Loading...
Report (21) T J17S! 2oi '7 - do .270 "RIVER TERRACE MS LOT 180 1 6i5 ° el cll✓ �11,si,,,,i71, HUB AND TACK CERTIFICATION NE .& SE 1/4 SEC. 6, T 2 S, R 1 W, W.M. CITY OF TIG D, WASHINGTON COUNTY, OREGON SURVEYED. �'TEMBER 16,. 2017 PREPARED FOR: — -- -- _._., POLYGON NORTHWEST COMPANY 109 E. 13TH ST. ' TRACT "M" _ _ VANCOUVER, WA. 98660 T ____— — q 0. N89•58*43''W i 37.46' Vz-6 . . —_ 7. 25' PUBLIC UTILITY-- EASEMENT 3.46" 1 cc ' CI Liu 0 r r- < LOT LOT ui o l r, m 182181 r 18 j =' 180I '? cap 12.0o' 8 6' PUBLIC UTILITY bid EASEMENT' ,46. r 4 43#E \- REGISTERED 234f' tl PROFESSIONAL t LAND SURVEYOR C MI 14 '°'°'' 'Ad#(0„,...Nt OREGON JULY A '9 2002 __.,. <:6 AVIS C.JANSENN 67751 N. SW FRIENDLY LANE WIRENEWS:6/30/2019 I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE SURVEYOR IN THE STATE OF OREGON HEREBY CER2(3 I HAVE ACCURATELY SURVEYED ANDSTAKED THE OFFSETS THAT 1Q 20 TO THE FOUNDATION ENVELOPE FOR LOT 180 OF TIME PLATau issati OF °'RIVER TERRACE EAST". INCH =2 ! FEET =' DRAWN BY: T22.717 DATE: 9 L PACIFIC COMM' REVIEWED I3Y. DATE UNITY DESIGN PROJECT ISO.. 395-041 (503) =SEIRYE1ftIdG' (503) 941-9484 GEODESIGN FIELD REPORT GDI Project: Polygon-129-03 Pa•e 1 of 1 Prepared By: Ken Buckin•ham Project Name: River Terrace East � . Date. 12/27/17 Location: SW Scholls Ferry&SW Roy Rogers, Report#: 181 Beaverton Arrival: 1215 e.' Departure: 1330 Weather: Cloudy, 40's . Permit#: TBD Site Visit Requested By: Tom w/Polygon Met With (on site): Tom (via phone) Purpose: Observe Footing Su bgrade for lots 180-192 Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58 (12/06) Decommission temporary storm and sewer lines through Tract E FR-163 Deflection in roadway FR-177 soft fill from slope cut in lots 153, 154 and 155 Upon arrival, I talked with Tom from Polygon on the phone. He indicated the location of lots 180-192 (see attached site plan)where the subgrade evaluation was requested. Using a Y2"steel foundation probe, I evaluated the subgrade. Resistance to probing indicated a medium stiff to stiff subgrade. In lots 189, 190 and 191 we observed roots approximately Y2"to 2"in diameter. We recommend over excavating i' and backfilling with crushed rock in areas with a concentration of roots, within footing locations in lots 189, 190 and 191. Based on observations and probing, the subgrade observed today appears to have been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments:Site Plan (1) Reviewed by: This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations,The report can only be considered final upon review of the CeoDesign project manager,as indicated by initials in the"Reviewed By"section. Signature. 15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068