PFI2017-00263 r CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12017-00263
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 12/12/2017
Parcel: 2S103AA01702
Jurisdiction: Tigard
Site address: 10770 SW WALNUT ST
Subdivision: ECHO HEIGHTS Lot: 2
Project: Bradea
Project Description: Construction Private LIDA Infiltration Rain Garden with overflow draining to existing weep hole
Owner: FEES
Description Date Amount
PFI Permit Fee 12/11/2017 $300.00
PHONE:
Contractor:
PHONE:
FAX:
Applicant:
BEN BRADEA
10770 SW WALNUT ST
TIGARD, OR 97223
PHONE: 971-506-5592
Total $300.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant r
Signature:
Issued By:
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12017-00263
Type: Condition Name: Status: Severity:
PFI Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PH Sidewalk/[ 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PH Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI Sidewalk/[ 05-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>, to establish a preconstruction meeting.
PFI Sidewalk/[ 06-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit. Call Jonny Gish 971-713-0281 or Jonny@tigard-or.gov
PFI_Sidewalk/[ 07-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI Sidewalk/[ 08-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI Sidewalk/[ 09-OTHER Applied Notice
Conditions for PF12017-00263
Type: Condition Name: Status: Severity:
PFI—Sidewalk/1 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Sidewalk/[ 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material. Obtain City approval of restoration work.
PFI_Sidewalk/[ 05- PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert
Phone#>, to establish a preconstruction meeting.
PFI_Sidewalk/[ 06- NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit. Call Jonny Gish 971-713-0281 or Jonny@tigard-or.gov
PFI_Sidewalk/[ 07-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Sidewalk/[ 08- EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2) persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Sidewalk/[ 09-OTHER Applied Notice
City 0f Tigard REC-'PAVED
,,�
OV 2 � �p17
�
PUBLIC WORKS — ENGINEERING
Public Facility Improvement (PFI)
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way)
❑ TYPE 1—Franchise Utility X�''ork
Check one: ❑ Utilities 0 Sidewalk/driveway approach ❑Street improvemen ts performed by NAL NT, PGE
Detailed description: Adding a weep hole for a LIDA rain garden. and/or utility agency.
The rain garden is on an adjacent property and will have an TYPE 2—Sidewalk/Driveway/Sewer
overflow drain pipe that will daylight via the weep hole. Work performed for the purpose of:
• Sidewalk installation or repair.
-�. ��. C I U3 0 2 • Driveway approach installation
Property address/location(s): J l and/or repair
10770 SW Walnut Street, Tigard OR 97223 • Sanitary sewer lateral installation
and/or mwun line tap
Applicant: Ben Bradea ❑ TYPE 3—Full scale Development
10770 SW Walnut Street Work performed with Land use
Address: approval which includes any of
City/state: Tigard, ORLip; 97223 the following:
971.506.5592 ��' • Subdivisions or Partitions
Phone: � 1{,mail: e,���� t►� �'� � t n��-�,cm
Contact name: Ben Bradea Phone: 971.506.5592 • Streetwidening
—" — - lhiinline installation for Sanitary
Contractor: sewer, Storm sewer, "Tigard water
and/or Tigard Fater Service zVea
CCB#: Expiration:
Address: SUBMIT COMPI.F,TED APPLICATION TO:
