Loading...
Report (52) APOALr = 7409 SW Tech Center Dr,Ste.145 Tigard,OR 97223 4110%CAM OILS Ph:503-443-3799 Fax:503-620-2748 IIBTL\l:.IV( 503.443.3799 Special Inspection Final Report Date: 5-24-17 Job# 16-6497 Permit#BUP2015-0363 Mail To: Project: Keller Holland Tigard Investors, LLC Tigard 1111 Main Street,Suite 700 9 Apartments Vancouver,WA 98660 13295 SW Hawks Beard Street Tigard,OR 97223 Building 3 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspections)were performed For the following: Wood Construction Anchors—Cast in Place Anchors—Expansion Reinforced Concrete Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. NO(dA '" Approved by: Bob Brown/President BB/sa 0.A.. Proud to be Nationally Accredited by International Accrediting Service ACCREDITED F R O E LI C H ENGINEERS € Structural - Final Summary Letter Client: LRS Architects Job Name: Scholls Ferry Apartments—Building 3 FE Job#: 15-T084 6/1/17 LRS Architects 720 NW Davis Suite 300 Portland, OR 97209 RE: Scholls Ferry Apartments—Building 3 13295 SW Hawks Beard Street Tigard, OR 97223 Permit No. BUP2015-00363 FE Job#: 15-T084 This letter is to confirm that Froelich Engineers, Inc. has performed Structural Observations of the Scholls Ferry Apartments—Building 3 in accordance with Section 1710 of the 2012 International Building Code. We have reviewed the Special Inspection reports in addition to the Final Summary Letter dated May 24, 2017 by ACS Testing, Inc.To the best of our knowledge,the construction of the structural portions of this building is in conformance with the approved construction documents and there are no outstanding structural items to complete. Please feel free to contact our office if you have any questions. Sincerely, Faramarz Dean Azimi, PE, SE RUCTUN' L 04r~aIFJfi�,?"<", (. 1542 ce Wet, ✓Q EGON 'P 440'25 —VP IA,QRZ ( 11' [EXPIRES: 43112co17 1 Attachments:ACS Testing, Inc. Final Summary Report Cc: File A Central Oregon 6 Main Office 745 NW Mt.Washington Dr.#205 6969 Sd,Hamo9 Bend,Oregon 97701 Portland,Oregonn 97223 541-383-1828 503-603-6244-7005 www.froelich-engineers.com