Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (38)
/1zt 5 T'L/ 7 -- C2 2-12 c-/1 S w / dr--( I here by certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am NICET Certified at Level IV. Brent D Kotula Date: eq. No.'113889',. II I R AquaSAFETM FIRE SAFETY SYSTEM OFFICE : zpY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : RIVER TERRACE EAST TH -One Head Calculation (H.1) Drawing : RESIDENTIAL Location : UNIT K-6 1-1/2 SERVICE TIGARD OR 97223 Remote Area : 1 Contract : 19816F 035 Data File : 19816F 035 River Terr East K-6, 1-1_2 serv.wxl Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 p. Uponor Page 1 RIVER TERRACE EAST TH -One Head Calculation (H.1) Date 12/6/2017 HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE EAST TH Date - 12/4/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 1 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 035 Calculated By - PATRICK BROWN Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: (X) 1 ( )2 ( )4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 17 Gpm System Type Listed Pres. at Start Point - 12 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 18 x 18 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 129 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 17 Psi Required 53.87 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: A Date of Test - x Rated Cap. T Time of Test - x @ Psi E Static (Psi) - 100 Elev. R Residual (Psi) - 95 Other Flow (Gpm) - 300 S Elevation - 100 P Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Page 2 Date 12/6/2017 City Water Supply: Demand: Cl -Static Pressure : 100 D1 -Elevation : 12.560 C2-Residual Pressure: 95 D2-System Flow : 16.974 C2- Residual Flow : 300 D2-System Pressure : 53.868 Hose(Demand) D3-System Demand : 16.974 Safety Margin : 46.107 150 140 130 p 120 R 110 C1 E 100 0 - C2-e — — S 90 S 80 U 70 R 60 u1 E 50 40 30 20 10 D1 50 100 150 200 250 300 350 400 450 FLOW(NA1.85) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Uponor Page 3 RIVER TERRACE EAST TH-One Head Calculation (H.1) Date 12/6/2017 Fitting Legend Abbrev. Name % ' 1 11/4 1% 2 2% 3 31/2 4 5 6 8 10 12 14 16 18 20 24 E 90'Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Generic Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA 2007 Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Dat 4 te 12/6/2017 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 100.0 95 300.0 99.975 16.97 53.868 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.1 129.0 4.9 12.0 16.97 T.14 129.0 14.08 T.15 129.0 14.37 H.3 129.0 14.43 T.16 129.0 14.47 H.4 129.0 14.51 T.17 129.0 14.75 T.25 119.0 19.3 T.31 109.0 24.13 T.30 109.0 24.47 S.1 104.0 27.41 PRV 100.0 44.36 MTR 100.0 50.22 STR 100.0 53.87 T.13 129.0 13.69 T.18 119.0 18.89 H.2 129.0 14.03 H.5 129.0 14.14 H.7 129.0 14.29 H.6 129.0 14.41 T.20 119.0 18.59 T.21 119.0 18.98 H.9 119.0 19.08 T.26 119.0 19.5 T.33 109.0 24.06 T.32 109.0 24.08 H.8 119.0 18.73 T.19 