Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (83)
CITY OF TIGARD BUILDING PERMIT 11 COMMUNITY DEVELOPMENTI. n. t ' . . Permit#: BUP2017-00179 R 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 1J Date Issued: 11/02/2017 T I ;' RD 9 ��I/. Parcel: 1 S 135AC04400 Jurisdiction: Tigard Site address: 8920 SW OAK ST Project: Oak Street Apartments Subdivision: ASHBROOK FARM Lot: 14 Project Description: Building B-92 unit apartment building. 5/4/2018: REPRINT permit to correct number of units. Contractor: THE SPANOS CORPORATION Owner: DBG OAK STREET LLC 10100 TRINITY PARKWAY, 5TH FL 2164 SW PARK PL STOCKTON, CA 95219 PORTLAND, OR 97205 PHONE: 209-478-7954 PHONE: FAX: Specifics: FEES Type of Use: MF Description Date Amount Class of Work: NEW Type of Const: VA Plan Review 07/13/2017 $26,080.60 Occupancy Grp: R-2 Occupancy Load: Parks SDC Improvement 11/02/2017 $281,004.00 Dwelling Units: 92 Parks SDC Reimbursement 11/02/2017 $65,957.00 Stories: 5 Height: 0 ft Parks SDC Neighborhood 11/02/2017 $104,177.00 Bedrooms: 108 Bathrooms: 112 DC Provision Review,COM New-Bldg 11/02/2017 $180.50 ,096,256 DC Provision Review,COM New-Ping 11/02/2017 $180.50 $12 Value: Info Process/ArchivingSm$0.50(upto 11/02/2017 - $273.50 11x17) Permit Fee-RES-New Construction 11/02/2017 $40,124.00 Floor Areas: 12%State Surcharge-Building 11/02/2017 $4,814.88 Total Area: 109486 Plan Review-Fire Life Safety 11/02/2017 $16,049.60 Accessory Strutt: 0 Metro Const.Excise Tax 11/02/2017 $12,000.00 Basement: 0 Tig-Tual School CET-Residential 11/02/2017 $134,667.78 Carport: 0 Info Process/Archiving-Lg$2.00(over 11/02/2017 $420.00 Covered Porch: 0 11x17) Info Process/Archiving-Lg$2.00(over 11/02/2017 $420.00 Deck: 0 11x17) Additional Plan Review 01/30/2018 $500.00 Garage: 0 Mezzanine: 0 Total $686,849.36 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: d. " . 11.1" Permittee Signature: iO4 197"/aL/e#9-70n/s Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2017-00179 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 11/02/2017 TIGARD g Parcel: 1 S 135AC04400 Jurisdiction: Tigard Site address: 8920 SW OAK ST Project: Oak Street Apartments Subdivision: ASHBROOK FARM Lot: 14 Project Description: Building B-87 unit apartment building Contractor: THE SPANOS CORPORATION Owner: DBG OAK STREET LLC 10100 TRINITY PARKWAY, 5TH FL 2164 SW PARK PL STOCKTON, CA 95219 PORTLAND, OR 97205 PHONE: 209-478-7954 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: MF Class of Work: NEW Type of Const: VA Plan Review 07/13/2017 $26,080.60 Occupancy Grp: R-2 Occupancy Load: Parks SDC Improvement 11/02/2017 $281,004.00 Dwelling Units: 92 Parks SDC Reimbursement 11/02/2017 $65,957.00 Parks SDC Neighborhood 11/02/2017 $104,177.00 Stories: 5 Height: 0 ft DC Provision Review,COM New-Bldg 11/02/2017 $180.50 Bedrooms: 108 Bathrooms: 112 DC Provision Review,COM New-Ping 11/02/2017 $180.50 Value: $12,096,256 Info Process/Archiving-Sm$0.50(up to 11/02/2017 $273.50 11x17) Permit Fee-RES-New Construction 11/02/2017 $40,124.00 Floor Areas: 12%State Surcharge-Building 11/02/2017 $4,814.88 Total Area: 109486 Plan Review-Fire Life Safety 11/02/2017 $16,049.60 Accessory Strutt: 0 Metro Const.Excise Tax 11/02/2017 $12,000.00 Basement: 0 Tig-Tual School CET-Residential 11/02/2017 $134,667.78 Carport: 0 Info Process/Archiving-Lg$2.00(over 11/02/2017 $420.00 11x17) Covered Porch: 0 Info Process/Archiving-Lg$2.00(over 11/02/2017 $420.00 Deck: 0 11x17) Garage: 0 Mezzanine: 0 Total $686,349.36 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Yes Smoke Detectors: Yes Manual Pull Stations: Yes Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those le are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.23 •c or 1.800. .2 4. Issued By: 01 Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspect'• date. This permit card shall be kept in a conspicuous place on the job site until inspect/ he project. Approved plans are required on the job site at the time of each inspection. Building Permit Application G"C-) j 6 ) Commercial RE ® FOR OFFICE t O\Ll' City Of Tigard Received //_ r 11,1 13125 S W Hall Blvd.,Tigard,OR 97223 Date/Bao....... UP a/ /7 �1 I Permit No.:6u Pte/7-60 17 a _ II Phone: 503.718.2439 Fax: 503.598. 