Loading...
Report (37) O'Pl1AL1 7409 SW Tech Center Dr,Ste.145 41=6%'CAL I% Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 OILS IL%T1G.MY' 503.443.3799 Special Inspection Final Report Date: 5-24-17 Job# 16-6497 Permit#BUP2015-0362 Mail To: Project: Keller Holland Tigard Investors, LLC Tigard Apartments 1111 Main Street,Suite 700 13375 SW Hawks Beard Street Vancouver,WA 98660 Tigard, OR 97223 Building 2 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Wood Construction Anchors—Adhesive Anchors—Cast in Place Anchors—Expansion Reinforced Concrete Based on personal observation, inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. Approved by: (311 4M� Bob Brown/President BB/sa N44100S Proud to be Nationally Accredited by International Accrediting Service ACCREDITED AI Air r FROELICH ENGINEERSI Structural - Final Summary Letter Client: LRS Architects Job Name: Scholls Ferry Apartments—Building 2 FE Job#: 15-T084 6/1/17 LRS Architects 720 NW Davis Suite 300 Portland, OR 97209 RE: Scholls Ferry Apartments—Building 2 13375 SW Hawks Beard Street Tigard, OR 97223 Permit No. BUP2015-00362 FE Job#: 15-T084 This letter is to confirm that Froelich Engineers, Inc. has performed Structural Observations of the Scholls Ferry Apartments—Building 2 in accordance with Section 1710 of the 2012 International Building Code. We have reviewed the Special Inspection reports in addition to the Final Summary Letter dated May 24, 2017 by ACS Testing, Inc.To the best of our knowledge,the construction of the structural portions of this building is in conformance with the approved construction documents and there are no outstanding structural items to complete. Please feel free to contact our office if you have any questions. Sincerely, Faramarz Dean Azimi, PE, SE , QuCTUf44? 154P2 W v 0 EGON s 9 Nk EXPIRES 1211 I2 17 Attachments:ACS Testing, Inc. Final Summary Report Cc: File A Main Office A Central Oregon 6969 SW Hampton St. 745 NW Mt.Washington Dr.#205 Portland,Oregon 97223 Bend,Oregon 97701 503-624-7005 www.froelich-engineers.com 541-383-1828