Loading...
Report ROWELL ENGINEERING, LLC Building Relationships,Engineering Solutions November 9, 2017 vl -707L, �Crt PROJECT: Mascord Plan 2223AI — Four D Construction Greensward South - Lot 11 Tigard, OR 97224 SUBJECT: Missing 3x Plate at Garage Door Shearwalls Lateral Engineering It has been reported to me that the sill plate of the "D/7" shearwalls specified adjacent to the Garage door were constructed with 2x material instead of the specified 3x material. Additional 2x blocking is to be added on top of the existing 2x sill plate. The new 2x blocking is to be fastened to the existing top plate with 10d nails at 3 inches on center staggered. The interior sheathing is to be edge nailed to the top 2x blocking instead of the sill plate, to reduce the risk of splitting the sill plate. Questions regarding this letter are to be addressed to me. Regards, PR pFFSS �5 �GINF 5 67 9 Todd Rowell P.E. Rowell Engineering, LLC 0 EGO 503-254-6292 x23 toddr@rowelleng.com T. EXPIRES: DEC.31, RowellEngineenn503.254.6292 toddy�'rowelleng.corrE 10570 S ,hington St. 9 STE 212 - Portland, OR 97216