City/state: Lip: City of Tigard
Phone: Email: Planning/Engineering
13125 SW Hall Blvd.
Contact name: Phone: Tigard,OR 97223
.applications for"minor work in right-of-way"
Engineer: West Coast Design and Graphics (Designer)- only may be emailed to:
Address: 13740 SW SCholls Ferry Road #104 1
row_permitsC.tigaMd-or.gov
City/state: Beaverton OR lip: 97006 61101
Phone: 503.741.9234 Email:nrotta@wc-dg.com Case No.: f F L Z0 l 4`0 0 2�3
Contact name: Nathaniel Rotta application submittal fee(.07%of
Engineers Estimate) $ 300• 00
Estimated value of work is required(if over$5,000): i�;DO Additional fees: $
(within the public right-of-way) application accepted:
Is work related to a LAND-USE DECISION? ❑ �-cs ❑ No By: S f~' Date:
If so,please specify (MLP,SDR,SUB,etc.) case #: application reviewed:
/17
B ,3 C Date: i Z 11
Is work related to a BUILDING PERMIT? ® Yes ❑ Applicant notified:
If so,please specify (BUILDING PERMIT)case#: 1 \S_TZo l�–� _19j By: Date: 2
I:\ENG\FermitApplications\pfi_application Effective 10116/2017
City of Tigard • 13125 SW Hall Blvd Tigard,Oregon 97223 www:tigud--or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to'IMC 15.441.140.
* X ith the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s)must sigh this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owners signature on the application
BY SIGNING BELOW,THE APPLICANTS) SHALL CERTIFY THAT:
• The -v-=23AUt dQes not=23A, violate n restrictions that LTq-�be attached to or i=osed uVon the subject
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and linnitations of the approval.
• All of the above statements and the statements un any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property, if required.
0-cvner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 1312")SW Hall Blvd. • 'Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEESFOR STAFF USE ONLY
Public Facility Improvement(PFI) Permit:
DETAILED SUBMITTAL
APPLICATION FEE REQUIREMENTS
Part 1: Required submittal fee$300.00
FRANCHISE UTILITY AND SIDEWALK/
PERMIT FEE DRIVEWAYAND UTILITY
Part 2: All non w ater system improvements CONNECTIONS,ETC.
Engineer's estimate X 5%(less$300.00 submittal fee) {work in the might of-vvay)
Engineer's estimate.X 2%Plan Review Sketch
(including information below)
WATER SYSTEM FEE El
Dimensions
Part 3: All public water system improvements 0 Street Name
Engineer's estimate X 12% ❑ Site Address
PFI Permit Fee Exemptions: FULL SCALE DEVELOPMENT
There will be no permit fee charged,or assurance required
napes of work: (Subdivisions/Partitions and Street Improvements)the following
• Sidewalk repair(less than 20 lineal feet)
• Relocate or replace mailbox Design Flans
• Ditch cleaning that does not involve regrading. (U Seg,Zx36 or 2234)
• %Veep hole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.)
• Lawn sprinkler system installation or repair ❑ Street(Plan,Profile)
• Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile)
• Planter strip landscape maintenance ❑ Fater Quality Facilities
• Test wells ❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(F_.lectrical,Phone,Gas,
Note. A cash assurance may be rewired per Storm,Sanitary,Water,Signage,Street Lights,etc)
TMC 15.04.140.(customer deposit) ❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land.use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
El Pathway Design(if applicable)
❑ Water Department:'approval
❑ Engineer's Construction Estimate
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • ww-vutigard-or.gov • 503-718-2421 • Page 3 of 4
SAMPLE SKETCH:
i Edge of F avement
p i -•4--- aitch -
rl Streetlt`igl I�7 It ■!■i ■!■!■i s!■i•!t!■ m
. 11 ffJJ I ~ �
�•j R33c l 1!1 dn
•1 � f't
I i
T—"'Prro15os crSeWer�rine'l'
111� i
i ;r,I Existing House
V1 i Existing
>i Driveway
i
a i rti� I
4
L }. ! I
LL! ; —
�I � r
Existing Shop .
