Loading...
Permit (62) BUILDING PERMIT CITY OF TIGARD + Permit#: BUP2017-00265 III 11,: ' COMMUNITY DEVELOPMENT Date Issued: 11/06/2017 -ftGt, REj 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101DA00102 Jurisdiction: Tigard Site address: 13221 SW 68TH PKWY 500 None Lot: None Project: Centene Corporation Subdivision: Project Description: TI for new tenant:New walls,doors,partitions,and suspended ceiling repairs for same tenant in suites 500 and 520. Contractor: RUSSELL CONSTRUCTION INC Owner: GK TRIANGLE CORPORATE PARK III L 20915 SW 105TH AVE ATTN KBS REALTY ADVISORS TUALATIN, OR 97062 P 0 BOX 28270 SANTA ANA, CA 92709 PHONE: PHONE: 503-692-9002 FAX: 503-692-9008 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 11/06/2017 $3,776.45 Class of Work: ALT Type of Const: IIB Demolition Occupancy Grp: B Occupancy Load: 245 12%State Surcharge-Building 11/06/2017 $453.17 Dwelling Units: 0 Plan Review 10/03/2017 $2,454.69 Stories: 5 Height: 0 ft DC Provision Review,COM TI-Ping 11/06/2017 $361.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 11/06/2017 $1,510.58 Value: $550,000 Info Process/Archiving-Lg$2.00(over 11/06/2017 $66.00 11x17) 11/06/2017 $660.00 Metro Const.Excise Tax Floor Areas: Additional Plan Review 11/06/2017 $200.00 Total Area: 12689 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $9,481.89 Required Items and Reports(Conditions) Required: Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Cent- .or 1Those3 e rules4 are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may•% -in a copy of the rules or direct questions to OUNC by calling 503.232. jr Issued By: ,/ ermi ee e:,e r �/ .AML..1. Ar� Id///ice � "��l Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. B>' lding Permit Application - Commercial FOR OFFICE CSF:ON 1.1 City of Tigard Received 13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: j? ::' '° ' coi■ Ph551960 * I� Plan Revi l i c,A R n Inspection Line: 503.639.4175 III Permit: Internet: www ti azd or ov � nn{ Date Ready/ y: " Jam" la See Page 2 for elemental Information g g 0 C 1_11 1 No'ied/Method• / I u en ormation "ti. ' ' 4 TYPE OF.WOR 4I "n UIRE`DDAT ,. ,. �t 1 ��, � , ' �Qd,..k. x,,.„-: A.1-AND 2�AMILY DW�ING 0 New construction ❑Deifitlon Permit fees*are based on the value of the work performed. El Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement 0 Otherequipment,materials,labor,overhead,and the profit for the CATI ORY :1.=', work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: g ElAccessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: " JOB SITE INMRMATION AND LOCATION :n Total number of floors: Job site address:13221 SW 6801 Parkway, New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:500+520 Project name:Centene Corp Covered porch area: square feet Cross street/directions to job site:Sw 66th Ave Deck area: square feet near intersection of I-5 and Beaverton-Tigard Hwy Other structure area: square feet D OATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S101DA00102 Indicate the value(rounded to the nearest dollar)of all ,.. equipment,materials,labor,overhead,and the profit for the ,DESCRIPTION OF" � work indicated on this application. "_. Demolition of non-load bearing interior partitions,doors,elect. New walls, pation: $550,000.00 I s suspended ceiling repairs, fight fixture relocation,;;;;;;;;;" — acles,cabinets Existing building area: 13313 square feet I relocation of lire sprinklers,have ducting. ew sp i sys em cooling @ Server �- ` New building area: 0 square feet Number of stories: ] Name:Centene Corporation Type of construction: II-A Address:7700 Forsyth Blvd. y (Facilities) Occupancy groups: R City/State/ZIP:St.Louis,MO 63105 Existing: B Phone:(314)349-8842 Fax:(S(4.) S-24.24- .i New: B APPLICANT , El CONTACT PERSON ;, u BUILDING PERMIT FEES* .. Business name:HDL Design Architects (Pleeaere/ersoftie aehedrrk) Contact name:Heather Larsen Structural plan review fee(or deposit): Address:1410 Glen View Court FLS plan review fee(if applicable): City/State/ZIP:Roseville,CA 95747 Total fees due upon application: 4154:Cog Phone:(916)773-6758 Fax::(916)773-2875 Amount received: E-mail:heather@hdlaia.