Loading...
Permit (124) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2017-00321 T 11;.1 R 1-) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/11/2018 Parcel: 2S 102AB02300 Site address: 12519 SW MAIN ST Jurisdiction: Tigard Project: Tigard Cleaners Subdivision:=LECTRIC ADDITION TO TIGARDVILLE Lot: 15 Project Description: New awning on front facade Contractor: MCGEE BLINDS&AWNINGS INC 620 SE WATER AVE Owner: MAYBERRY, DARBIE A PORLAND, OR 97214 DIGMAN, CAROL J 7603 SW LOCUST ST TIGARD, OR 97223 PHONE: 503-235-4111 PHONE FAX: Specifics: Type of Use: COM Description Date Amount Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, Occupancy Grp: U Demolition 01/11/2018 $63.44 Occupancy Load: Dwelling Units: 0 12%State Surcharge-Building 01/11/2018 Stories: 0 Plan Review $7.24 Height: 0 ft 01/11/2018 $4124 Bedrooms: 0 Info Process/Archiving-Sm$0.50(up to 01/11/2018 Bathrooms: 0 11x17) $7.50 Value: $749 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $119.79 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: 14 Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. • - Building Permit Application Commercial 'i FOR OHRI1SFO\I1 City Of Tigard Received ;. ' 13125 SW Hall Blvd.,Tigard,OR 97223 " .kEDate/By: 7 Permit No.: G�/�rc y t,i �� a Phone: 503-718-2439 Fax: 503-598-19R60 Plan Redrew r (iy v4 T I C A R D Inspection Line: 503-639-4175 �t r 1 ry((11 Date/By: 1 RelatedPermitInternet: www.tigard-or.gov U E L 4 7_U Date Ready 1(01 J ® See Page 2 for Notifies! ethod: 1 /45, �ySupplemental Information TYPE OF WO �+ a •J I,' '$ �. REQUIRE DATA:1-AND 2-FAMILY DWELLING ❑New construction ?} 1i._ Permit fees*are based on the value of the work performed. L' Addition/alteration/replacementmi , Indicate the value(rounded to the nearest dollar)of all 0 Other: equipment,materials,labor,overhead,and the profit for the work indicated on this application. CATEGORY OF CONSTRUCTION o 1-and 2-family dwelling LI Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: /o2.5 i9 •7 c w . , al....t,_. New dwelling area: square feet City/State/ZIP: i `s' l* - Garage/carport area: Suite/bldg./apt.#: Project name: square feet ., • 3/_ Covered porch area: Cross street/directions to job site: square feet Deck area: square feet Other structure area: square feet Subdivision: REQUIRED DATA:COMMERCIAL_USE'CHECKLIST I Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on thi $ Valuation: "x• 7 — — –iii - / ��� Existing building area: square feet rr, � New building area: s uare feet E rROPERTY OWNER o-, q � 1 'TENANT Number of stories: Name: D,, . ! • ,fin Address: a ��it641 Type of construction: i s i q5.w City/State/ZIP: ' Occupancy groups: • dce a Z_ Phone:(5a3 Ii Fax:( ) Existing: 'APPLICANT New: ❑ CONTACT PERSON BUILDING PERMIT FEES* , �! _' +,__ .�.�r� j _ __ _"�� ' ,se re er to ee schedule Business name: Contact name: — Structural plan review fee(or deposit): Address: 4,2 d S E. w FLS plan review fee(if applicable): City/State/ZI> / g, 9 702/y Total fees due upon application: Phone:(5-0 - // Fax::(56 ) - ,„ it Amount received: E-mail: PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of Business name: roof-top mounted Photo Voltaic Solar Panel System. °S4. LLD ail-aZtQ Submit two(2)sets of roof plan with connection details Address: • and fire department access,along with the 2010 Oregon City/State/ZIP: Solar Installation Specialty Code checklist. Permit fee(includes plan review Phone:( ) l Fax:( ) and administrative fees): $180.00 CCB Lic.: /L �/( State surcharge(12%of permit fee): $21.60 l Total fee due upon application: $201.60 Authorized signatyre. This permit application expires if a permit is not obtained I Print name: within 180 days after it has been accepted as complete. r'I/ )'cje/i,1j1^ k1 Date: .1 * Fee methodology set by Tri-County Building Industry / Service Board. I:\Building\Penuits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613 T(11/02/C OM/W EB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT el Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, [1] $ excluding painting and wallpapering: MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking (b) An accessible entrance: (c) An accessible route to the altered area: (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: (f) Accessible drinking fountains:and, (g) When possible,additional accessible elements such as storage and alarms: TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014 City of Tigard 1111 ■ a COMMUNITY DEVELOPMENT DEPARTMENT T I G A R D Building Permit Review — Commercial - With Land Use Building Permit #: 6 ,0,2�J i 7,ct- r),1 Site Address: /0 / -� p� in � of Suite/Bldg#: • Project Name: ch / 04rf (Name of mercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: f7 a6 �2k--��'l/ om or 477--)--- -tur Verify site address/suite# exists and active iinpermit syst9of. ver Terrace Neighborhood: ❑ In n No nd Use Case#: 2)2)p_��)- _ X60 rr Plan atch Approved Land Use: j Site Plan 1`o I •,ndscape Plan ❑ Other: I&rban Forestry Plan E Elevation Plan Q / 4uilding Height: Maximum Height Actual Height !�/D (?Y ae vt:Anditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance I% Business Licen Exists: Yes ❑ No,applicant notified to obtain business license ublic Facilities Improvement (PFI) Permit: Required: ❑ Yes,appli ant w s notified No Applied For: El Yes ❑ No,stop intake Notes: 4�'✓e�ti a— CJ " ' lie et1d0::' 0/'t12, �i'!C Approved by Planning: - - --_ —.. ,-`\, e� Date: l �/4/ - Revisions (after Building Submittal only) Reviewer Date Revision 1: E Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /*l i/7 Site Plans: # 3 Building Plans: # 3 Building Permit#: zter building�permift above. Workflow Routing: Ening III- gineering rmit Coordinator ding Workflow Sign-off: S' -off for Planning(include notes from planning review) Route Application Documents: pp Building: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: . .,._ Date: 1)//si//7 I:\Building\Forms\B1dgPermitRvw COM_WithLandUse 060116.docx Engineering Review ❑ Slope at building pad: El PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes El No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: �Sl Date: lz%�� Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved El Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ‘brSDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: Date: / tQ1 1r..--- I:\Building\Fonns\B1dgPennitRvw_COM_WithLandUse 070915.docx City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 12519 SW MAIN ST, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00321 Inspection Type: Inspector: 295 Misc. inspection Jeff Grove Result: PASS Comments: Violation Summary: Inspector Contractor