Loading...
02/09/1995 - Packet AGENDA • TIGARD I-WRAHY BOARD THURSDAY, FEBRUARY 9, 1995 - 7:00 P.M. TIGARD CITY HALL-TOWN HALL CONFERENCE ROOM 13125 SW HALL BLVD. TIGARD, OREGON City of Tigard 1. CALL TO ORDER 2. ROLL CALL: BURGESS CUNDIFF HART ZELL HOKLIN IRWIN KOSTOL LEWIS 3. Approve Minutes of January 12, 1995. 4. Monthly Report for January 1995. 5. Friends of the Library Report. 6. Cooperative Library Advisory Board Report. 7. Library Goals - Letter to City Administration. 8. County Bond Issue. 9. Relationship with Council - Joint Meeting. 10. Other Business. 11. Adjournment - To Library to See New Service Area. TO ENSURE A QUORUM TO CONDUCT BUSINESS, PLEASE CALL AND LEAVE A MESSAGE AT THE LIBRARY(684-5886), IF YOU ARE UNABLE TO ATTEND. h:UogiftonnieVib-A TIGARD LIBRARY BOARD January 12, 1995 MINUTES Call to Order: 7:06 p.m., by Marilyn Hartzell, Chairperson. Roll Call: Marilyn Hartzell, Chris Lewis, Carl Kostol, Yvonne Burgess, and Lorin Hoklin. Staff: Kathy Davis. Minutes: Hoklin moved to approve November minutes, Lewis moved to approve December minutes, seconded by Burgess. Reports: November Monthly Repo - A committee of library staff has reviewed the practice of allowing employees and volunteers exemptions from library fines and the ability to purchase books for personal use with the library's discount. Committee decided to end this practice. Board supported the change. Tigard House will open as a museum the second Sunday of every month. Volunteers will conduct a tour and history information. Director revisited bad weather policy. Director presented to CLAB Hoklin's letter concerning Board's view of a county-wide obligation bond for library construction. Circulation was up November and December with December being the highest day with 2,600 items circulated. Patrons with library fines exceeding $50 will receive a letter reminding them of their unpaid fines. Other libraries have found that going after delinquent fines via a collection agency has resulted in poor retrieval. Library is displaying educational information regarding other holidays celebrated throughout the world. Board was glad to hear that these holiday displays are for educational purposes. December Monthly Report - There are complications with the new library wing's wiring. Cables are crossing with computers and phone lines and causing communication difficulties. The final outcome may be to completely rewire, which would be costly. A request was made by a patron to display several brochures on religious tracts. A reply was given, however, due to space limitations, the library would accept one stack of informational brochures from any Tigard area church that cared to distribute the information through the library. A response has not been received from patron. Friends of the Library: So far, the Friends have received $135 for Entertainment Books and $37 for NW Getaways books. They will be on sale until February 14. December used book sales were up to $227. FOL received a $141.80 credit at Powell's for the holiday book sale. There are ideas of changing the process next year. Estimated costs for redesigning the puppet stage to fit Children's Librarian designs are being looked into. The Writer's Workshop will be held February 11. FOL will sell boxed lunches for $5.25. FOL will receive 50 cents for each lunch purchased. A Writer's Group member donated $1,000 to expand the local writers • • collection. FOL is looking at off-site locations for a used book store for yearly sales. .L.A.B.: Main issue is budget preparation. Looking at every service WCCLS provides. A subcommittee has been set up to look at the existing funding formula. County Bonds Issue: Director presented Hoklin's letter of Board concerns to CLAS. Feedback from Tigard Administrator, Bill Monahan, indicates the City would want to keep library as cooperative as the general opinion is that there is high regard for libraries. Process will be slow in the decision to move as districts or cooperatives. Director outlined some concerns such as would all WCCLS members need to be a part of decision? Do interested parties carry on without WCCLS? Peggy Forcier, Manager WCCLS, will compile information on square footage of all libraries and compare to OLA recommendations on minimum square footage per user. She will then use this comparison to estimate costs of upgrading all County libraries to this minimun size. Charges for Replacement of Library Materials: Director consulted with Circulation Manager, Paula Walker, on material replacement fees. If an item is to be replaced, cost charged to patron