# � r
Powe rpole
I
------_ -.-.-- --.--
np
I F
Jf Fire Hydrant(FH)
I I
I I
Scale-. 'I"=30'
{ i 1
I ■
MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable):
North arrow Property lines &dimension Slope of property
Street &street name(s) Existing building, structures Utiliq &street light poles
Proposed work Existing curb or edge Trees
[-?xisring S/W or of paz-ement Existing utility locations
I.)/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SXt Ha11 I1lvd. ■ ".fiLard,Oregon 91223 • xNvNv.tigard-or.gov • 503-718-2421 • Page 4 of 4
51t KTY Not5
0 PI?OP�PTY LINA, WAL N Uf 5T�
\ MIN. [31,1ILPING 51�TC3ACK PFp
P�V�LOPM�NT COPS, MP NOLO OLIUf: 185,0'
MAX�I.�VATION(V�I,FJ
CUPS CUT TO p�MAIN,
5
0 PPOP051�P 3-I/211 THIICK CONCP�T> 12 9
5112�WALK OVl�I; 411 CI?U51-11�P POCK
e
C3A51� --WALK TO 131� 3'-611 WI121 8
UNL1�55 NOT�P OTKPWI51�,
C�> KIV�WAY ANP PATH -
(D HOUSE
q _-
UTILITY�A51�M%T _
(�) WAT'VpLIN� ANP M�T>r, —�-
,o PPOPO51�P LIPA 5Y5T1;M - INFILTATION —
PLANT�p, WALL5 TO Pl� 611 CONCp\M
WITH 1211 FOOTING,
>> Pf?OPO5�P LIPA MPTLOW PVAIN \ - --
,2 �X15TING LIPA OV�rFLOW PP\AIN
ml�P HOLD
PAIN DUMP,PLAIN Fl��P
OVMAI, ' NGTH 1 \ \
OF 12FAIN;60' \
1 \
1 \
I \.
1 '
5HP,T5(I TOTA.) I /
0 TUFtP HAII?6pA55 C 4) 1
POU6LA5 5PREA(3) 1 /
PLANT5(160) 12
Op�GON IplS C 5�) \\ °.
CAMA5 LILY( 54) • °
\ 0' ' • • TOP OF INFLTP PION FI ANV� 188,8'
COMMON CAMA5 C 54) \ •. I° . . •
P�ANf CAUKION \ i10°°••; fOTOF o oow188,: 185,63'
10'
LIPA A,�A 159 5F ° ' ' •''°
\ . 1 °° O .
s .
PLANT5 Pip 100 5F: o a Pp0 +o*
100&p13AC�01,15 PLANT5 `� *• o
4 5HP\U135 0\1•° •'a '
°p1 . . •
»• �o 1
O
p�OUlt?�P PLANTS: i 01• •v.
160 HFP13AC�OU5 PLANT5 \ •° 1 °
o .I•°•�° ' 1
\ \ O . » •
\ » p 1 1
\ »p.l. ° ° 1
o0000 04'I°*»�o 1
\ \ • o . •
1 l 1
I 14 1 } 1
I /
I I 1 1 1
l
I /
U
\ 1
NLAF,02 51TE PLAN -I'-01 - 1/8"
LOT APIA XA C&CIA10N5
LOT AI\TA: 20,560 5P NSW IMPFP\VIOU5 AV? A, 5,583 5F
NSW�UILPING COV���: 3.979 5F LIPA MAX Ap�A FOp CALCI 2,60 5F
CONTOUp P�pC�NT COV���; 19,3% LIPA 51ZIN6 FACTOp: 0,06
U1LITY S�pVIC� 1 45TING IMP�VVI0U5 APIA, 2,540 5F LIPA AI\�A: 159 5F
Wm° WAT�p M�T�P\ NSW IMPUVI01,15 AI\TA: 5,583 5F ----- — PS. LINA
EPS' POLE TOTAL IMP�PVIOU5 AM\ A: 7,923 5F
M5T COA5T P�5161\1 & C4MHIC5, LLC C3AP�A PF5IP�NC� LIPA ENLAPUP 51t PLAN 1206 17