0 2 9 2017 Plan Review..' Inspection Line: 503.639.4175 Date Rea In �7 Other Permit: __t TIGARD p Date Ready kris: W Internet: wwwhgard orgov cii Off;TIGARD Notified/Method: v r '7 I See Page 2 for J Supplemental Information ,a,,,„,,,,,,,„,,,,:,,,,,, „,,,,, i 14 1 +; �'".`�a ',,,�' ,,,,` ,„,,,,,,,,p,,,,-,,:.,,,,,,,,,,,,k441;044,4: 1 :° ct ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. 0iii Addition/alteration/replacement ❑Other Indicate the value(rounded to the nearest dollar)of all � . equipment,materials,labor,overhead,and the profit for the iL ` a „ TE R OFC ''"11 M1 4 i y> W'a•.; 44 work indicated on this application. ' 0 1-and 2-family dwelling 0 Commercial/industrial Valuation: $ so ❑Accessory building Er Multi-family Number of bedrooms: DI Master builder ❑Other: Number of bathrooms: Wrli - s ® Total number of floors:`.4-4-.•,'''..;-%'-4-i,--;-•-4:. - x ti . < Q Job site address: ?7.,2 00(-%, Oa �„L New dwelling area: square feet �tod q City/State/ZIP: -rt ktAlec) oz. ' 72_2.3 Garage/carport area: square feet Suite/bldg./apt.no.: 1 Project name: Ste _ noRzrA,lters Covered porch area: square feet ICross street/directions to job site: gcoo 4 OR K ST$Eer Deck area: square feet Other structure area:1 i3 square feet 19 rrj i46i9�1t ,fi i1 1 i;, ,w 'i yl' �.*.. �C T 0 '2S13s 4C oy�¢e 2S yl4I Lot no.: Permit fees*are based on the value of the work performed. / Tax map/parcel no:252,354c.�L 3 S135AL � Indicate the value(rounded to the nearest dollar)of all 4 D j 4 - . . equipment,materials,labor,overhead,and the profit for the .,4 .ii...:,-:"?.:,t;.911:0 ' ES�N >.o , i,.:4,- ;:,.:::77-;74.:4,,,,.;:, ,, ,-, work indicated on this application. / _.._-...__ , •— .. Valuation: $ '12, C��'�f Z5 k tit r t>J� IJ �7 (, -� Existing building area: square feet New building area: squareuare feet ,=u .• ,PROR YO f � x �� �� ��,�� 1 �,1; Number of stories: p Name: ^` 0 A . Ste 4h S 1 11►6 Type of construction: V,) Address: I(7totc Truki t'1'l ?A?.t..4,61 J FL.a(7 Occupancy groups: City/State/ZIP: ,STC2GIG.:t .N , 644. 99.i9 Existing: Phone:(ZeCi) lilt- 1-y5N Fax ( ) New: �� 1 M, t � t,-',,,,,,,,?,.:4,e,-4,,, . '- arya4v.. ..4' c de , , .Business name: A J?�� Contact name: TA4-e a_D it,tAvC Structural plan review fee(or deposit): Address: 1 0220 SCJ ( j Buell 2 D 601 C 3 FLS plan review fee(if applicable): City/State/ZIP: L��' O Total fees due upon application: 0 Phone:(503) 2?.- $b 33 I Fax::( ) Amount received (� 4,6 E-mail. `m0..UGk.00.ck c,..AOs• C t>WN PHOTOVO tJC O>�IL¢)(• S5 Q . .` ? CFO Commercial and residential prescriptive installation of roof-top ted Photovoltaic Solar Panel System. ciBusiness name: THE SQ A4 Jo cog..9Orc�(w . Submit two(2) of roof plan with connection d s Address: ���(� and fire department ac along with -- i I Oregon ..,./21,u t 1-.1 pA411G'y�r4.f 5 Solar Installation Specialty ecklist. City/State/ZIP:e• 7-C 14.TL \) ' c4 15-2.1q Phone: it fee(incl • plan re (Sc:, )`,� ••• .•ministrative fees): $180.00 (Sn3) Z?Z- $�3 3 I Fax:( ) CCB lic.: jq Fe,g State charge(12%of permit fee): $21.60 '/� Total fee due upon application: $201.60 Authorized signature ,/�/ This permit application expires if a permit is not obtained 1 ��ll.4_ within 180 days after it has been accepted as complete. I Print name: C�� I Date: /2(y/rI * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) 13c-De 1 RECEIVED CITY OF TIGARD OFFICE COPY TIGARD TRANSPORTATION SYSTEM NOV2017 DEVELOPMENT CHARGE (TSDC) CI OF TIGARD NOTIFICATION OF FEE AND PAYMENT OPTIONS BUILD 11<11Udit�R� Please sign and return prior to building permit issuance. This advises you that the TSDC for this project is as shown below and outlines the payment options that may be available to you. The TSDC amount will increase on July 1, 2018 if payment is not received before then. This form is to be signed and submit prior 0 ..suanc of a . g permit. 