is the cost library purchased item for. If the cost is not in the computer, a default list is available. WCCLS gathers average price of books purchased and comes up with list prices which is called default list. Tigard Library is in process of revising their policy which consists of: If cost is not available in computer, employee will look up price in Books-in-Print, published by Bowker, and will charge that price. If not in Books-in-Print, will refer to default list provided by WCCLS. Goal Setting: Director asked Board to give ideas regarding issues to address that are important for the coming year and to arrange these issues in long and short term goals. Long-term Goals: Main long-term goal Is the need to acquire more space. These Ideas could be obtained as a result of more space: • Ongoing movement towards expanded technology and computer use • Teen Center(comfortable chairs,viewing/listening center/homework help) • Display arts, expand art collection 0 Focus on teenagers • Focus on education • Focus on more children's programs and activities associated with children and growth • Area in library designated specifically as community space, such as programming area, tutoring possibilities, meeting space, etc. • Bring in espresso cart to serve library patrons while in the library Short-term Goals: • Expand music collection and space for patrons to appreciate music • Focus on senior citizens (Senior Open House) - an outreach to senior citizens and their particular needs The consensus of the Board is to focus on plans for how the library can be expanded to meet the needs of citizens with a high value for education. The Board would like to convey the feeling of a sense of community by accommodating the community well regarding issues that are important which whould be reflected in library services. Other Business: Nominations for new Chair: Burgess moved to nominate Hartzell as Chair for a second year and keep Kostol as Vice-Chair. Seconded by Hoklin. Motion passed unanimously. Adjournment: Meeting adjourned at 9:10 p.m. HALOGIMCONNIEWI)MIN • MEMORANDUM • CITY OF TIGARD, OREGON TO: Bill Monahan, City Administrator FROM: Kathy Davis, Library Directo �L DATE: February 3, 1995 SUBJECT: Monthly Report, January 1995 Technology Bottleneck: Increasingly, we are finding that our ability to complete work or provide service is dependent upon having access to the appropriate system, database, or software. Even having a position in the library dedicated to "technical support" has not eased the crunch - so much time goes towards maintaining equipment that the schedule for implementing planned changes is on a one year backlogl I will be working with Paul DeBruyn and Valerie Yunker to identify areas where we may need to bring in outside help to get over this hump and move forward with our technical program. Kiwanis Tour Library: The Tigard Kiwanis Club held their January meeting in the library to have the opportunity to learn about library resources and get an overview of library technology. Staff gave instruction on use of the on-line access file and CD Rom network. New Service Area: The Readers Services Division took the lead in redesigning a central Reference area that will be more accessible, visible, and efficient as well as provide space for double staff coverage. The "Big Move" happened in January and the results are very satisfactory. Kudos to all the staff involved as well as Public Works personnel who provided the sweat and tearsl New Adult Librarian: Sharon Brunk, formerly a Head Librarian for a private secondary school in Hawaii, will be joining the TPL staff beginning February 6, 1995. Sharon will be responsible for selecting all Adult library materials, as well as providing Reader's Advisory and planning programs and events of interest to adults. Sharon's attributes include fluency in Spanish, two advance degrees in Ubrary Science, and developing a CD Rom Information System. Busy Time at Circulation . Four hundred and forty-five new borrowers were added and we reached a NEW ALL-TIME CIRCULATION RECORDI The library checked out 43,802 items in January - a 30 percent increase over December- and beating our previous record by almost 500 itemsl Check-in also broke a record at 51,162 itemsl Thanks to staff and volunteers for their extra efforts in keeping up with the tidel Staff Training: All Readers Services staff attended the "On-Line" conference in Eugene. Circulation staff have been taking advantage of teleconferences offered through the State Library. Oregon Telecommunications Forum: I attended the O.T.F. conference