Report (30) CARLSON TESTING, INC. Tigard Office(Main) ❑ Salem Branch Office D Bend Branch Office
INCOMPLETE ITEMS LIST (NGL) P.O Box 23814 4060 Hudson Avenue, NE P.O. Box 7918
gat; ;,; ,< Tigard, OR 97223 Salem,OR 97301 Bend, OR 97708
Phone: (503) 684-3460 Phone: (503)589-1252 Phone:(541)330-9155
Fax: (503)684-0954 Fax: (503)589-1309 Fax:(541)330-9163
Project Name: �.,�.�, �,"I �, ` rr:� r r, � - '
Project Address: ti_s
Building Permit#: his - � f u4'va - Date:
CTI Job #:
Item Insp. Today's
Signed off Date
# Initials Date
Item Description Compliance by Initials Corrected
„ a'r` i
i
1
( l
•
v,
v t
< ' a
lern1S:
zcsthat construction observation andipr testing services provided by ICH arc techniques
hitch redi Me the risk of construction defects,deficiencies,or omissions arising during ol Utter COP-
!,,Cf viCC:,performed by CII do not constitute a warranty or guarantee of any tvpe. liven
tangent ikonstriin 1"201.1iti)riq andtor testing hy C Ff. construction defects.deficiencies,or omissit7us
in the Cocoaclodsvital< can:exist. In all cases.Client andior the Contractor shall astigni the Contractoi
Cr responsibility foe the quality and completeness of the work and Cr adhering to plans and spcciticc
ms I ds giirk or failure to perforlin sante shall no in an' seas excuse any contractor,sulaigmtractort
sitriplier fri n retIdaof its work in ageordange wall the contract documents.
I will pens ide its professional services to Client\Alai that degree of care and skill ordinarily mimicked
under similar circumstances hr members of its profession.Ibis representation is in lieu of other sr at
tori representation.either cape essed or impliedit is also understood and agreed that statements inude
in C I seer of r are ObSCP,aiion:-; based on technical judgements,and should not tie construed It, he con-
clusive representations raCt. If conditions different front what are indicated in the reports cormi
10
Client's aitention after receipt oldie reports. it is recommended that Client contact bi i imariediumit, to
itipitimargp obi her appropritab evaluation.
Gridstork scull lag nimittde determining,supervising or implementing the means,medgids.tecimiques,
sequeilees,orirgottechares of construction.CH shall not be responsible Cr evaluating or rcporting job con-
ditions related to health,safety or gelfare.