Loading...
Report (63) I?lcrao,7- aO hi® ALAN MASCORD DESIGN ASSOCIATES, INC. December 21, 2017 To: David Dehartport Four D Construction Re: Mascord plan 22162 - Four D Construction Bedroom 2 floor joists. Floor joists under Bedroom 2 were noted with 12" o.c. spacing on the plans. Using a 30 live load in the sleeping area per ORSC the floor joists may be spaced at 16" o.c. See provided bedroom floor joist calculation for verification. Please contact me with questions or comments. Thank you, atal/'James Rowell Plan Support 2187 NW Reed Street,Suite 100 Portland,Oregon 97210 503/225-9161 www.mascord.com Project:22162 FOUR D CONST I.* lie Location: BR#2 floor joists @16"0/C James Rowell 110 page Floor Joist Alan Mascord Design 2187 [2015 International Residential Code(2015 NOS)] nd, Reed St, Suite 100 1.5 IN x 11.25 IN x 18.5 FT @ 16 O.C. OR 97210 or Portland, #2-Douglas-Fir-Larch-Dry Use StruCaic Version 10.0.1.6 12/21/2017 9:27:03 AM Section Adequate By: 12.6% Controlling Factor: Moment DEFLECTIONS Center Live Load 0.29 IN U756 LOADING DIAGRAM Dead Load 0.09 in Total Load 0.38 IN U579 Live Load Deflection Criteria:U480 Total Load Deflection Criteria:0360 REACTIONS A g Live Load 385 lb 441 lb Dead Load 123 lb 123 lb Total Load 508 lb 564 lb Bearing Length 0.54 in 0.60 in SUPPORT LOADS A ¢ rRt Live Load 289 plf 331 plf 111111111111 Dead Load 92 plf 92 plf Total Load 381 plf 423 plf MATERIAL PROPERTIES #2-Douglas-Fir-Larch JOIST Base Values Adiusted Length 18.5 ft Center Bending Stress: Fb= 900 psi Fb'= 1035 psi Span Length Cd=1.00 CF=1.00 Cr=1.15 Unbraced Length-Top 0 ft Shear Stress: Fv= 180 psi Fv'= 180 psi Unbraced Length-Bottom 0 ft Cd=1.00 Floor sheathing applied to top of joists-top of joists fully braced. Modulus of Elasticity: E= 1600 ksi E= 1600 ksi Floor Duration Factor 1.00 Comp.--to Grain: Fc-1= 625 psi Fc-1-'= 625 psi JOIST LOADING Controlling Moment: 2424 ft-lb Uniform Floor Loading Center 9.62 Ft from left su DeadDL Live Load LL= 30 psf pport of span 2(Center Span) Load D = 10 psf Created by combining all dead loads and live loads on span(s)2 Total Load Controlling Shear: -503 lb TL= 40 psf TL Adj.For Joist Spacing wT= 53.3 plf At a distance d from right support of span 2(Center Span) Partially Distributed Loading Created by combining all dead loads and live loads on span(s)2 Live Load LL= 10 psf Dead Load DL= 0 psf Comparisons with required sections: Req'd Provided Load Start A= 12 ft Section Modulus: 28.11 in3 31.64 in3 Load End Area(Shear): B= 18.5 ft 4.19 int 16.88 in2 Load Length C= 6.5 ft Moment of Inertia(deflection): 155.35 in4 244.76 in4 Moment: 2424 ft-lb 2729 ft-lb Shear: -503 lb 2025 lb Decking Information Plywood Thickness: T= 3/4 in Plywood Is Glued: Moment of Inertia Calculations For Glued Floor: Joist Area: A-joist= 16.88 IN2 Plywood Area: A-ply= 2.08 IN2 Section Centroid: C= 6 IN ABOVE BASE Moment of Inertia(deflection): i-comb= 245 IN4 NOTES