January 22-24. More than 500 people from a variety of agencies participated in designing a "super group" that will oversee statewide development of telecommunications applications and technology. Libraries will be asked to play a key role in this by making equipment accessible to the public and providing basic training. CLAB: WCCLS Manager has completed data on the total Service Areas of all member libraries projected out 10 and 20 years. From this we can calculate the minimum square footage required to meet ALA service standards and determine how far short of that goal county libraries are as a group. That number, times the average cost of library construction per square foot will give us the approximate amount of any bond for county library construction. February's meeting will be focused on discussing this amount. Volunteers: Twelve new volunteers were added this month. Volunteer Type Number Hours Adult 80 811.00 Youth 9 37.00 Adopt-a-Shelf 7 22.00 YART 5 10.00 Library Board 5 10.00 Community Service 4 29.25 21 st Century Academy _Q 0.00 (CE 2) Total 110 919.25 = FTE WORK INDICATORS &IJUARY1995 JANUARYJSJANUARY 1993 Adult Materials 25,398 24,669 23,011 Juvenile Materials 18.404 18.715 16.450 Total 43,802 43,384 39,461 Days of Service 26 25 26.5 Average Daily Circulation 1,685 1,735 1,489 Hours of Service 260 268 260 Materials Circulated per Hour 168 162 152 Increase in Circulation 1% 9.9% 13.9% Materials Added/Withdrawn 863/1,693 850/238 717/161 Borrowers Registered 445 407 358 Story Time 605 270 240 (Number of Sessions) (17) (12) (12) Toddler Time 188 86 86 (Number of Sessions) (8) (12) (9) Special Programs 175 72 219 (Number of Sessions) (3) (3) (6) Visitors 18,956 — — (Gate Count divided by 2) Increase in Visitors N/A N/A N/A Fines/Fees Collected $3,939.49 $3,787.00 $3,777.57 Gifts Received $ 18.65 $ 68.44 $ 544.83 HALOGIN\CONNIE\KDMTH RPT Tigard Library Board Tigard Public Library 13125 S.W. Hall Boulevard Tigard, Oregon 97223 January 23, 1995 William Monahan City Administrator City of Tigard 13125 S.W. Hall Blvd. Tigard, OR 97223 Dear Mr. Monahan: Kathy Davis, Tigard Public Library Director,has asked the Tigard Library Board to help establish both long- and short-range goals for the Library. Accordingly, the Board devoted considerable attention to this matter during its January meeting and reached the following conclusions. With respect to the long term, the Board believes strongly that the principal goal must be acquisition of more space. The Library desperately needs more space in order to continue upgrading and expanding electronic information services, including use of computers and data base networks. Also, the Board places a high priority on providing space and facilities for teenagers, including an area for homework, a listening center and a meeting room, all of which require more space. We see a need for additional children's programs and activities, as well as meeting rooms and facilities for community activities (e.g., programs for seniors, service groups and tutoring). With respect to the short term, the Board believes that the Library should seek to expand the collection; expand the music collection and provide a space that patrons can use for listening; and expand the Library's outreach program to seniors in order to meet their specific needs. These short-range goals also reflect a need for more space, inasmuch as the Library now taxes the current physical plant beyond its designed capacity. Generally speaking, the Board believes that the Library's focus must be two- fold: expanding in order to meet the needs of a growing population, and improving services that relate specifically to education. The Library plays an important role in fostering a sense of community, and the Board wishes to reinforce that role. Budget pressures have forced many schools to cut their own library services. The Board believes that the Tigard Public Library must enhance its assets and Monahan • • January 23,1995 Page 2 services in order to ensure that Tigard-area students don't suffer because of cutbacks in school libraries. As members of the community, the Board believes that the Tigard Public Library should serve the community's needs, and that the Library's services and facilities should address the issues that the public feels are important. Among these are a sense of community, education, activities for young people, programs for seniors and electronic information services. The goals stated above reflect these concerns. Thank you for your attention to these matters. Signed The Tigard Library Board