119.0 18.89 T.23 119.0 19.1 T.24 119.0 19.12 T.27 119.0 19.29 H.11 119.0 19.4 1 H.10.28 119.0119.0 19.1119.41 H.12 109.0 24.07 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Page 5 Uponor Date 12/6/2017 RIVER TERRACE EAST TH-One Head Calculation (H.1) Hyd. Qa Dia. Fitting Pipe Pt Pt ******* Notes ****"* Ref. "C" or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.1 6.19 0.671 Utb 17.0 7.000 12.000 K Factor=4.90 to 150.0 0.0 17.000 0.0 T.14 6.19 0.0867 0.0 24.000 2.082 Vel = 5.62 T.14 -4.07 0.671 Utr 2.0 5.000 14.082 to 150.0 Utb 17.0 19.000 0.0 Vel = 1.92 T.15 2.12 0.0120 0.0 24.000 0.288 T.15 0.0 0.671 Utr 2.0 3.000 14.370 to 150.0 0.0 2.000 0.0 Vel = 1.92 H.3 2.12 0.0120 0.0 5.000 0.060 H.3 0.0 0.671 Utr 2.0 1.000 14.430 to 150.0 0.0 2.000 0.0 T.16 2.12 0.0120 -- 0.0 3.000. 0.036 -_ Vel= 1.92 T.16 0.0 0.671 Utr 2.0 2.000 14.466 to 150.0 0.0 2.000 0.0 H.4 2.12 0.0120 0.0 4.000 0.048 Vel = 1.92 H.4 0.0 0.671 Utb 17.0 3.000 14.514 to 150.0 0.0 17.000 0.0 Vel= 1.92 T.17 2.12 0.0120 0.0 20.000 0.240 T.17 2.08 0.862 Utr 2.0 15.000 14.754 to 150.0 0.0 2.000 4.331 T.25 4.2 0.0125 0.0 17.000. 0.213 Vel = 2.31 T.25 0.47 0.862 Utb 17.0 19.000 19.298 to 150.0 0.0 14.000 4.331 T.31 4.67 0.0152 0.0 33.000 0.501 Vel= 2.57 T.31 3.77 1.054 0.0 20.000 24.130 to 150.0 0.0 0.0 0.0 Vel= 3.10 T.30 8.44 0.0170 0.0 20.000 0.340 T.30 8.53 1.054 Utr 4.0 6.000 24.470 to 150.0 T 2.44 6.440 2.166 S.1 16.97 0.0621 0.0 12.440 0.773 Vel= 6.24 S.1 0.0 1.054 2E 2.44 1.000 27.409 ** Fixed Loss= 15 to 150.0 0.0 2.440 16.732 PRV 16.97 0.0622 0.0 3.440 0.214 Vel= 6.24 PRV 0.0 1.244 2E 3.443 100.000 44.355 Fixed Loss= 3 to 150.0 0.0 3.443 3.000 Vel** Fi4.48 MTR 16.97 0.0277 0.0 103.443 2.867 MTR 0.0 0.995 E 2.336 35.000 50.222 to 150.0 T 5.841 9.345 0.0 Vel= 7.00 STR 16.97 0.0822 G 1.168 44.345 3.646 0.0 16.97 53.868 K Factor= 2.31 H.1 10.78 0.671 Utr 2.0 5.000 12.000 to 150.0 0.0 2.000 0.0 Vel = 9.78 T.13 10.78 0.2419 0.0 7.000 1.693 T.13 -2.08 0.862 Utr 2.0 15.950 13.693 to 150.0 0.0 2.000 4.331 T.18 8.7 0.0480 0.0 17.950 0.862 Vel= 4.78 T.18 -0.16 0.862 Utb 17.0 13.000 18.886 to 150.0 0.0 14.000 4.331 T.30 8.54 0.0464 0.0 27.000 1.253 Vel= 4.69 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 r r Final Calculations - Hazen-Williams Uponor RIVER TERRACE EAST TH-One Head Calculation (H.1) Dat 6 te 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 0.0 8.54 24.470 K Factor= 1.73 T.13 2.08 0.671 Utb 17.0 10.000 13.693 to 150.0 Utr 2.0 19.000 0.0 H.2 2.08 0.0115 0.0 29.000 0.334 Vel= 1.89 H.2 0.0 0.671 Utr 2.0 8.000 14.027 to 150.0 0.0 2.000 0.0 H.5 2.08 0.0116 0.0 10.000 0.116 Vel= 1.89 H.5 0.0 0.671 Utr 2.0 11.000 14.143 to 150.0 0.0 2.000 0.0 H.7 2.08 0.0115 0.0 13.000 0.150 Vel= 1.89 H.7 0.0 0.671 0.0 10.000 14.293 to 150.0 0.0 0.0 0.0 H.6 2.08 0.0115 0.0 10.000 0.115 Vel= 1.89 H.6 0.0 0.671 Utb 17.0 11.000 14.408 to 150.0 Utr 2.0 19.000 0.0 T.17 2.08 0.0115 0.0 30.000 0.346 Vel= 1.89 0.0 2.08 14.754 K Factor= 