Permit (124) CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT
Permit#: BUP2017-00321
T 11;.1 R 1-) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/11/2018
Parcel: 2S 102AB02300
Site address: 12519 SW MAIN ST Jurisdiction: Tigard
Project: Tigard Cleaners
Subdivision:=LECTRIC ADDITION TO TIGARDVILLE Lot: 15
Project Description: New awning on front facade
Contractor: MCGEE BLINDS&AWNINGS INC
620 SE WATER AVE Owner: MAYBERRY, DARBIE A
PORLAND, OR 97214 DIGMAN, CAROL J
7603 SW LOCUST ST
TIGARD, OR 97223
PHONE: 503-235-4111 PHONE
FAX:
Specifics:
Type of Use: COM Description
Date Amount
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations,
Occupancy Grp: U Demolition 01/11/2018 $63.44
Occupancy Load:
Dwelling Units: 0 12%State Surcharge-Building 01/11/2018
Stories: 0 Plan Review $7.24
Height: 0 ft 01/11/2018 $4124
Bedrooms: 0 Info Process/Archiving-Sm$0.50(up to 01/11/2018
Bathrooms: 0 11x17) $7.50
Value: $749
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $119.79
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By:
14 Permittee Signature:
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
•
-
Building Permit Application
Commercial
'i FOR OHRI1SFO\I1
City Of Tigard Received
;. ' 13125 SW Hall Blvd.,Tigard,OR 97223 " .kEDate/By:
7 Permit No.: G�/�rc y t,i ��
a Phone: 503-718-2439 Fax: 503-598-19R60 Plan Redrew r (iy v4
T I C A R D Inspection Line: 503-639-4175 �t r 1 ry((11 Date/By: 1 RelatedPermitInternet: www.tigard-or.gov U E L 4 7_U Date Ready 1(01 J ® See Page 2 for
Notifies! ethod:
1 /45, �ySupplemental Information
TYPE OF WO
�+ a •J I,' '$ �. REQUIRE DATA:1-AND 2-FAMILY DWELLING
❑New construction ?} 1i._ Permit fees*are based on the value of the work performed.
L' Addition/alteration/replacementmi , Indicate the value(rounded to the nearest dollar)of all
0 Other: equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
CATEGORY OF CONSTRUCTION
o 1-and 2-family dwelling LI Commercial/industrial Valuation: $
❑Accessory building 0 Multi-family Number of bedrooms:
❑Master builder 0 Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: /o2.5 i9 •7 c w . , al....t,_.
New dwelling area: square feet
City/State/ZIP: i
`s' l* - Garage/carport area:
Suite/bldg./apt.#: Project name: square feet
., • 3/_ Covered porch area:
Cross street/directions to job site: square feet
Deck area: square feet
Other structure area: square feet
Subdivision: REQUIRED DATA:COMMERCIAL_USE'CHECKLIST
I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK
work indicated on thi
$
Valuation: "x•
7
— — –iii - / ��� Existing building area: square feet
rr,
� New building area: s uare feet
E rROPERTY OWNER o-, q
�
1 'TENANT Number of stories:
Name: D,, . ! • ,fin
Address: a ��it641 Type of construction:
i s i q5.w
City/State/ZIP: ' Occupancy groups:
• dce a Z_
Phone:(5a3 Ii Fax:( ) Existing:
'APPLICANT New:
❑ CONTACT PERSON BUILDING PERMIT FEES*
,
�!
_' +,__ .�.�r� j _ __ _"�� ' ,se re er to ee schedule
Business name:
Contact name: —
Structural plan review fee(or deposit):
Address: 4,2 d S E. w FLS plan review fee(if applicable):
City/State/ZI> / g, 9 702/y Total fees due upon application:
Phone:(5-0 - // Fax::(56 ) - ,„ it Amount received:
E-mail:
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
Business name: roof-top mounted Photo Voltaic Solar Panel System.
°S4.
LLD ail-aZtQ Submit two(2)sets of roof plan with connection details
Address: •
and fire department access,along with the 2010 Oregon
City/State/ZIP: Solar Installation Specialty Code checklist.
Permit fee(includes plan review
Phone:( ) l Fax:( ) and administrative fees): $180.00
CCB Lic.: /L �/( State surcharge(12%of permit fee): $21.60
l Total fee due upon application: $201.60
Authorized signatyre.
This permit application expires if a permit is not obtained
I Print name: within 180 days after it has been accepted as complete.
r'I/ )'cje/i,1j1^ k1 Date: .1 * Fee methodology set by Tri-County Building Industry
/ Service Board.
I:\Building\Penuits\BUP COM_PermitApp.doc Rev.04/21/2014
440-4613 T(11/02/C OM/W EB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
el Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, [1] $
excluding painting and wallpapering:
MULTIPLIER(25%barrier removal requirement):
x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking
(b) An accessible entrance:
(c) An accessible route to the altered area:
(d) At least one accessible restroom for each sex or a single unisex
restroom:
$
(e) Accessible telephones:
(f) Accessible drinking fountains:and,
(g) When possible,additional accessible elements such as storage and
alarms:
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
City of Tigard
1111 ■ a COMMUNITY DEVELOPMENT DEPARTMENT
T I G A R D Building Permit Review — Commercial - With Land Use
Building Permit #: 6 ,0,2�J i 7,ct- r),1
Site Address: /0 / -� p�
in � of Suite/Bldg#: •
Project Name: ch / 04rf
(Name of mercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: f7 a6
�2k--��'l/ om or 477--)---
-tur
Verify site address/suite# exists and active iinpermit syst9of.
ver Terrace Neighborhood: ❑ In n No
nd Use Case#: 2)2)p_��)- _ X60
rr Plan atch Approved Land Use: j
Site Plan 1`o I •,ndscape Plan ❑ Other:
I&rban Forestry Plan E Elevation Plan Q /
4uilding Height: Maximum Height Actual Height !�/D (?Y
ae
vt:Anditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance
I% Business Licen
Exists: Yes ❑ No,applicant notified to obtain business license
ublic Facilities Improvement (PFI) Permit:
Required: ❑ Yes,appli ant w s notified No Applied For: El Yes ❑ No,stop intake
Notes: 4�'✓e�ti a— CJ " ' lie et1d0::' 0/'t12, �i'!C
Approved by Planning: - - --_ —.. ,-`\, e� Date: l �/4/ -
Revisions (after Building Submittal only) Reviewer Date
Revision 1: E Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: /*l i/7
Site Plans: # 3
Building Plans: # 3
Building Permit#: zter building�permift above.
Workflow Routing: Ening III- gineering rmit Coordinator ding
Workflow Sign-off: S' -off for Planning(include notes from planning review)
Route Application Documents:
pp Building: original permit application,site plans,building plans, engineer and
beam calculations and trust details,if applicable, etc.
Notes:
By Permit Technician: . .,._ Date: 1)//si//7
I:\Building\Forms\B1dgPermitRvw COM_WithLandUse 060116.docx
Engineering Review
❑ Slope at building pad:
El PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes El No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No
LIDA Facility on lot: ❑ Yes ❑ No
❑ NOT Approved by Engineering: Date
Notes:
Approved by Engineering: �Sl Date: lz%��
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved El Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
‘brSDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A
Tigard Trans SDC: ❑ Yes N/A
Parks SDC: ❑ Yes N/A
OK to Issue Permit
Approved by Permit Coordinator: Date: / tQ1 1r..---
I:\Building\Fonns\B1dgPennitRvw_COM_WithLandUse 070915.docx
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
12519 SW MAIN ST, TIGARD, OR, 97223
Record Type: Record ID:
Commercial - Building BUP2017-00321
Inspection Type: Inspector:
295 Misc. inspection Jeff Grove
Result:
PASS
Comments:
Violation Summary:
Inspector Contractor