11 City of Tigard Date: Site Address: iv e_/, 7- E.---12,d '1,41©4-K S Jr-- Project 69.4K (4f w-rs Land Use Case '7P.2 2-4',G, -0 v o c V- Name: '3 y,g-"s k B or Permit#: ZIv p.A.m f -4,e)! Tax TSDC Lot#: / 513 5-4a 440 a Amount: 7"2 elk '4's.0 d This constitutes my request to use the TSDC payment option or combination of options I have selected below. [This selection can be changed up to the time a building permit is issued] I realize that TSDC charges are due and payable at the time a building permit is issued unless those charges are Deferred or are financed through Installment Payments. [Please address questions about TSDC or Deferral or Installment Payments to Albert Shields,Permit Coordinator,503-718-2426.] ❑ Cash, Check, or Credit Card,payment due at building permit issuance. Deferral until Occupancy,payment due before issuance of an occupancy permit. Payment of the TSDC may be deferred until issuance of the occupancy permit if the TSDC is greater than the amount for a single family residence,currently$ . In requesting this option I understand that any deferred TSDC must be paid prior to issuance of a Certificate of Occupancy and that the TSDC will be recalculated at the time it is actually paid based on the TSDC rates prevailing at the time when the building permit was issued. I further understand that TSDC rates may increase each July l st and that such increases are not subject to appeal. For a deferral request to be accepted both the Owner and the Applicant must sign this request. ❑ Credit Voucher (for developer-built required public improvements, subject to approval, completion, and acceptance of creditable improvements.) PLEASE NOTE: TSDC Credits must be redeemed at the time TSDC Payment is due,either at the time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy permit. If you expect to claim TSDC Credits be sure the improvements, any creditable payments,and your Request for Credits is complete either before your building permit is to be issued or,if payment is deferred, before you request an occupancy permit. No refund of TSDC Payments will be made if Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit. ❑ "Bancroft" or I stallment Payments (separate application requir:a.) AlO NER/ PPLICANT __/ i O,, ER f' PPLICANT DATE: 11./1 a 11- DATE: It/1 (r? is\CURPLN\Permit Co rdinator\TDT Forms\TDT Payment Option Form 071917AMS aLp et, is CITY OF TIGARD OFFICE COPY RECEIVED COUNTYWIDE TRANSPORTATION NOV 1 2017 DEVELOPMENT TAX (TDT) CITY OF TIGARD NOTIFICATION OF FEE AND PAYMENT OPTIONS BUILDING DIVISION Please sign and return prior to building permit issuance. This advises you that the TDT for this project is as shown below and outlines the payment options that may be available to you. The TDT amount will increa e on July 1, 2016 if payment is not received before then. This form is to be signed and su! ''d - I , .;.r t lissua e o wilding permit. City. Tigard Date: Site Address: 1v Soli 7- 8g2.IV Ski ©A�c' Sr7 Project a < Trztcr" A Pr", Land Use Case `1'>fe-2-4°I'L -na 01* Name: * Name: '30n„1>w6- 73 or Permit#: v'P 2t )7 , O o 11.Q TaxTDT Amount: Lot#: 10-13 6.AC O 4/yo c, ill 2� c a This constitutes my request to use the TDT payment option or combination of options I have selected below. [This selection can be changed up to the time a building permit is issued.] I realize that TDT charges are due and payable at the time a building permit is issued unless those charges are Deferred or are financed through Installment Payments. [Please address questions about IDT or Deferral or Installment Payments to Albert Shields,Permit Coordinator, 503-718-2426.] ❑ Cash, Check, or Credit Card,payment due at building permit issuance. 