Loading...
PFI2017-00144 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT +� v n Rcqucst for Permit Action 171,,�1,7 io�7j 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • www.tiga� rT d or.gov TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor ❑ City Staff Check(✓)one. REFUND OR Name: N/A INVOICE TO: (Business or Individual) Mailing Address: N/1A City/State/Zip: N/A Phone No.: N/A PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (✓): ® CANCEL/VOID PERMIT APPLICATION. ❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). ❑ REMOVE/REPLACE CONTRACTOR ON PERMIT (do not cancel permit). Permit#: PF12017-00144 Site Address or Parcel #: SEG3482 Project Name: PGE Subdivision Name: N/A Lot #: N/A EXPLANATION: Per Engineering, PFI permit is not required. Scope of work was already covered under permit no. PFI2017-00071. Date: 8/2/17 Signature: Print Name: Lina Smith Refund Policy 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. FOR OFFICE USE ONLY Route to Sys admin: Date By Route to Records: Date /f /`P B Refund Processed: Date Invoice Processed: Date B Permit Canceled: Date � Parcel Tag Added: Date B I:\Building\Forms\ReegPemitAction_0923 f4.doc rk RECEIVED N AUG 01 2017 City of Tigard 7 � PUBLIC WORKS —ENGINEERING CITY DE TIGARD ■ PLANNING/ENGINEERING Public Facility Improvement (PFI) Permit TYPE OF WORK DESCRIPTION OF WORK(in the right-of-way) d TYPE 1—Franchise Utility Work Check one: 16 Utilities ❑ Sidewalk/driveway approach ❑Street improvements performed by NWN, PGE Detailed description: Street widening-overhead to underground and/or utility agency. conversion. ❑ TYPE 2-Sidewalk/Driveway/Sewer Work performed for the purpose of: - • Sidewalk installation or repair. • Driveway approach installation Property address/location(s): _14747 SW 79th Ave and/or repair _ _ • Sanitary sewer lateral installation and/or main line tap Applicant: PGE (Submitted by Dawn Dodds) ❑ TYPE 3-Full scale Development PP Work performed with Land use Address: 10800 SW Avery St approval which includes any of City/state: Tualatin, OR Zip: 97062 the following: 503-612-6055 rere coord n.com • Subdivisions or Partitions Phone: Email: p 4 @p9 Contact name: Dumitru Ilioi Phone: 503-672-5477 • Street widening • Mainline installation for Sanitary Contractor: Portland General Electric sewer, Storm sewer, Tigard water and/or Tigard Water Service area CCB#: Expiration: Address: 10800 SW Avery St SUBMIT COMPLETED APPLICATION TO: City/state: Tualatin, OR Zip: 97062 City of Tigard Phone: 503-464-7777 Email: dumitru.ilioi@pgn.com Planning/Engineering 13125 SW Hall Blvd. Contact name: Dumitru Ilioi Phone: 503-672-5477 Tigard,OR 97223 Applications for"minor work in right-of-way" Engineer: only may be emailed to: rowpermitsCtutigard-or.gov Address: FOR STAFF USE ONLY City/state: Zip: l Phone: Email: Case No.: Contact name: application submittal fee: $ Additional fees: $ Estimated value of work is required(if over$5,000):$ application accepted: (within the public right-of-way) By: k2h Date: f 1 Is work related to a LAND-USE DECISION? S/�-es ElNo application reviewed: By: Date: If so,please specify (MLP,SDR,SUB,etc.) case #: Applicant notified: Is work related to a BUILDING PERMIT? ❑ Nes ❑ No By: Date: If so,please specify(BUILDING PERMIT)case#: I:\fNG\PermitApplications\pfi_application Rev.12/16/2016 City of Tigard • 13125 SLS'Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov - 503-718-2421 • Page I of 4 APPLICANTS NOTE: Person specified as "applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.041.140. * With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner(s)must sign this application in the space provided or submit a written authorization with this application. franchised Utilities are not required to obtain the owner's signature on the application BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT: • The above request does not violate ant:recorded deed restrictions that mat:be attached to or imposed upon the subject propeM. • If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. • All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such statements are false. • The applicant has read the entire contents of the application,including the policies and criteria,and understands the requirements for approving or denying the application. Applicant/Authorized Agent's signature Print name Date SIGNATURES of each owner of the subject property, if required. Owner's signature Print name Date Owner's signature Print name Date Owner's signature Print name Date PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES FOR STAFF USE ONLY Public Facilitv Improvement(PFI)Permit: DETAILED SUBMITTAL APPLICATION FEE REQUIREMENTS Part 1: Required submittal fee$300.00 FRANCHISE UTILITY AND SIDEWALK/ PERMIT FEE DRIVEWAY AND UTILITY CONNECTIONS,ETC. Part 2: All non-water system improvements (work in the right of way) Engineer's estimate X 5%(less$300.00 submittal fee) Engineer's estimate X 2%Plan Review Sketch (including information below) WATER SYSTEM FEE ❑ Dimensions Part 3: All public water system improvements ❑ Street Name Engineer's estimate X 12% ❑ Site Address PFI Permit Fee Exemptions: FULL SCALE DEVELOPMENT There will be no permit fee charged,or assurance required (Subdivisions/Partitions and Street Improvements) for the following types of work: • Sidewalk repair(less than 20 lineal feet) • Relocate or replace mailbox Design Plans • Ditch cleaning that does not involve regrading. (G sets,24x3G or 22x34) • Weep hole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend • Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.) • Lawn sprinkler system installation or repair ❑ Street(Plan,Profile) • Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile) • Planter strip landscape maintenance ❑ `Fater Quality Facilities • Test wells ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Note: A cash assurance may be required per Storm,Sanitary,Water,Signage,Street Lights,etc) TMC 15.04.140.(customer deposit) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) Additional Submittals (per Land Use conditions) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design(if applicable) ❑ Water Department Approval PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 SAMPLE SKETCH: y ►mow y S t Edge of Pavement p I Ditch Streetlight I ■!■:■i■!■i■!■-■!r!