Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (41)
ASHERMAN — ENGINEERING 3151 NE SANDY BLVD.,SUITE 100 PORTLAND,OR 97232 � - ( PHONE(503)230-9876 Fila—"1-1-111\ 11-1 SHERAIANENGINEERS.COM MEMORANDUM { #2017-61016,1 To: Mr. Keith Kudrna qlr' sc.) jC��S7" Suntel Design, Inc. 16865 Boones Ferry Rd. PROF Lake Oswego, OR 97035 '� N FF `� �O�y 186 : Date: December 1,2017 �' i r irf. 46 v . - sN From: Don P Sherman,PE ‘1/t1' 0 4 Q? Principal NP SH6¢ , RE: Oak Woods, Lots 4,5,6&7 EXPIRES: 61301 r Tigard, OR This Memo is to inform you of our recommendations for the installation of the framing at the garage floor. We understand the garage floor and slab are supported on three sides by stud pony walls stepping with the grade. The exterior and rear wars have plywood sheathing to help support the lateral load. The wall between the side of the garage and the stairway does not have any sheathing. We recommend adding a minimum length of 8'-0"of full height sheathing to this wall to provide lateral resistance of the garage floor slab. Provide 8d edge nailing at 6" centers and intermediate nailing at 12"centers. If you have any questions, please give us a call. CC: File-Suntel 12-1-17.aoc 0 0 Q I ,ala °�� i i Q Q a Q i L"4`6" L"4` L=4, L.4' it Q 0 i • i it 0 L ----_ /- p Arif) 74"AePr(WW1 ----- k 5 M'? SI-n"cW,t4 ,0 ©.c-. E ieS 10C°61 yaD. •G NOTE: BU L3 TO BE CONTINUOUSLY SHEATHED W/1/16"NAILED W/ed OR = EQUAL W/4"SPACING AT ALL EDGES Q " ' i \a,,4 .4 6 i ''''- D D 0 0