0.54 T.14 4.07 0.862 0.0 14.773 14.082 to 150.0 0.0 0.0 4.331 T.20 4.07 0.0118 0.0 14.773 0.175 Vel = 2.24 T.20 -1.49 0.671 Utr 2.0 4.000 18.588 to 150.0 Utb 17.0 19.000 0.0 T.21 2.58 0.0171 0.0 23.000 0.393 Vel = 2.34 T.21 0.0 0.671 Utr 2.0 4.000 18.981 to 150.0 0.0 2.000 0.0 H.9 2.58 0.0172 0.0 6.000 0.103 Vel = 2.34 H.9 0.0 0.671 Utb 17.0 7.000 19.084 to 150.0 0.0 17.000 0.0 T.26 2.58 0.0171 0.0 24.000 0.411 Vel= 2.34 T.26 1.19 0.862 Utr 2.0 21.000 19.495 to 150.0 0.0 2.000 4.331 T.33 3.77 0.0102 0.0 23.000 0.235 Vel= 2.07 T.33 -0.30 0.862 0.0 2.000 24.061 to 150.0 0.0 0.0 0.0 T.32 3.47 0.0085 0.0 2.000 0.017 Vel= 1.91 T.32 0.30 0.862 Utr 2.0 3.000 24.078 to 150.0 0.0 2.000 0.0 T.31 3.77 0.0104 0.0 5.000 0.052 Vel= 2.07 0.0 3.77 24.130 K Factor= 0.77 T.20 1.49 0.671 Utb 17.0 6.000 18.588 to 150.0 0.0 17.000 0.0 H.8 1.49 0.0062 0.0 23.000 0.143 Vel= 1.35 H.8 0.0 0.671 Utb 17.0 6.000 18.731 to 150.0 Utr 2.0 19.000 0.0 T.19 1.49 0.0062 0.0 25.000 0.156 Vel = 1.35 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 ti Final Calculations - Hazen-Williams Uponor Page 7 RIVER TERRACE EAST TH -One Head Calculation (H.1) Date 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt ***.*** Notes "" " Ref. "C" or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.19 0.16 0.671 Utr 2.0 10.000 18.887 to 150.0 Utb 17.0 19.000 0.0 T.23 1.65 0.0075 0.0 29.000 0.218 Vel = 1.50 T.23 -0.30 0.671 Utr 2.0 1.000 19.105 to 150.0 0.0 2.000 0.0 T.24 1.35 0.0053 0.0 3.000 0.016 Vel= 1.22 T.24 0.30 0.671 Utb 17.0 6.000 19.121 to 150.0 0.0 17.000 0.0 T.27 1.65 0.0075 0.0 23.000 0.173 Vel = 1.50 T.27 -0.46 0.671 Utb 17.0 6.000 19.294 to 150.0 Utr 2.0 19.000 0.0 H.11 1.19 0.0041 0.0 25.000 0.103 Vel= 1.08 H.11 0.0 0.671 0.0 3.000 19.397 to 150.0 0.0 0.0 0.0 T.28 1.19 0.0040 0.0 3.000 0.012 Vel = 1.08 T.28 0.0 0.671 Utr 2.0 2.000 19.409 to 150.0 Utb 17.0 19.000 0.0 T.26 1.19 0.0041 0.0 21.000 0.086 Vel= 1.08 0.0 1.19 19.495 K Factor= 0.27 T.18 0.16 0.862 Utb 17.0 5.000 18.886 to 150.0 0.0 14.000 0.0 T.19 0.16 0.0001 0.0 19.000 0.001 Vel= 0.09 0.0 0.16 18.887 K Factor= 0.04 T.23 0.30 0.671 Utb 17.0 6.000 19.105 to 150.0 Utr 2.0 19.000 0.0 H.10 0.3 0.0004 0.0 25.000 0.009 Vel = 0.27 H.10 0.0 0.671 Utb 17.0 5.000 19.114 to 150.0 0.0 17.000 0.0 T.24 0.3 0.0003 0.0 22.000 0.007 Vel= 0.27 0.0 0.30 19.121 K Factor= 0.07 T.27 0.46 0.862 Utb 17.0 2.000 19.294 to 150.0 0.0 14.000 0.0 T.25 0.46 0.0002 0.0 16.000 0.004 Vel = 0.25 0.0 0.46 19.298 K Factor= 0.10 T.33 0.30 0.671 Utb 17.0 11.000 24.061 to 150.0 Utr 2.0 19.000 0.0 H.12 0.3 0.0003 0.0 30.000 0.009 Vel = 0.27 H.12 0.0 0.671 Utb 17.0 8.000 24.070 to 150.0 0.0 17.000 0.0 T.32 0.3 0.0003 0.0 25.000 0.008 . Vel = 0.27 0.0 0.30 24.078 K Factor= 0.06 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 r I here by certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am NICET Certified at Level IV. Brent D Kotula Date: Req. No. 113889 AquaSAFETM FIRE SAFETY SYSTEM OFFICE COPY