11/03/1987 - Minutes METLGEr CIF MINUTES
(november 3, 1987
Members Present : Bill Benz , Cat,y Chase , Rav Coffeen , Don
Miller , Margaret Nolan , Dave S i eb of d
1 . Minutes of the last meeting were missing . The process
of rotating secretary was abolished and Lion Miller was
appointed, secretary. Margaret Nolan volunteered to
substitute when Mr . Miller was absent .
�. Mr. Wooley , City Engineer, discussed the answers to our
questions from the last meeting . ( 1 ) The drainage detension
areas and what could be done with these . This included the
possible elimination of the .31st & Steve detention pond .
This would require the owners to petition the city to tEke
over the maintenance of the pond . This would include
dedication of the pond to the City and elimination of the
LILA . It was suggested that this process be explained to the
owner of the property included in the Sleepy Hollow (78th &
Spruce) LID. This pond has been privately maintained . (2)
The ODOT pians for the Metzger area. Mr. Wollev said that
these plans have been moved back to possibly 1991 for
completion . (3) The various techniques of street
improvements , ie, half streets vs 2/3 street vs full street
vs offstreet asphalt pathways : which can be done in the
Metzger area .
3. The idea of Block Grant Matching Funds (CGBG) to finance
some of the desired impr:oveoients was presented . Two
proposals already entered by the County were discussed since
these were the only ones in consideration at this time.
There was a motion and second to back the pathway proposal
near the Metzger Elem . School . The motion passed
unanimously . A second motion was entered and seconded to
commit a sum of $50,000 to back the CDBG proposal . -rHE SaZ'�'va
r"7-16,.4u urns pA-SS uNA-Ir91/Yt0Us L-Y.
4 . The committee asked Mr . Wooley to check on existing or
to run traffic studies on the following streets : ( 1 ) Locust ,
(2) Pfaffi e, (3) 90th , and (4) Oak to help establish our
final priority list of improvements . Locust and Ffaffle
were the streets of higest priority .
5. A preliminary list of improvements were presented for
further discussion by the committee. The following is the
list with no order of priority :
(1 ) Street lighting - complete or specific areas
(2) 2/3 street improvement on Locust street
(3) 1/2 street improvement on Pfaffle street
(4) 1/2 street improvement on 90th street - school
side
(5) street improvement on Oak: street
C . The next metting will be at 7:00 F .M . on December 1 .
1987 .
The meeting was adjourned at 9 :3C► F .M .
Resp ect+ul i V st..tbmi tt.edi
Clonal d Mi 1 1 er