CfMF\TON, Op 97006 10770 5W WALNUT 5TP\��T
P: 50�)-741-9234 fCAPR OP1�60N 97223
�: nroUa@wc-d ,com W: www,wc-d ,com P: 971,506,5592
51T� KAY NOT�5 6�NFM INFOrMKION
0 PrIOM\TY LINA, I2I?IVWY OWp; P�NJAMIN PWS A
0 MIN, r�UILPING 5N3ACK FBF\ PMLOPM�NT HOU5� Annf?�55 10770 5W WALNUT 5TF\��T
COn�, Tl?� 11GARR Op�GON 97223
0 (�) CUFP CUT TO VWAIN, >> (I?) TF�� TO[3� f?WMP TAX LOT IV 251OW01702
0 �-I/ 2'' THIICK CONCI?�T� 5112M,K OM\ 12 NW A5FHkT npIVWY
4'' CpUSN�n POCK C3A5� --WALK TO C3� ,3 UTILITY�AS�M�NT pt?O��t?TY In; p969521
3'-6" Wln� UNL�55 NOTEn OTN��WIS�, 14 C�> WAT�p LINA AW M�T�p ppOt'�p11'CLA551�ICATION; 1010 p�51n�N11AL IMppOV�n
0 C F) WAV ,5 C�) 5mr, N�IGNC30I?I-1OOn COn� WTI CA
0 (�) �L�CTFICAL POLE & OVWHA? ,6 C�> 5TOI?M PLAIN LEGAL; ECHO NFIGNT5 LOT 1 & 2
17 LIDA 5Y51�M - INFILTRATION PI ANT�k LOT 51Z�; ,97 ACFF5
�L�C1I�ICAL & COMMUNICATION S�pVIC�, 18 1,112A OV�p�LOW WAIN USS; WASHINGTON
0 pAT10 -- 3-I/ 2 CONCp�1� PAP OV�p 411 19 LInA OV�pFLOW WAIN MPHOLD MAp NUMC3fp; 25103AA-01702
CpUSH�n POCK C3A5�, COOpnINA1� �IN15H
WITH OWI? PplOp TO 5�T11 NG PAI? OF16INAL 5F: 1,057 5F
�VATION ARATION 5F, 2,300 5F
NSW TOTAL 5r; 3,357 5F
_----RAIN DRAIN AND OUTFALL PROTECTION pLAN�" L�G�Nb
--BUILDING OFFSET AND IMPERMEABLE
LINER AS APPROVED BY BUILDING / nI
JURISDICTION 5HPU[35 C 7 TOT/"V.)
��-STRL!CTURAL WALL PER BUILDING
JURISDICTION TUFtI2 HAII?6I?A55(9)
A
L 1201,161_A5 5PIP\tA C�)
0
FAC!LI_T Y OVERFLOW TO CONVEYANCE PLANT5(160)
6' _ r
2" N41N FREEBOARD 69II.? ?
6" MAX POND DEPTH 6 /
R" MIN GROWING MEDIUIv"
CAMA5 LILY(59) 81 wALNur
-� DEEP (3/4" - /4") CLAN COMMON CAMA5 C 59)
��'• CRUSHED DRAIN ROCK
i M
DEEP (1-1/2" - 3/4") CLEA . p
RUSHED DRAIN ROCK I LMf C&CI ION
1 OVERFLOW TO CONVEYANCE LVA AffA' 159 5f
,zo SECTION A_A —NON-WOVEN GEOTEXTILE FILTER
FABRIC CONFORMING TO OGOT TYPE 11
VARIATION QF? APPROVED EQUAL
FOUNDATION DRAIN PI ANT5 PW 100 5f; I ��
1..PRIVATE WATER QUALITY TREATMENT 100 HI P,13ACf 01,15 PLANT5 13'681
2.30'MIN WIDTH-FACILITY LENGTH TO BE CALCULATED BASED ON INCOMING FLOWS.
3.VEGETATION: SEE PLANT LIST IN LIDA HANDBOOK. JF ir\UG�S p�
-- -- —
4.NO TREES OR DEEP ROOTED VEGETATION OVER PIPING.
5.RAIN DRAINS AND OVERFLOW TO MAINTAIN MAXIMUM LINEAR SEPARATION.