Uponor 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Drawing : RESIDENTIAL Location : UNIT K-6 1-1/2 SERVICE TIGARD OR 97223 Remote Area : 1 Contract : 19816F 035 Data File : 19816F 035 River Terr East K-6, 1-1_2 serv.wx2 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor Page 1 RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Date 12/6/2017 HYDRAULIC DESIGN INFORMATION SHEET Name - RIVER TERRACE EAST TH Date - 12/4/17 Location - TIGARD OR 97223 Building - RESIDENTIAL System No. - 1 Contractor - ALLIANCE PLUMBING Contract No. - 19816F 035 Calculated By - PATRICK BROWN Drawing No. - F100 Construction: (X) Combustible ( ) Non-Combustible Ceiling Height 9 OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: ( ) 1 (X)2 ( ) 4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 13 Gpm System Type Listed Pres. at Start Point - 7.04 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 16 x 16 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 129 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 26.0732 Psi Required 71.23 At Ref Pt STR Summary C-Factor Used: Overhead 1,50 Underground 150 W Water Flow Test: Pump Data: A Date of Test - x Rated Cap. T Time of Test - x @ Psi E Static (Psi) - 100 Elev. R Residual (Psi) - 95 Other Flow (Gpm) - 300 S Elevation - 100 P Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor ' RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Page 2 Date 12/6/2017 City Water Supply: Cl -Static Pressure : 100 Demand: C2- Residual Pressure: 95 D1 -Elevation : 12.560 C2- Residual Flow : 300 D2-System Flow :26.073 D2-System Pressure : 71.226 Hose (Demand) D3-System Demand : 26.073 Safety Margin : 28.719 150 140 • 130 • p 120 R 110 Cl E 100 ° C2 S 90 S 80 D2 U 70 R 60 E 50 40 30 20 10 D1 50 100 150 200 250 . . . . . .300 . . 350 400 450 FLOW(N ^ 1.85) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Page 3 Uponor Date 32/6/2017 RIVER TERRACE EAST TH-Two Head Calculation (H.7 &H.6) Fitting Legend , , 3% 10 12 14 16 18 20 24 Abbrev. Name + ' 1 1/< 1/� 2 2/: 3 4 5 6 8 E 90'Standard Elbow 2 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Generic Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 117 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA 2007 Uponor RIVER TERRACE EAST TH-Two Head Calculation (H.7& H.6) Page 4 Date 12/6/2017 SUPPLY ANALYSIS Node at Static Residual Source Pressure Pressure Available Flow Pressure Total Demand Required Pressure STR 100.0 95 300.0 99.946 26.07 71.226 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.7 129.0 4.9 7.04 H.5 129.0 13.0 10.49 H.2 129.0 T.13 129.0 10. 