Daily Report of Proprietary Anchors
Project: ,i"_: %4,,u,,, --. -r<t< i'}-1,'" -,k. ii-r .7c'., < ,- - L_-4 N
Address: - -? s ti. y=de CTI Job#: 7; 7.,)f .�k.
i �� � , AV f�.lr,yr
f;r
CTI representative i , , .'-"i,-i'::. '' 'Y was on site this date - -)..7 Y,./L to perform
(Inspector Name&Cert.No.) ff
/
Special Inspection for 111 permit El DFS#(s) --/;c.._-- _,ur - c:-fi3 u t�> jurisdiction Ty a,.1 ,
In some cases more than one box may be checked for a given item.
SCOPE OF INSPECTION Location of proprietary anchors inspected[to include grid
lines,elevations(floors)and drawing details]:
1.Checked in with superintendent or client representative. �t s., �r �,�,< ra�r ��!_�:cam' a,
Name: k•-e r,, ,r,L- ,.,y.0 :..k•s s.-C S-r., -.., . ,T; ...1..:,f 47 C7,,,,,i�
Company: Vb,. I'-' .9 = / , . , ,� M„
t<'., -/e",, r 1:,car rf x.,1 s ,:...,, .ate_s
2.Inspection was"IBC" El Continuous E Periodic
! •srf=" -,-/,,..,-,_, „./... ,— _iSu T kar er r . ii,-,,r,,c a
,
i-- 7,,,',=- Vic- Of C.) _C*..'17 Le J0,M
PROPRIETARY ANCHORS
Yes NoN/A
1.Reviewed previous inspection reports? A
2.Reviewed evaluation report? x REPORT SUMMARY
Verified following items meet manufacturer's
published installation instructions. 1.Work inspected was: Completed E In progress
3.Verified minimum embedment depth of the 2.Completed work inspected El was El was not
anchors.
in compliance with
4.Verified installation of the anchors.
El Approved plans and specifications El Shop drawings
5.Verified anchor diameter. a'
6.Verified steel grade. - ❑ RFI ❑ Design change El Submittal El N/A
7.Verified hole diameter. m Document#(s) /if,,-s %-y C.1,: Dated:
:,; 8.Verified type of drill bit used. n 3.Noncompliance item(s)were noted this date,details on
9.Verified hole cleaning method. - following page(s). 0 Yes El No 0 N/A
10.Verified adhesive application. 4
11.Verified edge distance. 4.Noncompliance item(s)were reinspected this date,details
12.Verified spacing. A on following page(s). 0 Yes L+ No [J N/A
13.Verified installation torque. 0 Conform El Remain in progress
Evaluation report number&date: Report(s)findings were discussed and left with
of i:.,s.( { \
Name of product being installed -.0-‘..i.'i k.I'
Batch Number Ii Z`-) 'Z
Expiration Date ' '`y
Based on the Code,approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be
covered.Carlson Testing has no authority to direct work of contractors or subcontractors.
Inspector Signature: ,'``'= f,,` `;°
0 See additional reportpagets).. . 0 Distribute attachments. Page of '
PropAnchors Ver.1 2/12/2009
, 411111.111.11111111.111111.111.11.001M1111
Terms:
Client recognizes that construction observation and/or testing services provided by CTI are techniques
which may reduce the risk of construction defects, deficiencies, or omissions arising during or after con-
struction. Services performed by CTI do not constitute a warranty or guarantee of any type. .Even. with
diligent construction monitoring and/or testing by CTI, construction defects, deficiencies, or omissions
in the Contractor's work may exist. In all cases, Client and/or the Contractor shall assign the Contractor
the responsibility for the quality and completeness of the work and for adhering to plans and specifica-
tions. CTI's work or_failure to perform same shall no in any way excuse any contractor, subcontractor,
or supplier from performance of its work in accordance with the contract documents.
CTI will provide its professional services to Client with that degree of care and skill ordinarily exercised
under similar circumstances by members of its profession. This representation is in lieu of other warran-
ty or representation, either expressed or implied. Itis also understood and agreed that statements made
in CTI reports are observations based on technical judgements, and should not he construed to be con-
clusive representations of:fact. If conditions different from what are indicated in the reports come to
Client's attention.after receipt of the reports, it is recommended that Client contact CTI immediately to
authorize further appropriate evaluation.
CTI's work shall not include determining,supervising or implementing the means, methods,techniques,
sequences,or procedures o:fconstruction. CTI shall not be responsible for evaluating or reporting job con-
ditions related to health, safety or welhtre.