6.OUTFALL PROTECTION SIZED PER FLOW CALCULATIONS. GG III���� pLANTs,
7.BUILDING JURISDICTION APPROVAL REQUIRED WHEN DEPTH OF FACILITY IS BELOW pLOUIr\ I '
;.
BUILDING FOOTING.
160 H�F3AC�OU5 PI ANT5
`=� 5HPUC35
_C10
AWING N0.793 _L REVISED 03-16 �Yr� .7Giv�`i I ' I (I\\ .:•., ,
STORMWATER FACILITY BLENDED SOIL
FURNISH IMPORTED BLENDED SOIL FOR ALL VEGETATED LIDA FACILITIES CONFORMING TO THE FOLLOWING: 1�
GENERAL COMPOSITION-USE MATERIAL THAT IS ANY BLEND OF LOAMY SOIL SAND,AND COMPOST THAT IS 30-40%COMPOST(BY VOLUME)AND MEETS THE OTHER CRITERIA IN THIS SPECIFICATION.
ANALYSIS REQUIREMENTS FOR THE BLENDED MATERIAL: ` 8
PARTICLE GRADATION-A SIEVE ANALYSIS OF THE BLENDED MATERIAL,INCLUDING COMPOST,SHALL BE CONDUCTED IN CONFORMANCE WITH ASTM C117/C136,AASHTO Til/T27,ASTM D422/Di140,OR ASTM v !
D6913.THE ANALYSIS SHALL INCLUDE THE FOLLOWING SIEVE SIZES:1 INCH,3/8 INCH,#4,#10,#20,#40,#60,#100,1200.THE GRADATION OF THE BLEND SHALL MEET THE FOLLOWING GRADATION CRITERIA. f (\
SIEVE SIZE PERCENT PASSING \
1 INCH 100
#4 75-100 \
#10 40-100
If 40 15-50
#100 5-25 12
#200 5-15
THE MATERIAL SHALL BE LOOSE AND EASILY BROKEN INTO SMALL PIECES
IT SHALL BE WELL MIXED AND HOMOGENOUS. q 26'-1
IT SHALL BE FREE OF WOOD PIECES,PLASTIC,AND OTHER FOREIGN MATTER. 8 o /
IT SHALL HAVE NO VISIBLE FREE WATER.
COMPOST CONSTRUCTION
THE COMPOST SHALL BE DERIVED FROM PLANT MATERIAL AND PROVIDED BY A MEMBER OF THE US STORMWATER FACILITY BLENDED SOIL:
COMPOSTING COUNCIL SEAL OF TESTING ASSURANCE(STA)PROGRAM.SEE PROTECTION OF THE 501E-THE MATERIAL SHALL BE PROTECTED FROM ALL SOURCES OF N I
WWW.COMPOSTING000NCILORG FOR A LIST OF LOCAL PROVIDERS. CONTAMINATION,INCLUDING WEED SEEDS,WHILE AT THE SUPPLIER,IN CONVEYANCE,AND AT THE
PROJECT SITE.
THE COMPOST SHALL BE THE RESULT OF THE BIOLOGICAL DEGRADATION AND TRANSFORMATION OF WET AND WINTER CONDITIONS-HAULING AND PLACEMENT OF THE MATERIAL WILL NOT BE ✓ // / / / /
PLANT-DERIVED MATERIALS UNDER CONDITIONS DESIGNED TO PROMOTE AEROBIC DECOMPOSITION.THE ALLOWED WHEN THE WEATHER IS TOO WET OR THE GROUND IS FROZEN OR SATURATED AS �I
MATERIAL SHALL BE WELL COMPOSTED,FREE OF VIABLE WEED SEEDS,AND STABLE WITH REGARD TO DETERMINED BY THE OWNERS REPRESENTATIVE.