4 T.18 119.0 20.833 26.15 T.30 109.0 S.1 104.0 32.74 36.61 PRV 100.0 53.82 MTR 100.0 63.16 STR 100.0 71.23 H.6 129.0 4.9 7.12 13.07 T.17 129.0 20.07 T.25 119.0 25.88 T.31 109.0 31.82 H.4 129.0 20.45 T.16 129.0 20.53 H.3 129.0 20.58 T.15 129.0 20.68 T.14 129.0 21.14 T.20 119.0 25.69 T.21 119.0 26.2 H.9 119.0 26.34 T.26 119.0 26.87 T.33 109.0 31.68 T.32 109.0 31.72 H.1 129.0 20.9 H.8 119.0 25.88 T.19 119.0 26.07 T.27 119.0 26.01 H.11 119.0 26.44 T.28 119.0 26.5 T.24 119.0 26.04 T.23 119.0 26.04 H.10 119.0 26.04 H.12 109.0 31.7 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Page 5 Uponor Page 52/6/2017 RIVER TERRACE EAST TH -Two Head Calculation (H.7 &H.6) Hyd. Qa DiaFitting Pipe Pt Pt Ref. ******* Notes ****** .C�� or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.7 11.33 0.671 Utr 2.0 11.000 7.040 KFactor=4.90 to 150.0 0.0 2.000 0.0 Vel= 10.28 - -- H.5 11.33 0.2652 0.0 13.000 3.447- _ - - - --H.5 0.0 0.671 Utr 2.0 8.000 10.487 to 150.0 0.0 2.000 0.0 Vel= 10.28 0.0 10.000 2.651- _ H.2 11.330.265 - - - -- H.2 0.0 0.671 Utb 17.0 10.000 13.138 to 150.0 Utr 2.0 19.000 0.0 Vel= 10.28 T.13 11.33 0.2651 0.0 29.000 7.689 T.13 -1.93 0.862 Utr 2.0 15.950 20.827 to 150.0 0.0 2.000 4.331 0.0 17.950 0.995 - -Vel = 5.17_ -- - _ -- T.18 -_ -- -9.4 -- -0.0554--- _- -- - - T.18 2.32 0.862 Utb 17.0 13.000 26.153 to 150.0 0.0 14.000 4.331 T.30 11.72 0.0834 0.0 27.000 2.251 - - Vel = 6.44 -- - --- T.30 14.35 1.054 Utr 4.0 6.000 32.735 to 150.0 T 2.44 6.440 2.166 Vel= 9.59 S.1 26.07 0.1374 0.0 12.440 1.709 S.1 0.0 1.054 2E 2.44 1.000 36.610 ** Fixed Loss= 15 to 150.0 0.0 2.440 16.732 Vel= 9.59.---- - -- - PRV--- - 26.07 0.1378. 0.0 3.440 0.474 ---- ---- PRV 0.0 1.244 2E 3.443 100.000 53.816 to 150.0 0.0 3.443 3.000 Vel**Fixed Loss= 3 6.88 MTR 26.07 0.0613 0.0 103.443 6.342 MTR 0.0 0.995 E 2.336 35.000 63.158 to 150.0 T 5.841 9.345 0.0 Vel= 10.76 STR 26.07 0.1819 G 1.168 44.345 8.068 0.0 26.07 71.226 K Factor= 3.09 - - - - - - H.7 --- 1.67 0.671 0.0 10.000 7.040 150.0 0.0 0.0 0.0 to 0.0 10.000 0.077 Vel= 1.52 H.6 1.67 0.0077 H.6 13.07 0.671 Utb 17.0 11.000 7.117 KFactor=4.90 to 150.0 Utr 2.0 19.000 0.0 Vel = 13.37 0.0 30.000 12.952 T.17 _ --.14.74 0.4317_- _ -- T.17 -2.73 0.862 Utr 2.0 15.000 20.069 to 150.0 0.0 2.000 4.331 T.25 12.01 0.0872 0.0 17.000 1.483 Vel = 6.60 - - - - - T.25 -3.23 0.862 Utb 17.0 19.000 25.883 to 150.0 0.0 14.000 4.331 Vel= 4.83 T.31 8.78 0.0488 0.0 33.000 1.611 T.31 5.57 1.054 0.0 20.000 31.825 150.0 0.0 0.0 0.0 to 0.0 20.000 0.910 Vel= 5.28 T.30 14.35 0.0455 0.0 32.735 KFactor= 2.51 14.35 T.17 2.73 0.671 Utb 17.0 3.000 20.069 to 150.0 0.0 17.000 0.0 Vel= 2.48 H.4 2.73 0.0190 0.0 20.000 0.381 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Uponor Page 6 RIVER TERRACE EAST TH -Two Head Calculation (H.7& H.6) Date 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn H.4 0.0 0.671 Utr 2.0 2.000 20.450 to 150.0 0.0 2.000 0.0 T.16 2.73 0.0192 0.0 4.000 0.077 Vel = 2.48 T.16 0.0 0.671 Utr 2.0 1.000 20.527 to 150.0 0.0 2.000 0.0 H.3 2.73 0.0190 0.0 3.000 0.057 Vel = 2.48 H.3 0.0 0.671 Utr 2.0 3.000 20.584 to 150.0 0.0 2.000 0.0 T.15 2.73 0.0192 0.0 5.000 0.096 Vel= 2.48 T.15 0.0 0.671 Utr 2.0 5.000 20.680 to 150.0 Utb 17.0 19.000 0.0 T.14 2.73 0.0191 0.0 24.000 0.458 Vel= 2.48 T.14 1.93 0.862 0.0 14.773 21.138 to 150.0 0.0 0.0 4.331 T.20 4.66 0.0151 0.0 14.773 0.223 Vel= 2.56T.20 -1.70 0.671 Utr 2.0 4.000 25.692 to 150.0 Utb 17.0 19.000 0.0 T.21 2.96 0.0222 0.0 23.000 0.510 Vel= 2.69 T.21 0.0 0.671 Utr 2.0 4.000 26.202 to 150.0 0.0 2.000 0.0 H.9 2.96 0.0222 0.0 6.000 0.133 Vel = 2.69 H.9 0.0 0.671 Utb 17.0 7.000 26.335 to 150.0 0.0 17.000 0.0 T.26 2.96 0.0222 0.0 24.000 0.532 Vel = 2.69 T.26 2.62 0.862 Utr 2.0 21.000 26.867 to 150.0 0.0 2.000 4.331 T.33 5.58 0.0211 0.0 23.000 0.485 Vel= 3.07 T.33 -0.45 0.862 0.0 2.000 31.683 to 150.0 0.0 0.0 0.0 T.32 5.13 0.0180 0.0 2.000 0.036 Vel= 2.82 T.32 0.45 0.862 Utr 2.0 3.000 31.719 to 150.0 0.0 2.000 0.0 T.31 5.58 0.0212 0.0 5.000 0.106 Vel = 3.07 0.0 5.58 31.825 K Factor= 0.99 T.13 1.93 0.671 Utr 2.0 5.000 20.827 to 150.0 0.0 2.000 0.0 H.1 1.93 0.0100 0.0 7.000 0.070 Vel = 1.75 H.1 0.0 0.671 Utb 17.0 7.000 20.897 to 150.0 0.0 17.000 0.0 T.14 1.93 0.0100 0.0 24.000 0.241 Vel = 1.75 0.0 1.93 21.138 K Factor= 0.42 T.20 1.70 0.671 Utb 17.0 6.000 25.692 to 150.0 0.0 17.000 0.0 H.8 1.7 0.0080 0.0 23.000 0.183 Vel= 1.54 H.8 0.0 0.671 Utb 17.0 6.000 25.875 to 150.0 Utr 2.0 19.000 0.0 T.19 1.7 0.0079 0.0 25.000 0.198 Vel= 1.54 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 . Final Calculations - Hazen-Williams Uponor Page 7 RIVER TERRACE EAST TH -Two Head Calculation (H.7 &H.6) Date 12/6/2017 Hyd. Qa Dia. Fitting Pipe Pt Pt ***x*** Notes '"" " Ref. "C" or Ftng's Pe Pv Point Qt Pf/Ft Eqv. Ln. Total Pf Pn T.19 0.62 0.862 Utb 17.0 5.000 26.073 to 150.0 0.0 14.000 0.0 T.18 2.32 0.0042 0.0 19.000 0.080 Vel= 1.28 0.0 2.32 26.153 K Factor= 0.45 T.25 3.24 0.862 Utb 17.0 2.000 25.883 to 150.0 0.0 14.000 0.0 T.27 3.24 0.0077 0.0 16.000 0.123 Vel = 1.78 T.27 -0.63 0.671 Utb 17.0 6.000 26.006 to 150.0 Utr 2.0 19.000 0.0 H.11 2.61 0.0176 0.0 25.000 0.439 Vel= 2.37 H.11 0.0 0.671 0.0 3.000 26.445 to 150.0 0.0 0.0 0.0 T.28 2.61 0.0177 0.0 3.000 0.053 Vel = 2.37 T.28 0.0 0.671 Utr 2.0 2.000 26.498 to 150.0 Utb 17.0 19.000 0.0 T.26 2.61 0.0176 0.0 21.000 0.369 Vel= 2.37 0.0 2.61 26.867 K Factor= 0.50 T.27 0.62 0.671 Utb 17.0 6.000 26.006 to 150.0 0.0 17.000 0.0 T.24 0.62 0.0013 0.0 23.000 0.029 Vel= 0.56 T.24 -0.11 0.671 Utr 2.0 1.000 26.035 to 150.0 0.0 2.000 0.0 T.23 0.51 0.0007 0.0 3.000 0.002 Vel = 0.46 T.23 0.11 0.671 Utr 2.0 10.000 26.037 to 150.0 Utb 17.0 19.000 0.0 T.19 0.62 0.0012 0.0 29.000 0.036 Vel = 0.56 0.0 0.62 26.073 K Factor= 0.12 T.24 0.12 0.671 Utb 17.0 5.000 26.035 to 150.0 0.0 17.000 0.0 H.10 0.12 0.0 0.0 22.000 0.001 Vel= 0.11 H.10 0.0 0.671 Utb 17.0 6.000 26.036 to 150.0 Utr 2.0 19.000 0.0 T.23 0.12 0.0 0.0 25.000 0.001 Vel= 0.11 0.0 0.12 26.037 K Factor= 0.02 T.33 0.44 0.671 Utb 17.0 11.000 31.683 to 150.0 Utr 2.0 19.000 0.0 H.12 0.44 0.0007 0.0 30.000 0.020 Vel= 0.40 H.12 0.0 0.671 Utb 17.0 8.000 31.703 to 150.0 0.0 17.000 0.0 T.32 0.44 0.0006 0.0 25.000 0.016 Vel= 0.40 0.0 0.44 31.719 K Factor= 0.08 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087