Report (50) « 7409 SW Tech Center Dr,Ste.145
411=0,. Tigard,OR 97223
Ph:503-443-3799 Fax:503-620-2748
fl NM,. I,1'
503.443.3799 Special Inspection
Final Report
Date: May 24,2017 Job# 16-6497
Permit#BUP2015-00370
Mail To: Project:
Keller Holland Tigard Investors, LLC Tigard Apartments
1111 Main Street,Suite 700 13225 SW Hawks Beard Street
Vancouver,WA 98660 Tigard,OR 97223
Building 10
To Whom It May Concern:
ACS Testing,Inc.attests that their inspectors performed special inspection(s)on a continuous and/or
Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed
For the following:
Wood Construction
Anchors—Cast in Place
Anchors—Adhesive
Anchors—Expansion
Reinforced Concrete
Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf
of ACS that work was performed to the best of my knowledge, in accordance with approved plans,
specifications,and the applicable codes and standards for the jurisdiction.td-C)/)(3/‘Appro by:
4 ^
Bob Brown/President
BB/sa
lap
Proud to be Nationally Accredited by International Accrediting Service
ACCREDITED
rte`
1,0
FROELICH
ENGINEERS 1 Structural - Final Summary Letter
Client: LRS Architects
Job Name: Scholls Ferry Apartments—Building 10
FE Job#: 15-T084
6/1/17
LRS Architects
720 NW Davis
Suite 300
Portland, OR 97209
RE: Scholls Ferry Apartments—Building 10
13225 SW Hawks Beard Street
Tigard, OR 97223
Permit No. BUP2015-00370
FE Job#: 15-T084
This letter is to confirm that Froelich Engineers, Inc. has performed Structural Observations of the Scholls
Ferry Apartments—Building 10 in accordance with Section 1710 of the 2012 International Building Code.
We have reviewed the Special Inspection reports in addition to the Final Summary Letter dated May 24,
2017 by ACS Testing, Inc.To the best of our knowledge,the construction of the structural portions of this
building is in conformance with the approved construction documents and there are no outstanding
structural items to complete.
Please feel free to contact our office if you have any questions.
Sincerely,
Faramarz Dean Azimi, PE, SE
9UcTU,
A 154 2
CC
V 0 EGON izz
-y14:4 1-25 c57, Q"
4 ? DE l''t
EXPIRES: j/31 JzcA?
Attachments:ACS Testing, Inc. Final Summary Report
Cc: File
A Main Office A Central Oregon
6969 SW Hampton St. 745 NW Mt.Washington Dr.#205
Portland,Oregon 97223 Bend,Oregon 97701
503-624-7005 www.froelich-engineers.com 541-383-1828