■i r Rain Dr:ajn I I ' ' T rr o j)oscf�Selw'e r�lri n e" Existing House Existing �� I g 1 1 I >I - Driveway . �I i (A01 , CI L■ IL i WI i 4 1 I i 1 >� V I 1 Existing Shap I 1 � J Powerpole 1 95, TI '------- Line ------ --- � raperty i • 1 I Fire Hydrant(FH) I � i Scale: A"=30' � I I � � 1 I � I I I � � 1 MINIMUM SKETCH REQUIREMENTS (Put"N/A" if Not Applicable): North arrow Property lines &dimension Slope of property Street &street name(s) Existing building, structures Utility&street light poles Proposed work Existing curb or edge Trees Existing S/W or of pavement Existing utility locations D/W apron (sewer,water,storm) PUBLIC FACILITY IMPROVEMENT PERMIT City of Tigard ■ 13125 SW Hall Blvd. ■ Tigard,Oregon 97223 ■ wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 • Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads(less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater,when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection,the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 CD CA Single Flagger Operation Q CD for Low Volumes B I (Optional) o PR wr� r,; N cn W N b (ADT<400) ro s.o� FlaAC ro 0 0 o D BE .a I PREPARED ONE LANE A B B C ROAD m a A 10 20 2► I TO STOP AHEAD ID • ROAD ® . I WORK vi WI W `r° I c e K o 4 A l.-.J I 1 AHEAD N O O O N m I 1 0 -r Nall I N I n Ste.ChapW4 " PFIEPMED _ _ m ro SM µFO's I \V `b"oo`bcngv ons I A B ro`----------- ---� Tt s I 1 mileTI I � r max. 11w — • 0 T • • — — — — to (Q B B \ Buffer \ Protection Vehicle ROAD • w/TMA(both Optional) WORK See Chapter 4 0 AHEAD � ONE LANE BE 0 ROAD AHEAD ro STo� Two Flagger Operation W m CD ^y ;, (optionan p Cn SUBDIVISION LEGEND MC DONALD YICREITY AP NEW PGE FACILITIES 70 BE INSTALLED WR CHECKLIST (� �7D•rd61 A PHASE /F300 SECONDARY SPLICE PEDESTAL THINK r " IUHLfss orHERwuE slFanfD; IRM rfs co6M1EM 9APETY BDNIT O 7.2 240820 AD OUNT N1LB ON 644-PGE PADMOUNT VAULT [�ReeeL tL ° ro'e rowsrMi w OIJOB SITE w O 262 B PHASE ,_.—s : .i .nrwrnrro°•.i..+Mr .:un,M:.01 B2 1D 001e1 SW DURHAM RD s I�.2 210720 PM SOKVA NTt6 �'=T"e°"sON 644.PGE PADMOUM VAUIi /51 D.O / 1 c 655-F6 m� lu�1r 1e7 Po oolRD *F' 67 2473 50 rlam ° r ��r O r ca rEMr zq 01850- ro+!°f+r°'•,M F^°"O —_._ ooz D� wr]caa4r _______ orom`i N PL 066]] -De "METHE Viz. AFD R a:`owM a�1A"°«" P 11=r.".""a., <I.•d., 7•r MfIXnCOs1 rW IrN 4ElOC�+rONi ro aDlse PEN t Ts-as mr�aaR+pe.. rpr.r°e.°mraep we rvnlD.Au n V T 05928 edw,e9R ux•,ron rmrn.Mr er M PntfaY4 Powls9 -NF .»N FSfCOnWAr�w IY'NC COnp,Yr Io.0 co,]n eo,Se Ier sr soi v, re,. 145 zoopP ro 1 T6 001 TT ro W I Ts ________20 ._____.A so yr aDI6d 25 4160 j21 25O°Ayr aorsd zD nSW CORNUrT LN1z 4 nrV1 U0I67 _ O --. O 0014] POLES Intl A• - - -___._ 2; , 6 o-e r w M �v, `Ctwif M1 2.J.4.Mr.Ha.SI C.I.I.TO EXPOSE CONDO AT BASE OF POLE 01 3 HEIGHT 1pEEfl A ZS 98116 1 .4ear.•m/ n r�iw`swue PGE 10 PULL OUT THE CONDUCTORS ^ YT 00155 ro MIT `"'19 `°•+" .0 •c.1 1 - / FRAMING nf94.•riSloN R asrwunON uF coNs wan r0,r] Q DIBSD- O �•,Q63 8 PHASE dw r..ws•..r. w mm CUSTOMER i0 CONNECT THE NEW CONDUIT In �M LI) PLDOI31 r\ TO THE EXISTING CONDUIT = 4 IP 12 240120 PM 15KVA NRB �'! (`/>-- r:.r0 PULL IN NEW CONDUCT 0R5 ^ 0 001 48 S ON Edd-PGE PADMOUNT VAULT �0 J °p w ws xNr. 22 25 n TSS' .en..n D0151 'Y1 �O J am mm ryes IR ` Op PD-W4 B PHASE •: 1•C. 0 ANCHORS ON PL-1021 , 1P 7.2 244120 PM SOKVA NTLB ON 64d-PGE PADMOUNJ VAULT p, ,1ti.,• �`�✓, 1 aS Y i LEAD I s S s� FRONTIER OWNED POLE YT 00165 -_____ _ _ l2 p0 164 B SW HANSEN LN `n'°1 `:.