Report (58) 6U,d0/7 -.(60. /
7O2Sw (kr/its
;.- ' ARCHITECTS
Date: August 25, 2017
SEP 0t3 2017
UTV OPIGAR
Premier Remodeling & Design
1725 Commercial St. SE
Salem, Oregon 97302
RE: Architects Supplemental Instructions #1
Please see the Architectural Supplemental Instructions#1 for revisions and description of
changes. The revisions consist of modifications to the drawings initially dated April 5, 2017.
The attached drawings cover modifications to existing construction required by the changes in
scope.
If you have any questions or need further clarification please contact me.
Thank you,
Kirk Sund, AIA, LEED AP
Enc.
1. Architectural Supplemental Instructions #1
2. ASI form #1
3. Drawings: Sheets A0.10, A0.20, A1.00, A1.10, A2.00, A4.00.
CB I Two Architects LLC I 500 Liberty St SE Suite 100 Salem,Oregon 97301 P:503 480-8700 cbtwoarchitects.com
AVOARCHITECTS
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
PROJECT: ASI NO.: 1
Madrona Recovery Center— Building A
7000 SW Varns Street OWNER X
Tigard, Oregon ARCHITECT X
CONSULTANT
OWNER: DATE OF ISSUANCE: 08/25/17 CONTRACTOR X
Madrona Recovery Center Inc. FIELD
1566 SE Linn Street OTHER
Portland, Oregon ARCHITECT'S PROJECT NO.: n/a
FROM ARCHITECT: TO CONTRACTOR:
CB Two Architects, LLC Premier Remodeling & Design
500 Liberty Street SE, Suite 100 1725 Commercial St. SE
Salem, Oregon 97301 Salem, Oregon 97302
The Work shall be carried out in accordance with the following supplemental instructions issued in
accordance with the Contract Documents. The Architect is not taking on the responsibility of
determining whether these supplemental instructions impact Contract Sum or Contract Time.
Contractor is responsible for issuing supplemental instructions to all subcontractors and
determining if changes require adjustment to Contract Sum or Contract Time. If adjustments are
required, they shall be presented as a proposal request outlined with the Contract Documents.
DESCRIPTION:
See attached ASI Description Letter.
ATTACHMENTS:
• ASI #1 Description Letter
• ASI #1 Instructions
1. Drawings: Sheets A0.10, A0.20, A1.00, A1.10, A2.00, A4.00.
ISSUED BY THE ARCHITECT:
Kirk Sund, AIA, LEED AP
(Signature) 6 (Printed Name and Title)
CB Two Architects LLC I 500 Liberty St SE Suite 100 Salem,Oregon 97301 P:503 480-8700 cbtwoarchitects.com
•
TNIARCHITECTS
Architects Supplemental Instructions #1
The following are clarifications to the permit drawing set, initially dated 04/05/17.
Based on Owner requests and discoveries made during the demolition and construction
process thus far, the following revisions, clarifications and additional information is required:
Architectural:
Sheets A0.10, A0.20, A1.00, A1.10, A2.00, A4.00:
• A0.10 — Modified graphical representation of Corridor N129, and existing alcove
in Corridor N131 to match design intent.
• A0.20 — Modified notes on wall assemblies C and D, to clarify fire partition rating
compliance based on existing conditions.
• A1.00 — Modified perimeter fence design.
• A1.00 — Modified parking layout.
• A1.00 — New ramp to building entry removed. Existing ramp to be repurposed
to serve as accessible path to and from building.
• A1.00 — Modified accessible parking detail 3/A1.00.
• A1.00 —Added perimeter fence gate detail (6/A1.00).
• A1.10 — Exterior door in south wall of building to remain, not be replaced.
• A1.10 — Deck railing at front entry to remain, and not be modified for new ramp,
which has been removed from project.
• A1.10 — Sliding patio door in the west wall of the dining room to remain, not be
replaced.
• A2.00 — Exterior door in south wall of building to remain, not be replaced.
• A2.00 — Sliding patio door in the west wall of the dining room to remain, not be
replaced.
• A4.00 —Window 'D' deleted from project (existing sliding patio door to remain).
• A4.00 — Door N129 deleted from project (existing door to remain).
End of ASI #1
CB I Two Architects LLC I 500 Liberty St SE Suite 100 Salem,Oregon 97301 P.503 480-8700 cbtwoarchitects.com
FOR OFFICE USE ONLY–SITE ADDRESS: _7000 S (-) VaK' s
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
III
_ Transmittal Letter
1 G n 1i n 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: +, ti , ���i6 \ DATE44 12 `"Fill
DEPT: BUILDING DIVISION
SEP 06 20
0
,,I TY IGARD
FROM: 6.(cL, �-�j'�1J�, CI
COMPANY: (7/ [/l) Iry ,Li-(-EJ I 3
AS/
PHONE: ( e5 ) 4
4 0 " C��� B
v 45-77
RE: 7E. %- =< VA X05 ', ,° n -ov og` i
ite . '•ress f?-- --4A)J
6(4A--
(Permit Number)
"
AU W)-
( roP ject name or subdivision name and lot numb• )
ATTACHED ARE THE FOLLOWING ITEMS: A\
Copies: Description: d pies: Descriptions
via_15- -`.SS yuL c .
Additional set(s) of plans. 2 Revisions: At xy-5 „ S , -,
Cross section(s) and details. Wall bracing and/or lateral analyis. 6(^-`-'nL'
Floor/roof framing. k r • r- Basement and retaining walls. l \'( )
Beam calculations. J 1` Engineer's calculations. ��t- �,--
Other(explain): ) aoov-
REMARKS:
FORFFI E USE ONLY
Routed to Permit Tec Pi cian: Date: ' i'1�� Initia.: .
Fees Due: ❑ Yes It lo Fee Description: Amount s ue:
$
$
$
$
Special
Instru ons:
R- . nt Permit(per PE): ❑ Yes ❑No ❑ Done
pplicant Notified: 9-ej____ Date: '10.0//7 Initials:
I:\Building\Forms\TransmittalLetter-Revisions_061316.doc