OXYGEN CONSUMPTION AND CARBON DIOXIDE GENERATION.THE COMPOST SHALL HAVE NO VISIBLE PLACEMENT OF THE SOIL-PLACE THE MATERIAL IN LOOSE LIFTS,NOT TO EXCEED 8 INCHES EACH
FREE WATER AND PRODUCE NO DUST WHEN HANDLED.IT SHALL MEET THE FOLLOWING CRITERIA,AS AND EACH LIFT SHALL BE COMPACTED WITH A WATER-FILLED LANDSCAPE ROLLER.DO NOT
REPORTED BY THE US COMPOSTING COUNCIL STA COMPOST TECHNICAL DATA SHEET PROVIDED BY OTHER ISE MECHANICALLY
LAICALLY COMPACTTHE
MATERIAL ERMTTING AND A5 APPROVED INSTALL PLANTS AS
E VENDOR.
100%OF THE MATERIAL MUST PASS THROUGH A 1/2-INCH SCREEN. SOON AS POSSIBLE AFTER PLACING AND GRADING THE SOIL IN ORDER TO MINIMIZE EROSION AND
FURTHER COMPACTION. 6'-14" 29' 9'- III /
THE PH OF THE MATERIAL SHALL BE BETWEEN 6 MIN.AND 8.5 MAX. /
MANUFACTURED INERT MATERIAL(PLASTIC,CONCRETE,CERAMICS,METAL,ETC.)SHALL BE LESS EROSION CONTROL-TEMPORARY EROSION CONTROL MEASURES ARE REQUIRED UNTIL PERMANENT
THAN 1.0%BY WEIGHT. STABILIZATION MEASURES ARE FUNCTIONAL. ) /
THE ORGANIC MATTER CONTENT SHALL BE BETWEEN 30 AND 70%(DRY WEIGHT BASIS). PROTECTION OF THE INSTALLED SOIL-IN ALL CASES,THE PROTECT INSTALLED MATERIAL FROM
SOLUBLE SALT CONTENT SHALL BE LESS THAN 6.0 MMHOS/CM. FOOT OR EQUIPMENT TRAFFIC AND SURFACE WATER RUNOFF.INSTALL TEMPORARY FENCING OR
MATURITY INDICATOR SHALL BE GREATER THAN 80%FOR GERMINATION AND VIGOR. WALKWAYS AS NEEDED TO KEEP WORKERS,PEDESTRIANS,AND EQUIPMENT OUT OF THE AREA. r
STABILITY SHALL BE'STABLE'TO'VERY STABLE'. UNDER NO CIRCUMSTANCES SHOULD MATERIALS AND EQUIPMENT BE STORED ON TOP OF THE rLOop kWT10186
INSTALLATION AREA. 8i /
CARBON/NITROGEN(C/N)RATIO SHALL BE LESS THAN 25:1.
TRACE METALS TEST RESULT='PASS.'
DRAWING N0. 798 -- 06-16 VICdIIVam ►70IY=
NSW IWFVIOU5 Ap�A; 5,583 5F
L
IPA MAX AVIA, 2,640 5F
XA 51ZIN6 FACTOF: 0,06 L
L VA AF�A; 159 5F
_._._....... n,5, LINA
I
LOT AFEA; 20,560 5F
NSW C31,1ILnING COVF�: -5,979 5F
— 511� CONTOUp � 8„
pFFC�NTCOV���; 19,x/
UTILITY 5�I?VIC� �45TING IMKP.VIOU5 Ap�A 2,390 5F
Wm WAtF M�T�,I, NSW IWFVIOU5 Ap�A; 5,583 5F 0
EPS �L�CTpICAL FOLD TOTAL IWI?VIOU5 Ap�A; 7,92-5 5F 51T�PLAN -I'-o" = 1/!52''
M5T COA5T n�516N & G WHIC5, LLC C3AP�A F�51n�NC� 12,06.17
C3WA P,TON OF,97006 10770 5W WALNUT 5TP,��T LInA SITE ALAN
P: 503-791-9239 116Apn, Ok�60N 9722
�; nrotta@wc-d ,com W; www,wc-d ,com I F; 971,506,5592