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:TBD Submit two(2)sets of roof plan with connection details Address: and fire department access,along with the 2010 Oregon Solar Installation Specialty Code checklist. City/State/ZIP: Permit fee(includes plan review Phone:( ) Fax:( ) and administrative fees): $180.00 State surcharge(12%of permit fee): $21.60 CCB lic.: Total fee due upon application: $201.60 Authorized signature: -,i 0 This permit application expires if a permit is not obtained ��/� kt __' within 180 days after it has been accepted as complete. I Print name:Heather Larsen I Date:09-28-2017 I * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Pemvts\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) A... :I Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 500,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 125,000 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [21 of Valuation Computation): $ T® BE OE rrrrZM/Aleip vPo v Mt/torte-nod OF fi p 5.4R z' ' /4x - WEEK. P,e'v/Ary Poem eAurA-riotil 1-( og LEt - or Fu[ � d oM P(-M i( . 17) P ,14-01 J 14 PeR L'NveAvOAl X/174 D•I'nl NE4-5oA1 ont 9-27-17. ----ried,?1,6e4 t_itrie I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 City of Tigard e COMMUNITY DEVELOPMENT DEPARTMENT Ill ■ Building Permit Review — Commercial - No Land Use TIGARD 0. Building Permit #: Wabi 7 _( 7(.,5 Site Address: /j ) ,Ji.j 6-sliet-tv_ Suite/Bldg#: , C 502 ' Project Name: ( +�'�'ve_ (crpC -hu,J (Name of commercial busme.s occupying the space. I f vacant,enter Spec Space.) Planning Review Proposal: i Existing Business Activity: VI►)(,Y Proposed Business Activity: L1 0 e cAp f%1111 L' Verify site address/suite# exists and active in permit system. River Terrace Nei hborhood: ❑ Yes N.11--No fi- Zoning: a.& N4Permitted Use: Yes ❑ No ❑ Spec Space Confirm no land use required. Business License: )4. Exists: 'Yes ❑ No,applicant notified to obtain business license Notes: Approved byPlanning: ) OC',t lLL Date: 10S' 17 PP Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal �` Original Submittal Date: Id/Vi 7 Site Plans: # Building Plans: # 3 Building Permit#: nter building permit#above. Workflow Routing: tanning ermit Coordinator i---- g Workflow Sign-off: ij.-off for Planning(include notes from planning review) Route Application Documents: L t uilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: / '- Date: /6/4/7 l:\Building\Fonns\B1dgPennitRvw_COM_NoLandUse_070915.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: 74DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes i N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: E Yes N/A II OK to Issue Permit Approved by Permit Coordinator: /0/iVi --- Date: I:\BuildingTonns\B1dgPennitRvw_COM_NoLandUse 070915.docx IIIDIL Design • Architecture & Interiors ■ Letter of Transmittal To: Cltci Of Tt onRp -8 Date: pq -/7 Address: Regarding: egAir E. r City: HDL Job Number: CeoUposF- Attention: DAN/VE/f,0 Via: 0 Mail ) Courier 0 Blueprinter 0 Pick Up 0 Fax Number: Total Pages: We are sending you: Herewith 0 Originals 0 Specs 0 Samples 0 Under Separate Cover Prints 0 Shope Cover > lar For Your: 0 Use 0 Record 'Approval XReview& 0 Distribution to Comment others E,T5 Coxi5T1eUG-T1dxi PDeum.6 fi— l'/A cJt. DNe ,x—'r- 6/ A.J �e-r) Po/e PLA-/J f Ev/EGJ 1 IrPPt!eol-noiV G-ffmCK_ aPL049-1 $f4'/EW rSES If enclosures above are not received,please notify us at once. HD tha <'u hite c.c. B : A! i.s,if, ,der d/Lbrat.,....._ 1410 Glen View Court,Roseville, CA 95747 • (916)773-6758 ■ Fax(915)773-0518 • heather@hdlaia.com • hdlaia@aol.com City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 13221 SW 68TH PKWY 500, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00265 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor