Loading...
Report (11) ,` r zof7-tv S X1,3 Scv �r� 6975 SW SANDBURG ST#160 + TIGARD,OR 97223 CP) STRUCTURAL,Li_C (971)371-1958 SPECIAL INSPECTION—FINAL SUMMARY LETTER November 3, 2017 Mr. Mark Van Domelen City of Tigard, Building Department 13125 SW Hall Blvd. Tigard, OR 97223 RE: Schultz Residence Underpinning 8493 SW Bonaventure Ln. Tigard, OR 97224 Permit# MST2017-00395 Dear Mr. Van Domelen, This letter certifies that we have performed special inspection of the referenced project, in accordance with Chapter 17 of the International Building Code. Special inspection has been performed on (4) helical piers and (4)helical ground anchor, as shown on the permit documents. On Nov. 3rd 2017, a representative of i.e.Structural observed the installation of(4)Foundation Supportwork Incorporated model HP288 helical piers, as shown on structural drawings. All helical piers reached or exceeded the specified installation pressure and the minimum penetration depth specified on structural drawings. Load testing was performed on piers (1) and (3) in accordance with ASTM method D1143(Quick Method), and passed the creep acceptance criteria. i.e. Structural has reviewed the installation logs of the remaining piers and confirmed them to be acceptable. Special inspections have been provided to meet the requirements of the building code and do not constitute a guarantee of the installed work. It is the responsibility of the contractor to execute the work in accordance with the structural drawings. If you have any questions or need further information,please call me. Sincerely PRO C7fit r7 Scott Stambaugh ,; Inspector ro ,Y7 vkv t xrr' - �' (