Washington County r0 Coopekatwe nay To: Cooperative Library Advisory Board Members From: Peggy Forcier, Manager�z Re: General Estimate of Countywide Capital Construction (assts Date: January 20, 1995 At the January Cooperative Library Advisory Board (CLAB) meeting there was a request for an estimate of the cost of bringing the combined square footage of Washington County libraries up to the OLA standard for adequacy of .6 square foot per person, for the years 2005 and 2015. Population: Countywide population for the years 2005 and 2015 are estimated as 433,500 and 500,200 respectively. (Source: Bob Haas, County Land Use and Transportation Department from Metro's Interim 2015 Forecast Draft. The cities, the County, and Metro work together to build the population forecasts. The current Forecast was agreed upon in 1987. In approximately three months the draft Interim Forecast for 2015 is expected to be approved and in two years, to be finalized.) Square Footage Needed: In 1995 public libraries have a combined square footage of 97,597. Using the population projections above, the square footage required would be: 2005 260,100sqft (an increase of 162,503sqft from 1995) 2015 300,120sqft (an increase of 202,523sqft from 1995) Cost per Square Foot: The Oregon State Library currently uses three levels of quality and three corresponding cost estimates for public library construction projects. "A" Quality Library design is highly functional and aesthetically pleasing. Construc- tion materials. HVAC and lighting systems are of high quality. The services of a professional interior designed are utilized. All furnishings are new and of high quality. Art work is purchased for the facility drawing on a budget equivalent to 1% of the cost of construction. The services of a professional landscape architect are used. "B" Quality Library design concentrates on functionality rather than on aesthetics. Construction materials, HVAC and lighting systems are of average quality. Furnish- ings are of average quality and some furniture from the existing library may be used in the new facility. Art work is purchased for the facility drawing on a budget equivalent to 1%of the cost of construction. "C" QuWU Library design is simple, though functional. Cost considerations predom- inate in the selection of construction materials. HVAC, lighting systems, and furnish- ings. Much of the furniture from the eidsting library is used to furnish the new library. Mail: PO Box 5129, Aloha, OR 97006 • Location: 17880 SW Blanton St.,Aloha, OR W (503)642-1544, Fox 591-0445, TDD#642-2724 Constriction Coast Estimates 1i = on State 1994' (Does NOT include:the purchase of.Iand::site preparation or parking) Construction building $901sgf1 $70Jsgft $50/s4ft landscaping ..05%:.ofbldg costs ,0596. .45prb gft) ($0:35 f sgft): ($0.25/sgft) Professional architectural & &5%of bldg costs. 8:5% 8.5% Services engineering., ($7 65f ) ($5.951sgft) ($4:25/sgft) < Interior design $.75/sqft M landscape architect I0%of landscpg.costs na na. ($.045/sqft) Furnishings furniture & equip $13/sgft 40/.64 $8/sgft public art 1%of bldg costs 1% ria ($0:90/sgft) ($0.70/sgft) Miscellaneous 596 of bldg casts 5% 96 5 &Contingency ($4.50/sgft).. E$3.50/sgft).'' ($2;50/sgft) L TOTAL COST $117.30J&gft $B4.$lfJsqft. Jsgft Beaverton's cost estimates (from consultant Dick Waters) are $100/sqft for the building which does not include the cost of acquiring land but DOES include site preparation and parking. Waters estimates $40/sgft to finish out interiors; $18/sqft for furnishings & equipment; 1% of building costs for art, 8% for design fees and 10% for contingency --- for a total of 175.51/sgft. Beaverton Library Director Shirley George says this is a high estimate and they are hoping actual costs are lower. Douglas County Library, opened in 1994, was constructed for $70/sqft. including everything except furnishings or land acquisition. Corvallis Public Library, opened in late 1992, was constructed for $90/sqft including parking and $200,000 for site prep and land acquisition. Washington County Projected Costs.- Using osts:Using $100/sqft ($84.55/sqft plus $15.45 for land acquisition, site prep and parking), the cost countywide for libraries, which as a group met the OLA standard for adequacy of .6sgft/person, would be: all new construction existing + new construction 2005 $26,100,000 (260,100sgft) $16,250,300 (162,503sgft) 2015 $30,012,000 (300,120sgft) $20,252,300 (202,523sgft) .• H" wb: l $1 &V— a lloea•-esc,? ! j I > • xj l-t .*'R' ��f1r7-, rrv.,1• ' wk,' f/r�l"✓tj(lL yYt�t ,( L0 ' Ec4SeC fr�#-