+ PD-314 A PHASE curs c]w cp°i Or I.vr IP 7.2 24042 PM 25KVi YET __ _ � N PAD UL _ _ .v; -- ___ _ __ - - O •.. A PGE STREET LIGHTS PROJECT MANAGER Pr'"rr I - 1I� JEFF STFIGLEDER 503-672-5462 102' ro Ws? 8-2 AL%LP JKT-D 1�b36- G1e SEC leJbp K00164I ,n z `nr" ,or ,n,. , r0�. ni n lOr o '�J "313 A PHASE 10 w1 PO 00170 PE 00111i 7.2 240720 NTLB CONSTRUCTION NOTES: O Rsof: N ON 444-PGE PADADMOUNT OUN7 VAULT p.. d SC 40255 100015 - _ ro r r^.cxs dFr.ve n uc•4s,•°r..rMwO r•0. .. sPFMO SECOM MY r .L.n aulap r.•.•r.. :% u�'__ it 12 11_14 - STREETLI LIGHT PEOESTIL .. A 2 AL-T% _-_ `_ _ STIb- ]307 .. .r. � rol°. \ RAL1Q� P' 1076 3M % m rs Y�` R/I�RAN5ED11(R +u I CON°U•ur•n u015 F e ,�r n L.1o.w•v r z, dP .. ♦[ ,� .x.rr _x_.r..,, ..x ..,.:e w.. urwrvrve•4nsr» L- - i; to ve•.v rwM ♦_ °145 �` •� IV OM TAPER n �• .F /M[ ?K ,�L I801H EJOS] ro [ ] AFS 46.50] �� ,F. aNa r - — 363 V -RI 6' iron 264. 1022VT-311 .°],. ♦ ,. .. T-1.ur VT-317 \^§��:. � r°.n4nn A]r uan.9 Maw rwwoM4n m..m Fr9em ,;- tO1, dFaEcd vMAT prrar nun FRONTIER OWNFD FOIE \• qyA�� 444-P VAULT J - 4M' rw®Iwur.•uewx•nl•rr,o up.n rw •_,_ W/IAD MOUNT UO ' 315 n,n - pL-1771 w.» e ..n.arArs erw uacuAre»e e.Hn s• Sw coil Avi POLE •• e• REEPIAC�CLAS 40 CLASS 4 POLE o, ui .r.w r ra r.n, r s,cupn n nn ro-rru•+. M S 3 POLE r•w _yam x WITH TO SOUTH A 15 43101 __�•—____ W0 313 6393 rOr r ' S ro nn rrnrnwr r^wr H w Orr•0n•r u..e[+r arH con 6-20 45 J D200 1972 DP _ VT Jt1 O O 7y' S.5' 7-� u } RY PAAE. Oi____-______— —_----.--- INSTALL 4•FOLE CONDNT UNIT 1 vcrmnw i7• CALL eil erfORE roV 01G PO Be PO A 2 AL-TX PGE OWNED POLE WITH 12-RMCRFTS,2-M2 W P617 A ° • TRENCH DETAIL'B' • ouT",ax a rn .nn nMcer.oUnnmsnortOcwe ]e 7'1 LIGHTNING MRESTFR � I ECIRISHALR/S1/Ml A 25 59696 I i 1.50' 99••]9ee . +IBUrra+CHnN A1M1WRn9ibn Ib3T]2 rPe, P•• CONDUIT n era • CONTACT SERNCE CDORDINAIOR i plg4sl rrtnnY rdirft Un res O•/eOY °i euvusno rseN cfvrfe.en.rit.s, ^^°'`"Or'below. ITS' 15050 1.L ,I w \ s e rnoe ro arnv. C91 6rra.e ro�drp 76J6 GIb SFC•,bJ6+ iLlf 660-PGE SWITCH VAULT sO]I] .r•� 1 A ] caoeoulA �' AS-BUILT VERIFICATION ro 107 6 NESC VIOLATIONS CORRECTED PL-316 M, r__ �«m•��na d .,a.aw n.,n r ✓: _\� pIGM Of WAY PERMIT NOTICE llO� /t IP 12 N IN ON 25KVA r - ewr NOM nR IorK nAndnrov n HamR MwrF.M '1'1 191,NEW 3o C-1 d A 50 32Nd J e A 2 AL Tx - ONrueron.v eavnierrowin uP`wHw wP o'rwee snr D Gr+r.mr EenmOn Don A PHASE TRANSFORMER L. br Irld�nnrvrrror,.bP Sfft"CF POLE A]S e. t5nB0 "�'( ] vo+aon u[w.m rrn rc[wne M Au°w[0 a wan Irwn mE t NA,n _ otH1506F Sw 0+ AYF x. ,•, i'I I W ' MaNKTO.ro MGwCOF•IOr n4 r�1MnOSnOv 4 xr°rR5 Ku• I.;y♦. cawn ro n00, • mn000.5b _ SDMdENG REVRW: ASBUIIr By DESIGNER V U 6527 IS I. •• r K rrr.sof P n MO11 "� Mf M2]OJe66 o� b-Sp II 563. (� preww \ PGE rdYtRS,OF n09rlS LLC+,FIDEIAERIIY]IOGF SUeDmSgN 1636> GI6 SEC 1.636• �= 3005 ;♦ Iw r _ a,rr.rr GIb ppl 6.670. ANY DEVIATION FROM THIS DESIGN MUSE 0r/RH4M eHDOEIORr ^N^36 JI' 9 BE APPROVED BY PGC PROJECT MANAGER ;PGE/ w 5 5w 1,n.I,e.,rGNrD ,.nr.,r . GIb N£Vi.9e,i• "\\ PGE fACILITIES c.7.es0EN�rArlw TO r0opruw w.4Ru 1 ,r�..eu rrrn V ].-rpRn e' `FlEcrec p.on�rxs w rHF Fn°.°.s Mu uusnMrn Effnuua ai To w cor+Ixs1«+POP men].•FroKMFM 6 _ n]Awea a�aounas ro FucdvM a wASH CD CII.T. , M21H6]] [gMMfM MIIHw Ilr dSTRIMJIrON r'f+Fn rt IS RFCDMMHWD JIM + r °4rg14 dMMU 4Ar 6R yi'�0A DD••rMl Rld •r..mr n,a Cldrw.o C.[MIW