amount received:
E-mail:dustinj@cidainc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted Photo Voltaic Solar Panel System.
Business name:Joseph Hughes Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 11125 SW Barbur Blvd Solar Installation Specialty Code checklist.
City/State/ZIP:Portland,OR 97219 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)624-7100 Fax:( )
State surcharge(12%of permit fee): 521.60
CCB lie.:158061 M Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: �e pre me em j-�- 12, O/1/ Date: a2c.3 kzo * Fee methodology set by Tri-County Building Industry
Service Board.
l:113uilding\Permits\BUP-COM PermitApp.doc 02/24+2011 440.4613T(11/02/COMIWEB)
•
1 Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 30,000
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 7,500
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $ 2,200
(b) An accessible entrance: $ 5,300
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $ 7,500
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
4
1111 City of Tigard
■ r COMMUNITY DEVELOPMENT DEPARTMENT
T 1 a u o Building Permit Review — Commercial - With Land Use
Building Permit #: IVUve 017-00
Site Address: 'Mc! S sw Pati :, k Suite/Bldg#:
Project Name: LIL 4 k
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review i f�
Proposal: �chn� rcp•�, 1 a,. t,t,j1-,,�i 07) St- bAJ;ij a� P,�c;�. 1--,,,,7, jn tp� to cert o
$ yy � N
fit S S7-Sk vi�� m 6i 11ryJ ��"r3 !teL?d r-A4 Jc- aw,frsso an.A r4L./ t )'L, �40,41• 7k frig,
4Terify site address/suite#exists and active in permit syste, . t47o.if LA t 41)4,,A iv- 404- 4,.v1 _)i't kJ'.
IV/R'ver Terrace Neighborhood: ,(] Yes No
(_, nd Use Case#: M1 b Lc1�-Is_ al , A'DJ 2417- a o o 11
1I Plan atch Approved Land Use:
21 Site Plan ❑ Landscape Plan El
POther:
❑ Urban Forestry Plan ❑ Elevation Plan
$uilding Height: �Maaximum Height fji C L
tt Actual Height ' Ghyc
Conditions Met: LV Prior to Submittal ❑ Prior to Permit Issuance
Ei/Business Licen :
Exists: la Yes ❑ No,applicant notified to obtain business license
Public Facilities Improvement (PFI) Permit: /
Required: CI Yes,applicant was notified m'No Applied For: ❑ Yes 121" No,stop intake
Notes:
Approved by Planning: Date: 1i,-11)-1 q-
Revisions (after Building Submittal only) Reviewer Date
Revision 1: El Approved El Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: El Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: ll 3,/,7
Site Plans: /
Building Plans: #
Building Permit#: titer building permit#above.
Workflow Routing: [1nning gineering Coordinator g
Workflow Sign-off: Ign off for Planning(include notes from planning review)
Route Application Documents: [ding: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable, etc.
Notes:
By Permit Technician:
. Date: L)_/ ti/ 7
I:\Building\Forms\BldgpermitRvw COM_WithLandUse 060116.docx
Engineering Review
Slope at building pad:
PFI Permit#:
Conditions "Met"prior to issuance of building permit
Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP)
Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes No
Assess Water Quantity Fee in-lieu: ❑ Yes No
LIDA Facility on lot: ❑ Yes No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: A , Date: a-7?—f7.
Revisions (after Building Submittal only) Reviewer Date
Revision 1: El Approved ❑ Not Approved
Revision 2: ❑ Approved El Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
El Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
C Fees Entered: Wash Co Trans Dev Tax: CIYes N/A
Tigard Trans SDC: El Yes N/A
Parks SDC: El Yes N/A
COK to Issue Permit
Approved by Permit Coordinator:
Date: /2/14/? --
I:\Building\Forms\BldgPermitRvw_COM_W ithLandUse_070915.docx
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Transmittal Letter
111 4
T I C A R D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www,tigard-or.go
.,/-
TO:
TO: Dan NelsonDA ?; C>� 4r'
DEPT: BUILDING DIVISION
l° 1 .,
y ; ,�` i i Ca
�J FROM: Kelly Douglass _, r./°�r *1 M .., itfi
,.., COMPANY: CIDA Inc. i
,4 PHONE: 503.226.1285 By:ei
RE: 11.595 SW Pacific Hw 1117 BUP2017-00320
ite • .. ess r (Permit Number)
4. Rack Attack lot #200
Project name or sue Damn name ane of n ri .'r
ATTACHED ARE THE FOLLO iI 1 ::
Copies: Description: Copies: Description:
Additional set(s) of plans. 3 Revisions: site plan /1 ,,,vgi.. •-e-a s,
Crvj
,,..,..\''\
Cross section(s) and details.'/ Wall bracing and/or la eral analysis.
lid Floor/roof framing. / Basement and retaining walls.
Beam calculations. / Engineer's calculations.
Other(explain):
//
REMARKS: Due to existin• teep grades along the east side of the pedestrian walkway
the ADA stall eeded to be relocated to create an accessible route.
FOR FF CE USE ONLY
Routed to Permit Te nician: ate: 1 ( ;, Initials r`'!
Fees Due: ❑ Yes ; o Fee Descrip ion: Amoun i e:
$
$
$
$
Special
Instructions:
Reprint Permit(per PE): ❑ Yes o
1 Applicant Notified: /4:67/..), Date: /�,,e/j,e' Initials: 4' 4
I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012