Loading...
Permit (127) INCITY OF TIGARD BUILDING PERMIT 2. . COMMUNITY DEVELOPMENT Permit#: BUP2017-00266 -f[ aA Ft D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/07/2017 Parcel: 1S136CD00100 Jurisdiction: Site address: 11701 SW PACIFIC HWY Project: Starbucks Subdivision: None Lot: None Project Description: TI for new tenant: Facade alterations,and new partition walls and finishes. PRIOR TO OCCUPANCY,APPLICANT SHALL DEMONSTRATE COMPLIANCE WITH WATER QUALITY REQUIREMENTS, IN ACCORDANCE WITH CLEAN WATER SERVICES DESIGN AND CONSTRUCTION STANDARDS. Contractor: EDWARDS CONSTRUCTION GROUP Owner: PACIFIC CROSSROADS PROPERTIES IN 2501 NE 129TH ST BY WYSE INVESTMENT SERVICES CO TIGARD, OR 98686 1501 SW TAYLOR ST STE 100 PORTLAND, OR 97205 PHONE: 360-597-4297 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 11/29/2017 $4,896.25 Demolition Occupancy Grp: A-2 Occupancy Load: 63 12%State Surcharge-Building 11/29/2017 $587.55 Dwelling Units: Plan Review 10/04/2017 $3,182.56 Stories: 1 Height: ft Misc Administration Fee 11/29/2017 $13.00 Bedrooms: Bathrooms: DC Provision Review,COM New-Bldg 11/29/2017 $180.50 Value: $770,000 DC Provision Review,COM New-Ping 11/29/2017 $180.50 Plan Review-Fire Life Safety 11/29/2017 $1,958.50 Info Process/Archiving-Lg$2.00(over 11/29/2017 $186.00 Floor Areas: 11x17) Total Area: 3042 Info Process/Archiving-Sm$0.50(up to 11/29/2017 $12.50 11x17) Accessory Struct: Metro Const.Excise Tax 11/29/2017 $924.00 Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $12,121.36 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, of/if wpfk is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Cy= tof hose rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a •• of the rules or direct questions to OUNC by calli a `03.2. 987• 1.800.332.2344. 1 ,rlf Issued By: cZef02. ...,.s.___ 1 Permittee Signature: I , 503.639.4175 by 7:00 a.m.for the next available inspec !N,. .y / ti This permit card shall be kept in a conspicuous place on the job site until mpletian at the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application •Commercial tw,f k r . FOR()FFICE USE ONLY , - t", a •ccencaCity of Tigard _ 4 , ren„]t Na_: matey /0/ 1 Y (2.4,jt()i —l `zvE" 13125 SW Hall Blvd,Tigard,OR 97223 Plan R aW r� ��_ Phone 503.7182439 Fax: 503.598.1960 "` DatoBI7 (IL 1 t 7 Other Permit: I 5 r , l�W^ Tl CARD Inspection Line: 503.639 4175 J i ' Date Ready y Jens I b7 See Page'z for Internet' www.tigard-or:gov $ .I '.Notified/Method:(21J /17 / /J Supplemental Information TYPE OF W �` t 1{^):i'''''1 r i *t1*"}.,p l REQUIRED DATA:1-AND 2-f'V ILY DwELLLNG 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all i1 Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUC"ftOtq work indicated on this application. $ ❑I-and 2-family dwelling ®Commercialtmdustriat Valuation 0 Accessory building 0 Multi-family Number of bedroms: ❑Master builder 0 Other: Number of bathrooms: ,IUB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 11701 SW PACIFIC HWY New dwelling area: square feet City/State/ZIP: TIGARD OR 97223 Garage/carport area: square feet Sue/bldg./apt no.: Project name: STARBUCKS-PACIFIC&78TH Covered porch area: square feet Cross street/directions to job site: PACIFIC HWY W &SW DARTMOUTH ST. Deck area: square feet ' Other structure area:- square feet REQUIRED DATA:COMMERCIAL-USE CBECXLIST Subdivision Lot no.: Permit fees*are based on the value of the work performed. Indicate the value,(rounded to the nearest dollar)of all Tax mapfparcel no .: 1 S136CD00100 _ equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORE work indicated on this application. i Conversion of the former Arby's into a Starbucks Coffee Shop WI outdoor seating and drive-ihtu facilities. Valuation: S 770,000 Scope of work includes,removal of exterior facade and replaced wI new.Removal of entire interior,replace `wi new partition walls&finishes.New equipment;HVAC&accessible restruoms. Existing building area: 3,071 square feet New building area: 3042 square feet e 0 PROPERTY OWNER 1 al TENANT Number of stories: 1 Name: STARBUCKS COFFEE COMPANY Type of construction: EXISTING-NON SPRINKLED \ Address: 2401 UTAH AVE SOUTH,SUITE 800,MS MD-9 Occupancy groups: City/State ZII': SEATTLE,WA 98134-1435 Existing: A..2 Phone:() Hon t3lanchette Fad: 503-572-4345 New: A-2 I1 APPLICANT a CONTACT PERSON BUILDING PERMIT FEES* LI Business name: GPO ENGINEERING&ARCHITECTURE PROFESSIONAL CORPORATION {Pknserefer fu feschedule► Structural plan review fee(or deposit): Contact name: HALEY BECKER FLS plan review fee(if applicable): c Address: 520 SOUTH MAIN ST.SUITE 520 oA CityfStateIL1P; AKORN,OH 44311 Total fees due upon application: •f3 S Amount received: Phone:(330 )572-3611 Fax::(330 )572-2101 PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E marl: hbeekerBgPd9JP Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. ,Pw Business name: �^ --< ' � Submit two(2)sets ofroof plan with connection details Yom`i—k-7/1/t.) v'''im V24 C t YJ"' and fire department access,along with the 2010 Oregon Address: 2‘-'5C/% ili l "5'Si, Solar Installation Specialty Code checklist. City/State/ZIP: -^ `) q , y� Permit fee(includes plan review $180.00` t / r4 Y✓ and administrative fees): Phone:{ L} 4 .7Fax:( ) State surcharge(12%of permit fee): $21.60 CCB he.. f S jf 7 fv- Total fee due upon application: $201.60 Authorized signature 0.,.. This permit application expires if a permit is not obtained Z.,,.. within 180 days after it has been accepted as complete. Print name:Ron Blanchette Date: 9 * Pee methodology set by Tri-County Building;Industry " Service Board I\Building\Permits'.BUP--CCM PermitApp doc 02/24/2011 4440-4613TO 1/02/COM/WEB) City of Tigard • w COMMUNITY DEVELOPMENT DEPARTMENT C TIGAR3 Building Permit Review — Commercial - With L �- - and Use Building Permit #: �ZiAki 7 --0 (0 Site Address: ii �, - Suite/Bldg#: Project Name: C / (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Propo al: 7 17,,L4) kk.94772— A / r==')(>2e,f2.