20:c Deferral until Occupancy,payment due before issuance of an occupancy permit. Payment of the TDT may be deferred until issuance of the occupancy permit if the IDT is greater than the amount for a single family residence, currently$8113. In requesting this option I understand that any deferred TDT must be paid prior to issuance of a Certificate of Occupancy and that the TDT will be recalculated at the time it is actually paid based on the TDT rates prevailing at that time. I further understand that TDT rates may increase each July 1st and that such increases are not subject to appeal. For a deferral request to be accepted both the Owner and the Applicant must sign this request. ❑ Credit Voucher(for developer-built required public improvements, subject to approval, completion, and acceptance of creditable improvements.) PLEASE NOTE: TDT Credits must be redeemed at the time TDT Payment is due, either at the time the building permit is issued or,if payment is deferred,prior to issuance of an occupancy permit. If you expect to claim TDT Credits be sure the improvements,any creditable payments,and your Request for Credits is complete either before your building permit is to be issued or,if payment is deferred,before you request an occupancy permit. No refund of TDT Payments will be made if Credits are submitted more than 30 days after issuance of the relevant building or occupancy permit. ❑ "Bancroft" or Installment Payments (separate application required.) tb(---- O ER/ ICANT O ER/ PLICANT DATE: Il f t I i 7 DATE: t./t /( 7- I:\CURPLN\Permit - I:\CURPLN\Permit Coordinator\TDT Forms\TDT Payment Option Form 061312AMS ,ih, TDT Estimate Oak Street Apartments - 87 7/19/2017 8920 SW Oak St. & lots, BUP2017-00179 AMS TDT RATES EFFECTIVE 7/1/16 TSDC CITYWIDE&TSDT RT OVERLAY RATES EFFECTIVE 7/1/16 INSIDE RIVER TERRACE • TSDC CITYWIDE RES. EFFECTIVE 7/1/16 0 Yes Project is in River Terrace ? QQ No Former Use Rate Type Use# ITE Code # Units Rate TDT Amount Description TDT 1 210 1.00 $8,278 $8,278 1 SFR TSDC-Imp 1 210 1.00 $5,488 $5,488 1 SFR TSDC-Reim 1 210 1.00 $317 $317 1 SFR TSDC-RT 1 $0 Total TDT and TSDCs Former Uses $14,083 Proposed Use Use# ITE Code #Units Rate TDT Amount Description TDT 1 220.00 87.00 $5,415 $471,105 87 Apts. TSDC-Imp 1 220.00 87.00 $3,201 $278,487 87 Apts. TSDC-Reim 1 220.00 87.00 $185 $16,095 87 Apts. TSDC-RT 1 $0 TDT 2 $0 TSDC-Imp 2 $0 TSDC-Reim 2 $0 TSDC-RT 2 $0 • TDT 3 $0 TSDC-Imp 3 $0 TSDC-Reim 3 $0 TSDC-RT 3 $0 Total All TDTs&TSDCs Proposed Uses $765,687 Less: Total All TDTs&TSDCs Former Uses $14,083 Total All TDTs&TSDCs Net Increase $751,604 Total Net County TDT $462,827 Total Net TSDC-Imp $272,999 Total Net TSDC-Reim $15,778 Total Net TSDC RT Overlay $0 $751,604 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $1,652,954 $962,590 Estimated Unmitigated Impact $1,190,127 $673,813 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 29% 30% Estimated Total Impact $2,615,544 $0 Estimated Unmitigated Impact $1,863,940 $0 • TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay -w Parks Estimate Oak Street Apartments - 87 7/19/2017 8920 SW Oak St. & lots, BUP2017-00179 AMS ALL PARKS RATES EFFECTIVE 7/1/16 ID Q Yes Project is in River Terrace ? ® No Note: All Neigh-Imp# Units entries= 0 if project is in River Terrace; All Neigh-RT#Units entries=0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 210 1 $4,356 $4,356 1 SFR Parks-Reim 1 210 1 $1,207 $1,207 1 SFR Neigh-Imp 1 210 1 $1,615 $1,615 1 SFR Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $7,178 Proposed Use Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 220 87 $3,280 $285,360 87 Apts. Parks-Reim 1 220 87 $772 $67,164 87 Apts. Neigh-Imp 1 220 87 $1,216 $105,792 87 Apts. Neigh-RT 1 $0 0 Parks Imp 2 $0 0 IIIParks Reim 2 $0 0 Neigh-Imp $0 0 g p 2 Neigh-RT 2 $0 0 Total Parks Outside RT Proposed Uses $458,316 Less: Total Parks Outside RT Former Uses $7,178 Total All Parks Outside RT Net Increase $451,138 Total Parks RT Proposed Uses $0 Less: Total Parks RT Former Uses $0 Total All Parks RT Net Increase $0 Total Parks-Imp $281,004 Total Parks-Reim $65,957 Total Neigh-Imp $104,177 $451,138 Total Neigh-RT $0 For Non-Residential Calculations: Prior Use: =###sf/EE;#####/###=EEs. Proposed Use: =###sf/EE;#####/###=EEs. • Parks-Imp=Parks Improvement,Citywide including River Terrace Parks-Reim=Parks Reimbursement,Citywide including River Terrace Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace Neigh-RT=Neighborhood Parks Improvement Inside River Terrace City of Tigard 11 ® COMMUNITY DEVELOPMENT DEPARTMENT e TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: T u.P (901-) —0C3 t *7 9 Site Address: g9,920 SvJ 0-444 SiT€Lr Suite/Bldg#: A Project Name: lJ Cot It. S fi pc1✓ t3 (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review g7 Lou IT Proposal: 4 b V I 1 ck;v i. Cl pen r-tr 1 f"-- 0 —❑ Verify site address/suite# exists and active in permit system. I/ River Terrace Neighborhood: ❑ Yes /No ►I Land Use Case#: PD t( ' " 0001-1 eli lan Match Approved Land Use: Site Plan Landscape Plan ❑ Other: at,,Urban Forestry Plan ..�' Elevation Plan „I :uilding Height: Maximum Height — Actual Height (p S • S U Conditions Met: / Prior to Submittal ❑ Prior to Permit Issuance Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license /l Public Facilities Improvement(PFI)Permit: 1 F t- 2,0%1 — O Su I Required: ❑ Yes,applicant was notified ❑ No Applied For: / Yes ❑ No,stop intake Notes: Approved by Planning: G.....„ /� Date: ( ``2? -/7 Revisions (after Building Submittal only) Reviewer Date Revision 1: Approved ❑ Not Approved fri` ��� �`- =' I V/ I Cf / 11 Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal / Original Submittal Date: 60(A9! 17 Site Plans: # Building Plans: # 3 Building Permit#: [i Enter building permit#above. Workflow Routing: ErPlanning (a-') ngineering [ i rmit Coordinator --ErBuilding Workflow Sign-off: 2--Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. .44 { Notes: ; /10.0I 011 /79 ,441-vv c.. L. ,r By Permit Technician: C-. .. .L.,, Date: 61 I:\Building\Forms\BldgPennitRvw_COM_WithLandUse 070915.docx Engiering Review RE lope at building pad: 3 Z ( PFI Permit#: ,11 �O doSe C -conditions "Met"prior to issuance of building permit COM (t Tio+us t.(Or Mtro"r 'easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) g-Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes L No Assess Water Quantity Fee in-lieu: ❑ Yes [No LIDA Facility on lot: ❑ Yes [ No NOT Ap roved by Engineering: V, r i s (ACR Date 'j /p-(1 Notes: (:;v L<.. /i V.44-0 Approved by Engineering: Date: Revisions (afterB�u' ding Submittal only) Reviewer Date Revision 1: IV Approved ❑ Not Approved e tr4-. -- - ..X.---- to -A., I Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit / Approved, �u-NOT Released: � ' °"~--, /17,415;;;e: .7/;41/ Notes: Revisions (after Building Submittal only) �/, Revision Notice 1: Date Sent to Applicant: , j,,r- / %: - c ./ r.. ' Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: N®!fes III N/A iya‘ Tigard Trans SDC: Yes ❑ N/A Parks SDC: ''Yes ❑ N/A OK to Issue Permit At. pproved by Permit Coordinator: MFate: 10/2-`I/ — I:\Building\Fonns\B1dgPermitRvw COM WithLandUse 070915.docx City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 8920 SW OAK ST, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00179 Inspection Type: Inspector: 220 Slab Jeff Grove Result: PASS Comments: Radon ok under leasing office Ok to pour with special inspection Violation Summary: Inspector Contractor City of Tigard Tel: 503.718.2439 Location: Inspection Date: 8920 SW OAK ST, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00179 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: FA I L Comments: Fire life safety met Ok for TCO Violation Summary: Inspector Contractor