(9,---r Verify site address/suite# exists and active in permit syste . ll 11 i''ver Terrace Neighborhood: 0 Yes and Use Case#: MNo �� ies)cor - '--L9� 9 1,m MD (-7-Oct Pla Match Approved Land Use:/Landscape Site Plan Plan 1,C)� - her: Alrban Forestry Plan elevation Plan Building Height: Maximum Height `7�/�— ❑ onditions Met: Actual HeightSn 0 Prior to Submittal 0 Prior to Permit Issuance Business Licen Exists: Yes 0 No,applicant notified to obtain business license i4blic Facilities Improvement(PFI)Permit: Required: 0 Yes,applicant was notified Notes: NO Applied Fo : 0 Yes 0 No, stop intake AZDIL_: -I�l di �. 1./ill qS` / / / Approved by Planning: z Date: o Ay Revisions (after Building Submittal only) Revision 1: ❑ A d Reviewer Date Pprove ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Building Permit Submittal Original Submittal Date: it it Site Plans: # Building Plans: # 3 Building Permit#: 7 iter building permit#above. Workflow Routing: ,� .� ❑'P nig ngineering L1'ermit Coordinator ul ding Workflow Sign-off [f].igAff for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ; z _ Date: tc/5 117 1:\Building\Forms\131dgPernutRvw COM_WithLandUse_060116.docx Engineering Review Slope at building pad: 02 -' tFI Permit#: J-( A conditions"Met"prior to is uance of building permit R1 ents (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes E"-No Assess Water Quantity Fee in-lieu: 0 Yes e"No LIDA Facility on lot: 0 Yes l --No 0 NOT Approved by Engineering: Date Notes: , Date: to. - f 1 -t-I /Approved by Engineering: 2.f ./ Kt i 14 El( Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review _ i41 0 Conditions"Met"prior to issuance of building permit B J^ r Uaeki 41 Date: /%/7/ Approved,NOT Released: al 1,� Notes: -voik ' - 11 4 ,7 1 -1 Revisions (after Building Submittal only) q>pnociaRevision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: 0 Yes N/A Tigard Trans SDC: 0 Yes N/A Parks SDC: 0 Yes N/A (OK to Issue Permit Z 0Approved by Permit Coordinator: OINA-064.- Date: I:\BuildingTorms\BldgPernutRvw_COM_W ithIandUse_070915.docx Albert Shields From: Albert Shields Sent: Wednesday, October 11, 2017 10:49 AM To: 'hbecker@gpdgroup.com' Subject: Starbucks, BUP2017-00266 Haley, on reviewing your plans and application for the above permit Planning has noted that before we can issue the permit you must submit an approval letter from Pride Disposal. Accordingly, I have coded this application as Approved but Not Released and it will be on hold until we receive a copy of the Pride letter. Please let me know if you have any questions. Albert Shields Permit Coordinator City of Tigard Albert@tigard-or.gov 503-718-2426 Branden Taggart From: Branden Taggart Sent: Tuesday, December 05, 2017 6:52 PM To: 'hbecker@gpdgroup.com'; 'zac@fasterpermits.com' Cc: #Building Permit Technicians Subject: Permits for Starbucks: 11701 SW Pacific Hwy: BUP2017-00266, SIT2017-00026 Attachments: Branden Taggart.vcf Hello Haley and Zac, The building permit and site work permit for Starbucks located at 11701 SW Pacific Hwy are ready to issue. I am notifying you both because each of these permits were applied for separately; however, our plans examiner combined the site work permit plans with the building permit plans and approved them this way. This means that we will need to have someone pick up all of the plans together at the same time. The fees for each permit have already been paid, but we are missing contractor information,which is needed prior to permit issuance. Upon permit issuance, we have (3) separate site copy plans to pick up for inspections: (1) rolled approved set of plans for the building permit and site work permit, (1) approved set of building permit revisions, and (1) approved set of 11"x 17" site work plans. The plans can be picked up between the hours of 8:00 a.m. and 4:30 p.m., Monday through Thursday. We are closed on Fridays. Zac, after reviewing the site work permit, I was trying to determine if the erosion control fee was necessary considering the scope of work appears to be mostly limited to parking modifications. Can you confirm the square footage of the soil that will be disturbed? We apologize for any inconvenience. Please let us know if you have any questions. Thank you, Branden Taggart 11111 ,q City of Tigard M Permit Technician T Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718 2449 bra nderit tigatd-or.gov 1 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 11701 SW PACIFIC HWY, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00266 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor