Voelker Engineering, Inc.
1911 116th Avenue NE, Bellevue, WA 98004 425-451-4946
DR Horton Plan 3725
Heritage Crossing Lot 33
Tigard, Oregon
41 41,
Structural Calculations
November 4, 2016
JN 10051.4
A 2016
+Xr
Building Code: 2014 OSSC
Snow load: 25psf 1 4 AT G D j O�
Roof Dead load: 15psf
Floor Live load: 40psf
Floor Dead load: 10psf
Wind: 120mph Exposure B
Seismic: Soil class D
Spectral Response Coefficients
Ss = 1.58, 51 = .55
INDEX PAGES
Lateral analysis L1-15
Roof framing R1-2
Upper floor framing UF1-11
Main floor framing MF1
Tall studs at dropped garage S1-2
I. ,/.,'
6 1 '�'
1512 `
-(j1)- 2 5,'\
'S7,9 s'iv LES '440 -'
LE -
EXPIRES: 6/251/7 1
Voelker Engineering, Inc.
1911 116th Avenue NE, Bellevue, WA 98004 425-451-4946
DR Horton Plan 3725
Structural Calculations
November 20, 2014
JN 10051.4
Building Code: 2014 OSSC
Snow load: 25psf
Roof Dead load: 15psf
Floor Live load: 40psf
Floor Dead load: lOpsf
Wind: 120mph Exposure B
Seismic: Soil class D
Spectral Response Coefficients
Ss = 1.58, S1 = .55
INDEX PAGES
Lateral analysis L1-15
Roof framing R1-2
Upper floor framing UF1-11
Main floor framing MF1
Tall studs at dropped garage S1-2
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L1
Bellevue, WA 98004
DR Horton Plan 3725
Lateral Analysis of Wind forces(ASCE 7-10,2012 IBC)
Design wind pressures and forces are determined per equations given in section 28.4-1
System Type Structure Type Equation
Main Wind-Force Low-Rise Buildings p : gh•[(GCpf)-(GCpi)]
Resisting System Gable Roof qh : at mean roof height h
GCpf : Figure 28.4-1
GCpi :Table 26.11-1
Velocity Pressure Calculations,qh
Velocity pressure qh is calculated in accordance with section 28.3.2.
qh =Velocity pressure @ mean roof height(h)
qh =Constant• Kh • Kzt• Kd • V 2
qh =Velocity pressure @ height(h)
Where : Constant = Numerical constant
'/ • [(Air density lb/cu ft)/(32.2 ft/s2)] •
[(mi/h )(5280 ft/mi )• (1 hr/3600 s)]2
0.00256
Mean Sea Level = 0.00 ft
Air Density @ MSL = 0.0765 Ib/cu 1
Category = II
Exposure Category = B (Urban areas)
Alpha = 7
Zg = 1,200.00 ft
Basic Wind Speed = 120.00 mph
Mean Roof Height = 25.00 ft
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L2
Bellevue,WA 98004
DR Horton Plan 3725
Velocity Pressure Calculations,qz(Cont.)
Where : Kh = Velocity pressure coefficient @ height z
= 2.01•(Z/Zg)^(2/Alpha)for 15 ft<=Z<=Zg
= 2.01 • (15/Zg)A(2/Alpha)for Z< 15ft
= 0.7
Kzt = Topographic factor obtained from Fig. 6-4
= (1 + K1 • K2 • K3)2
Kzt @ h = 1
Kd = Wind directionality factor obtained from Table 6-4
= 0.85
qh = 21.95 (psf)
Internal Pressure Coefficient, GCpi, TABLE 26.11-1
Enclosure Classification GCpi+ GCPi- Ri GCpi+ GCPi-
Partially enclosed buildings 0.55 -0.55 1 0.55 -0.55
Roof Angle 30.1 degrees
External Pressure Coefficient-Load Case A
(psf) (psf) (psf)
1 0.56 21.95 0.55 -0.55 0.22 24.37
2 0.21 21.95 0.55 -0.55 -7.46 16.68
3 -0.43 21.95 0.55 -0.55 -21.51 2.63
4 -0.37 21.95 0.55 -0.55 -20.2 3.95
1 E 0.69 21.95 0.55 -0.55 3.07 27.22
2E 0.27 21.95 0.55 -0.55 -6.15 18
3E -0.53 21.95 0.55 -0.55 -23.71 0.44
4E -0.48 21.95 0.55 -0.55 -22.61 1.54
p+ uses GCpi+ p-uses GCpi-
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L3
Bellevue,WA 98004
DR Horton Plan 3725
External Pressure Coefficient-Load Case B
1 -0.45 21.95 0.55 -0.55 -21.95 2.2
2 -0.69 21.95 0.55 -0.55 -27.22 -3.07
3 -0.37 21.95 0.55 -0.55 -20.2 3.95
4 -0.45 21.95 0.55 -0.55 -21.95 2.2
5 0.4 21.95 0.55 -0.55 -3.29 20.85
6 -0.29 21.95 0.55 -0.55 -18.44 5.71
1E -0.48 21.95 0.55 -0.55 -22.61 1.54
2E -1.07 21.95 0.55 -0.55 -35.56 -11.42
3E -0.53 21.95 0.55 -0.55 -23.71 0.44
4E -0.48 21.95 0.55 -0.55 -22.61 1.54
5E 0.61 21.95 0.55 -0.55 1.32 25.47
6E -0.43 21.95 0.55 -0.55 -21.51 2.63
Wind Pressure Zones-Sums of positive and negative pressures
Transverse Direction
Load Horizontal Pressures
Case A B C D
1 15.41 5.28 12.25 4.23
Longitudinal Direction
Load Horizontal Pressures
Case A B C D
1 15.41 5.28 12.25 4.23
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L4
Bellevue,WA 98004
DR Horton Plan 3725
Light Wood Frame Construction? Y
Mean Roof Height 21.25 ft
Maximum Height 24.5 ft
Building Width 40 ft
Building Length 50 ft
Roof Plate Ht 18 ft
Upper Fl Plate Ht 9 ft
End Zone Calculations-Front to Rear Direction
.1xWidth 4.0
.4xHeight 8.5
.04xWidth 1.6 4.0
3.0 3.0
4.0 <---
End Zone Length= 4.0 ft
End Zone Calculations-Left to right Direction
.1xWidth 5.0
.4xHeight 8.5
.04xWidth 2.0 5.0
3.0 3.0
5.0 <---
End Zone Length= 5.0 ft
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L5
Bellevue,WA 98004
DR Horton Plan 3725
Wind Analysis
FRONT TO REAR DIRECTION
Building Width 40 ft
Zone 1 Zone 2 Zone 3 Zone 4
Type 1 2 1 1
End Zone y y y y
Height Width Height Width Height Width Height Width
ft ft ft ft ft ft ft ft
24.5 20 24.5 20 24.5 0 24.5 0
18.0 20 18.0 20 18.0 0 18.0 0
9.0 20 9.0 20 9.0 0 9.0 0
Type 1 =Transverse
Type 2= Longitudinal or Gable End
Wind Pressures
Zone 1 Zone 2 Zone 3 Zone 4
End Zone End Zone End Zone End Zone
4.23 5.28 12.25 15.41 4.23 5.28 4.23 5.28
12.25 15.41 12.25 15.41 12.25 15.41 12.25 15.41
12.25 15.41 12.25 15.41 12.25 15.41 12.25 15.41
Load to roof plate Vw= 4571 lb
Load to upper floor plate Vw= 4638 lb
Load to main floor plate Vw= 0 lb
Total= 9209 lb
Minimum Design Wind Loads ASCE 7-10
Total Wind Load= 7056 lb OK
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L6
Bellevue, WA 98004
DR Horton Plan 3725
Wind Analysis
LEFT TO RIGHT DIRECTION
Building Width 50 ft
Zone A Zone B Zone C Zone D
Type 2 1 1 1
End Zone y y n y
Height Width Height Width Height Width Height Width
ft ft ft ft ft ft ft ft
24.5 12.5 24.5 18 24.5 0 24.5 0
18.0 25 18.0 18 13.0 12 18.0 0
9.0 25 9.0 18 9.0 12 9.0 0
Type 1 =Transverse
Type 2= Longitudinal
Wind Pressures
Zone A Zone B Zone C Zone D
End Zone End Zone End Zone End Zone
12.25 15.41 4.23 5.28 4.23 0.00 4.23 5.28
12.25 15.41 12.25 15.41 12.25 0.00 12.25 15.41
12.25 15.41 12.25 15.41 12.25 0.00 12.25 15.41
Load to roof plate Vw= 4434 lb
Load to upper floor plate Vw= 5981 lb
Load to main floor plate Vw= 0 lb
Total= 10415 lb
Minimum Design Wind Loads ASCE 7-10
Total Wind Load= 7894 lb OK
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L7
Bellevue,WA 98004
DR Horton Plan 3725
Lateral Analysis of Seismic forces(2012 IBC)
Distribution of Building Weight
Roof Area Weight Ave. height
ft^2 psf ft
1400 13.1 18
Interior walls Wall Wt Wall Ht Wall L
psf ft ft
6.5 8 180
Exterior walls Wall Wt Wall Ht Wall L
psf ft ft
8 8 170
Upper Floor Area Weight Ave. height
ft^2 psf ft
1825 10 9
Interior walls Wall Wt Wall Ht Wall L
psf ft ft
6.5 9 120
Exterior walls Wall Wt Wall Ht Wall L
psf ft ft
8 9 180
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L8
Bellevue,WA 98004
DR Horton Plan 3725
Lateral Analysis of Seismic forces (2012 IBC)
Soil Class= D
le = 1.00
R = 6.50
Structure Height= 21.25 ft
Spectral Response Acceleration Coefficients Site Coefficients
Ss= 1.58 Fa = 1.00
S1 = 0.55 Fv= 1.50
Sms= 1.58 Sds= 1.05
Sm1 = 0.825 Sd1 = 0.55
Sesimic Design Category= D
Structure Fundamental Period= 0.20 Seconds
Cs Determination(ASCE 7)
Sds/(R/le) 0.162
Sd1/(R/le)/T 0.428
Cs= 0.162 Ultimate
Vs= 0.116 xWt
Working Stress
Distribution of Shear to Stories
Level Vs wx % Vs
Roof 3299 59384.01 0.598 4627 <---
Upper floor 4442 39981.83 0.402 3115 <---
Main floor 0 0 0.000 0 <---
Total 7742 99366 7742 lbs
Redundancy Check rho max= 1.00 Front/Rear
rho max= 1.00 Left/Right
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L9
Bellevue,WA 98004
DR Horton Plan 3725
Allowable Shearwall Forces
Typ.Walls -7/16 OSB,8d Common Nails, 1 3/8"minimum penetration into framing.
Wind Resistance(Includes 40% increase per 2306.3.1)
Allow v
P6 266 plf
P4 490 plf
P3 637 plf
P2 833 plf
Seismic Resistance(based on 2:1 height/width ratio)
Allow v
P6 242 plf
P4 350 plf
P3 455 plf
P2 595 plf
Anchor Bolts (5/8"bolts, HF plates,Allow Vw= 1.6 x 860=13761b,Vs=1.4 x 860= 12041b)
Allow Vw(plf) Vs(plf)
P6 2x sill plates 48"o.c. 344 301
P4 2x sill plates 32"o.c. 516 452
P3 2x sill plates 16"o.c. 1032 903
P2 2x sill plates 16"o.c. 1032 903
Simpson MASAP Standard Installation,Allow Vw=13051b,Vs= 1060Ib
Allow Vw(plf) Vs(plf)
P6 2x sill plates 48"o.c. 326 265
P4 2x sill plates 32"o.c. 489 398
P3 2x sill plates 16"o.c. 979 795
P2 2x sill plates 16"o.c. 979 795
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L10
Bellevue,WA 98004
DR Horton Plan 3725
Sub-diaphragms-Front/Rear
Zone 1 Zone 2 Zone 3 Zone 4
Roof 40 ft 0 ft 0 ft 0 ft
Upper 40 ft 0 ft 0 ft 0 ft
Force Distribution to Walls-Front/Rear Roof Plate Level
Sum of Walls Total
Grid 1 16 23 39
Grid 2 27 27
Grid 3 0
Grid 4 0
Grid 5 0
Trib. Vs Vw Wall Sum v Uplift
Grid 1 20.0 2313 2285 39 59 plf OK
Grid 2 20.0 2313 2285 27 86 plf OK
Grid 3 0.0 0 0 0
Grid 4 0.0 0 0 0
Grid 5 0.0 0 0 0
Totals 40 4627 4571
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid 1 0 0 0.00 1.00
Grid 2 0 0 0.00 1.00
Grid 3 0 0 0.00 1.00
Grid 4 0 0 0.00 1.00
Grid 5 0 0 0.00 1.00
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L11
Bellevue,WA 98004
DR Horton Plan 3725
Force Distribution to Walls-Front/Rear Upper Floor Plate Level
Sum of Walls Total
Grid 1 20 20
Grid 2 22 22
Grid 3 0
Grid 4 0
Grid 5 0
Trib. Vs Vw Wall Sum v Uplift
Grid 1 20.0 3871 4604 20 230 plf P6 2072
Grid 2 20.0 3871 4604 22 209 plf P6 1884
Grid 3 0.0 0 0 0
Grid 4 0.0 0 0 0
Grid 5 0.0 0 0 0
Totals 40 7742 9209
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid 1 0 0 0.00 1.00
Grid 2 0 0 0.00 1.00
Grid 3 0 0 0.00 1.00
Grid 4 0 0 0.00 1.00
Grid 5 0 0 0.00 1.00
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L12
Bellevue, WA 98004
DR Horton Plan 3725
Sub-diaphragms-Left/Right
Zone A Zone B Zone C Zone D
Roof 26 ft 15 ft 0 ft 0 ft
Upper 19 ft 20 ft 0 ft 0 ft
Force Distribution to Walls-Left/Right Roof Plate Level
Sum of Walls Total
Grid A 3.3 8.2 6.7 4 22.2
Grid B 13 13
Grid C 3 3 3 3 12
Grid D 0
Grid E 0
Trib. Vs Vw Wall Sum v Uplift
Grid A 13.0 1467 1406 22.2 66 plf OK
NDS 4.3 Ok
Grid B 20.5 2313 2217 13 178 plf P6 1424
Grid C 7.5 846 811 12 71 plf OK
NDS 4.3 Ok
Grid D 0.0 0 0 0
Grid E 0.0 0 0 0
Totals 41 4627 4434
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid A 6.7 443 0.10 1.00
Grid B 0 0 0.00 1.00
Grid C 3 212 0.05 1.00
Grid D 0 0 0.00 1.00
Grid E 0 0 0.00 1.00
10051.4 ASCE7-10.xls
Voelker Engineering, Inc. 11/20/14 Job 10051.4
1911 116th Avenue NE Page L13
Bellevue,WA 98004
DR Horton Plan 3725
Force Distribution to Walls-Left/Right Upper Floor Plate Level
Sum of Walls Total
Grid A 2.9 5.5 3.4 11.8
Grid B 8 11.5 19.5
Grid C 2.95 2.4 2.4 2.95 10.7
Grid D 0
Grid E 0
Trib. Vs Vw Wall Sum v Uplift
Grid A 9.5 2226 2863 11.8 243 plf P6 2184
NDS 4.3 P4
Grid B 19.5 3871 5208 19.5 267 plf P4 2403
Grid C 10.0 1645 2345 10.7 219 plf P6 1972
Shearwall ratio>3.5:1 NDS 4.3 P4
Grid D 0.0 0 0 0
Grid E 0.0 0 0 0
Totals 39 7742 10415
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid A 5.5 1037 0.13 1.00
Grid B 8 1588 0.21 1.00
Grid C 2.95 454 0.06 1.00
Grid D 0 0 0.00 1.00
Grid E 0 0 0.00 1.00
10051.4 ASCE7-10.xls
.JOB ..- , „,„„ ..... f...'1...,se _
VOELKER ENGINEERING, INC. 1,(/
SHEET NO. OF
1911 116th Avenue NE 7-
Bellevue,Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
. .
• ....e . .
A ,••••
?tea.. ..p)tiote......LA . - 1 ..i..:.............. .)........ .. .. ..................... •
, ...............
.•
•
7 1
Ii:
i , ., t i .•
. .
: .
i . . .
4. T •
.4 4" I. '. I a , . • t... i.......... , .....
. g
t... ..., )g.i 1ft 1 iv 4
It I ' ........_..
: I
.. ....®...' ..-r . ...,... ,-4111"1 t' .......... ..,—.1..... .... ........... . ... i . 1'
i ong....1••••• .
...- ! t • .... 0%.%. . ..i.....61.14 i 4. -,* I
. .-
i .•
I •
i i I
I I
.t 1. • i t g
I .• a 1-.. .1.- 1 • .. f
•
. ;
I ;
; t .
i ; , .•
. •
, !
.i. I
.•
t4, . .•
.•
'A. 111
•
•'k i i , .
. ! ...„
. . ,. ,. • .... ,
i 0 '
.. . .,. r I — , -.... • _ .
i r ;
-. i •... .. i
,
I• f ....
: I ,16 I .
.-1.• r. i f. i f• -
i
> I
0 i ...H. Ii.......... ;
i
. ..................
.0 i f. . .;. •.P.\! ..........;..................1 i
:
i ...4
,. , y , ItAr
, .
; *' -'
i .
! .
• i i
i :
........ ...;• . ; ... i , ..,
i .
;
; 3
. .
i , ,
i
1..... .1. •••4 ....
f• .
V. / I • \1 i
, e P .,.. ilfiNi 4',L 1„,,, 14.5 i i i• • ,
, ••• , , ..
i , ! i.• .-t .• ..-I !' t. t ! I I 1 ! T
i. .
. . .
. I
. . .
. •
. t :
: . i
e-5. •
4.. ,........5.1)::,....... -4
•
i ;
. ;
1 1
. i
1 .., ... .i.
r i•. a .;., 4-- •
S I
1 i I i I ,
: i
.
4 L.
i
i 1
I i 1 i i i i
+ 4- i •-i •
r • I- !
. !
- r-. . -.,• -.„ , , r -.1.. .1 i• e .
.
I 11i II i .
i
i
,...............,. i I.— i
; 4 .. .....;
.•
. f.
.
-
.
...,... ; ... ...:... ...1.. , ...
1 ..... -
.
. i
! i
i .1-
i ! ;
i i I i i
PRODUCT ZOO 041,5610)205-1ftldsd)
JOB !!)Q> /,
VOELKER ENGINEERING,INC. SHEET NO. Lr> OF
1911 116th Avenue NE
Bellevue,Washington 98004 CALCULATED BY DATE 7- 2/IV
425-451-4946
CHECKED BY DATE
SCALE
i • Z i 4.046/e. .
eget
f a
•
! 0 ; I
1.
i
•
C ..
f
s
,......._. ,� z w
i ; : i
a
E : : i
•
I
411/4
............,......._.._..._.................... ..._....................._........... ........j y............, .T..........................r a.. ....._._.............. ..._....
•
�N=
r
I ! 1';
AIA s
,
. '.. i..."+„ , rift. , I, ".47.: ,
,
r
............._._...._...._..........e....................................__1............. ... r....4._ _..........._..._.... __.. .. • a.. ...._ ._ .........
i w
f
I
i
€ Co ; s i
i E
i . ; i
/1.' "I''.
w
S
IS!�
�........_.._....__..a _ !fir - it_ r
HTT5
is ;
; i
!
3
;
i
f
[ E ? j
i
e !
y..
i
j E i i
: ;
3
i r
i
i
PICO=Mit Pee Snub)1 I?alb*
JOB 1dOsf
• VOELKER ENGINEERING, INC. SHEET NO. L/� OF
1911 116th Avenue NE
Bellevue, Washington 98004 CALCULATED BY DATE 4 ` <IA/2-
425-451-4946
CHECKED BY DATE
SCALE
•
A�
J
Y/' .m.te../..://4 1, f: _ .
•
:Z
,A,11#4e0,44/
a_ s. • �'
1
•
s Z -- t zv,� S36b
! 1 1,'' ; '.5' '7?/g 7- ' ,..- ; ..t. is ! ,
t
144. .tie- ,
if geeba 2, w
• z,�- �
PRODUCT 204-1(Single Sheets)20-1(Padded)
•
JOB
I 75 <
VOELKER ENGINEERING, INC. SHEET NO. OF
1911 116th Avenue NE �,
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
. . .h1..d.. r gely,A.. • {,,s..:..... .'cam 141 r... _5#05.0/V
oeto ._ .. ..
gle 04 01
Vis'
iv :. .74/
4 ,. i
Tc
s / Z ien n/VI ee,444
,CA-4= vel, ....
Lt tp$1.
67
w L S 7';--._: rt,r s•
;gip
t� A •_
..... _ .a__... �.�.t.._ ....tea.... _ _..
Ivo
f2L
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
Date:8/21/10
Selection 3-118x 9 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2001
Min Bearing Area R1=4.0 in2 R2=3.0 in2 (1.5)DL Defl= 0.20 in Recom Camber=0.31 in
Data Beam Span 7.0 ft
Beam Wt per ft 6.83# Reaction 1 TL 2584# Reaction 2 TL 1944#
Bm Wt Included 48# Maximum V 2584#
Max Moment 5799'# Max V(Reduced) 2159#
TL Max Defl L/240 TL Actual Defl L/410
Attributes Section(in3) Shear(in2) TL Defl(in)
Actual 42.19 28.13 0.20
Critical 25.21 11.73 0.35
Status OK OK OK
Ratio 60% 42% 58%
Fb(psi) Fv(psi) E(psi x mil) Fc..1_(psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2760 276 1.8 650
Adjustments Cv Volume 1.000
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft Kbe=0.0
Loads
Point TL Distance Par Unif TL Start End
B=2240 4.0 H=560 0 4.0
H
Pt loads:
R1 =2584 R2= 1944
SPAN=7 FT
Uniform and partial uniform loads are lbs per lineal ft.
e j f
JOB )tsv •
VOELKER ENGINEERING,INC. 4
SHEET NO. OF
1911 116th Avenue NE
Bellevue,Washington 98004 CALCULATED BY .
425-451-4946
CHECKED BY DATE
SCALE
. -
. i .• 1
' 1 i
,........ .........,
i ... -
.440
. 4...6....t•..........,.... kr r c •! !.
_
Feta- 1 -
.• ..•
4
.. i • , . .. .4.......4 , • . ,. .. ,. . , .
I i • t• i
- .1
1
..............1.............. ... .. . ..!. ._,..... •r 1 I **Ad? . r L, .,.. 7 -
• - ; i
--,--1
.,.. ,. ... ..........,............„... .,.. ........... ... .....
; , i 1 V e il . c • i ,
. ,
. I
, ,
I , :
• , , : ,
. .• , 1 ; ;
.. .... ....
r ...
i.... .. .. : .. ..,...... , 4 ....,... _...,............ . a r ....... .
i i 1 ..... . .. +........
...... ,. 40-1 i .• 1...........i. ...... i..... ...h /... ......... +. .• If 1 r;) ,
L 4 i 2.; > . .•
, .
.• , i I .:
,. i ti p riAir •
. . .„
•
• . •
,• ... •.,..._.. „ :
.
,
. .
. . 1 , ,
1 -
.• , •, .
. : r
I i 1 I
i 4 I
• i.
4-../..-..7. . 8 ,11--Iei-ii i.... . i.
1 :
i
,
. , , -4 .... 1 ....•
1 1• ,
I 1
! i ;
.I ............... ..... .....„*.. ..._..... I. 111.5.11 i
.. _..
I I I i le
. .
I 3 i i i
a.. .4 • ..E....-.... . .i ...t..........4
41A
i !
.• i i i
i•
r! I
, 4
. ...
! f
........... -4. •‘.
; ; !
i I I i , pft
4 .• 4. l• i
i ..,................_.. .....41 I ;
• 1 ! I I
; i 4
' - - • t
4 4 i i ;•...--- --, -•- ...-1tisc4.. i
-;'- t- •
; ! I ;
I i I
•
, ...,..).1.44.4p.....„! i • I.__ .
• , , :
i 1 i
.. .
! ....,
i f
i I .
. r
i i ..L. ... . .... .
1 i '
/ • I . i
1... .6-,r-t . Stit ..
1 . ........_
i ! i
XI .
,
! ., .............-.....
i
I I i
' I
1 1 i i
i 1
f
•
i
•••• —4 •I- .--.-----4 '
; i : I I .• "• • •
; _...
4...— - E i 3 i 1
3
3 1 I -. 4. .......I•
1
I i -- I.
I ;
I
; ; ! :
!
I i
; ; I
- Si
,........._.........., !
:
:
; I
i I 1
I I
I ; I ;
i I ;
; ; I
I I
i I
;
i
; 1 1
i !
IMODUCT WI PulefIlrbliff4(MO
k !!
/ i'b Iii
VOELKER ENGINEERING a)fZ
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879 /
r
Fear. 1'Z�w J v Cr,.
Prepared by:CV Date:7/21/10
Selection (3)2x 12 HF#2 Lu=0.0 Ft
Conditi s NDS 2005
Min Bearing Area R1=4.3 in2 R2=2.1 in2 (1.5)DL Defl= 0.85 in
Data Beam Span 19.0 ft
Beam Wt per ft 12.3# Reaction 1 TL 1754# Reaction 2 TL 854#
Bm Wt Included 234# Maximum V 1754#
Max Moment 5994'# Max V(Reduced) 1696#
TL Max Defl L/240 TL Actual Defl L/269
Attributes Section(in2) Shear(in2) TL Defl(in)
Actual 94.92 50.63 0.85
Critical 84.62 16.96 0.95
Status OK OK OK
Ratio 89% 34% 89%
Fb(psi) Fv(psi) E(psi x mil) Fci..(psi)
Values Reference Values 850 150 1.3 405
Adjusted Values 850 150 1.3 405
Adjustments CF Size Factor 1.000
Cd Duration 1.00 1.00
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform TL: 50 =A
Point TL Distance
B=1425 3.5
Uniform Load A
Pt loads:
R1 -1754
R2=854
SPAN=19 FT
Uniform and partial uniform loads are lbs per lineal ft.
Ive.5 / . 1
bei)' VOELKER ENGINEERING �r 3
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
IA‘
Prepared by:CV Date:7/21/10
Selection 2x12 HF#2@12inoc Lu=0.0Ft
Conditions NDS 2005,Repetitive Use
Min Bearing AreaR1=1.2 in2 R2=1.2 in' (1.5)DL Defl= 0.20 in
DataBeam Span 19.25 ft Reaction 1 LL 385# Reaction 2 LL 385#
Beam Wt per ft 0# Reaction 1 TL 481# Reaction 2 TL 481#
Bm Wt Included 0# Maximum V 481 #
Max Moment 2316'# Max V(Reduced) 434#
TL Max Defl L/240 TL Actual Defl L/315
LL Max Defl L/360 LL Actual Defl L/433
,Attributes Section(in') Shear(in2) TL Defl(in) LL Defl
Actual 31.64 16.88 0.73 0.53
Critical 28.43 4.34 0.96 0.64
Status OK OK OK OK
Ratio 90% 26% 76% 83%
Fb(psi) Fv(psi) E(psi x mil) Fc (psi)
Values Reference Values 850 150 1.3 405
Adjusted Values 978 150 1.3 405
Adjustments CF Size Factor 1.000
Cd Duration 1.00 1.00
Cr Repetitive 1.15
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform LL:40 Uniform IL: 50 =A
Uniform Load A
/\ /\
R1 =481
R2=48=481
SPAN=19.25 FT
Uniform and partial uniform loads are lbs per lineal ft.
JOB l UD)1` 1--
VOELKER ENGINEERING, INC. SHEET NO. elf/M OF
1911 116th Avenue NE 7'2P./0Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
5tle 1.6t. ghs . ,
, .. . +1,, , ,,i4i, ri ,
L �
o � .
ax
0,,4... t,..s. If I Id v, -:- ,,,„„r• fri '
See: a r ,) _
x ... ._. i�t..d ._i i...�'
r..
, �._ l,' .
. ,. :,
, ATi r. k.,'''.' -711 .
..
3
.6.X. C- .G 4. ..
'16'
: /02> i
................
PRODUCT 244-1(Sints eta)2 -?(P
JOB l
VOELKER ENGINEERING, INC.
SHEET NO.
~'
OF 116th Avenue NE 7•2,-/0
~BmUevum Washington 98004 CALCULATED BY DATE '
425-451-4946
CHECKED BY DATE
SCALE
(
__ ---��---' �__'-'_' _-' _ _---- --_-'----- -- _
r---
� 5 i ^� ��� �� c�^ ��a� -�--
---�------ � . --�'--'-��e_� ��w��---���� �� �����- �� u�°- 604
T� -----l--'-- ---------�-----'--'-^-----------_'-------__________�______ _____________ _____
'544,-ti‘t &Lel -ctv , /Me r ;
P-c f- vie t
� -- -- -------- -- -'-----�--- - -----� ----�-- --'-------- ----------'-� - '---�-' '------1 _'
--- ---�------- '------------�-�-------------�--------'--'-----�--�--�--r--�--�--4-_--_'____
'��`r --- ----�- ----------- -- --'_-__
load%1
ryW .}. d / VOELKER ENGINEERING
�J
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
Prepared by:CV Date:7/21/10
Selection (2)2x 12 HF#2 Lu=0.0 Ft Lu @OH=0.0 Ft
Conditions NDS 2005,Overhang
Min Bearing Area R1=0.3 in2 R2=6.2 in2 (1.5)DL Defl= -0.05 in.
Data Beam Span 12.0 ft
Beam Wt per ft 8.2# Reaction 1 TL 126# Reaction 2 TL 2520#
Bm Wt Included 121 # Maximum V 1948# Overhang Length 2.75 ft
Max Moment 2678'# Max V(Reduced) 1284# Total Beam Length 14.75 ft
TL Max Defl L/240 TL Actual Defl L/<-1000 OH TL Actual Defl L/>1000
Attributes Section(in3) Shear(in2) TL Defl(in) OH TL Defl
Actual 63.28 33.75 -0.05 0.01
Critical 32.87 11.16 0.60 0.28
Status OK OK OK OK
Ratio 52% 33% 8% 5%
Fb(psi) Fv(psi) E(psi x mil) Fci.(psi)
Values Reference Values 850 150 1.3 405
Adjusted Values 978 173 1.3 405
Adjustments CF Size Factor 1.000
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
CI Stability @ OH 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform TL: 50 =A (Uniform Ld on Backspan)
Par Unif TL Start End 1
K=700 (OH) 0 2.75
Uniform Load A 1 K
/\ /\
R1 =126 R2=2520
BACKSPAN=12 FT OH=2.75 FT
Uniform and partial uniform loads are lbs per lineal ft. Overhanging load distances are from R2.
loo5/.
VOELKER ENGINEERING eel: 7
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
3 Gd>t.-- ‘.011-1.4. Prepared by:CV Date:7/21/10
Selection 5-1/8x 22-1/2 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2005
Min Bearing Area R1=15.9 in2R2=15.9 in2 (1.5)DL Defl= 0.61 in Recom Camber-0.92 in
Data Beam Span 17.75 ft
Beam Wt per ft 28.02# Reaction 1 TL 10331# Reaction 2 TL 10361 #
Bm Wt Included 497# Maximum V 10361 #
Max Moment 71646'# Max V(Reduced) 10278#
TL Max Defl L/240 TL Actual Defl L/347
Attributes Section(in3) Shear(int) TL Deft On)
Actual 432.42 115.31 0.61
Critical 326.18 55.86 0.89
Status OK OK OK
Ratio 75% 48% 69%
Fb(psi) Fv(psi) E(psi x mil) Fc (psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2636 276 1.8 650
Adjustments Cv Volume 0.955
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads
Point TL Distance Par Unif TL Start End
B=13100 7.0 H=660 7.0 17.75
H
Pt loads:
R1 =10331 R2=10361
SPAN=17.75 FT
Uniform and partial uniform loads are lbs per lineal ft.
1.0051.
Uva .1:2)4.a)',&. elf
BeamClv2007 licensed to:Voelker Engineering Reg#8111-1879
Date:8/21/10
Selection 5-1/8x 18 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2001
Min Bearing Area R1=15.7 in2R2= 13.3 in2 (1.5)DL Defl= 0.84 in Recom Camber=1.27 in
Data Beam Span 18.0 ft
Beam Wt per ft 22.42# Reaction 1 TL 10187# Reaction 2 TL 8637#
Bm Wt Included 404# Maximum V 10187#
Max Moment 43258'# Max V(Reduced) 8443#
TL Max Deft L/240 TL Actual Defl L/256
Attributes Section(in3) Shear(in2) TL Defl(in)
Actual 276.75 92.25 0.84
Critical 192.86 45.89 0.90
Status OK OK OK
Ratio 70% 50% 94%
Fb(psi) Fv(psi) E(psi x mil) Fc.i(psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2692 276 1.8 650
Adjustments Cv Volume 0.975
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft Kbe=0.0
Loads Uniform TL: 840 =A
Point TL Distance Par Unif TL Start End
B=1200 7.0 H=300 0 7.0
H
Uniform Load A
Pt loads:
R1 =10187 R2=8637
SPAN= 18 FT
Uniform and partial uniform loads are lbs per lineal ft.
ioasl 1
et"Jetepiaaff
BeamChek v2007 G used to:Voelker Engineering Reg#8111-1879
Date:8/21/10
Selection 5-118x 21 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2001
Min Bearing Area R1= 12.9 in2R2=14.2 in2 (1.5)DL Defl= 0.67 in Recom Camber=1.00 in
Data Beam Span 18.0 ft
Beam Wt per ft 26.15# Reaction 1 TL 8358# Reaction 2 TL 9213#
Bm Wt Included 471 # Maximum V 9213#
Max Moment 62803'# Max V(Reduced) 8187#
TL Max Defl L/240 TL Actual Dell L/324
Attributes Section(in') Shear(in3) TL Defl(in)
Actual 376.69 107.63 0.67
Critical 284.36 44.50 0.90
Status OK OK OK
Ratio 75% 41% 74%
Fb(psi) Fv(psi) . E(psi x mil) Fc L(psi)
Values Reference Values 2400 240 1.8 650
Adjusted Values 2650 276 1.8 650
Adjustments Cv Volume 0.960
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft Kbe=0.0
Loads Uniform TL: 100 =A
Point TL' Distance Par Unif TL Start End
B= 10700 8.0 H=460 8.0 18.0
H
Uniform Load A
Pt loads: C
R1 =8358 R2=9213
SPAN=18 FT
Uniform and partial uniform loads are lbs per lineal ft.
JOB
VOELKER ENGINEERING, INC. SHEET NO. G(SlO - OF_
1911 116th Avenue NE //, /. a
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
12e v%, / v.)k.._ 41Si/e Vete,649%
Le d /44 7,4ie u•. ...__ //55." )'e• 5try , _._ .ea..._
�. 117 . _. .
nn �j
GI C +r/ ,11
U
Vis.. .. $;V - 4.
.51,0 4zA
V f ..
f !Z.. fi .�
2 )
7........._.... .................... .............. .......... .. ............... .............. .. .............. .
42414/
t 7 c ""7 44,4> fly ,
• T
•
12- 1
Voelker Engineering, Inc. 05/12/12 Job# 10051.4
Simple span beams Sheet UF1 1
Roof beam in front of garage 3 1/2x12 GLB
Length = 16.4 ft Width = 3.500 in LL/TL= 0.63
Load = 140 plf Depth = 12.000 in LL DUR. = 1.15
Pt load = 0 lb E = 1800 ksi
R= 1148 lb V @ d = 1008 lb
M= 4707 lb-ft
fb = 672 psi< OK 2760 TL Defl. = 0.30 in L/ 661
fv= 36 psi< OK 276 LL Defl. = 0.16 in L/ 1,244
Support 0.8 in
Floor beam at front of garage 5 1/2x18 GLB
Length = 20.75 ft Width = 5.500 in LL/TL = 0.80
Load = 700 plf Depth = 18.000 in LL DUR. = 1.00
Pt load = 0 lb E = 1800 ksi
R= 7263 lb V@ d = 6213 lb
M= 37674 lb-ft
fb = 1595 psi< OK 2400 TL Defl. = 0.67 in L/ 373
fv = 94 psi< OK 240 LL Defl. = 0.49 in L/ 513
Support 3.3 in
I
JOB lUy ; lel .
VOELKER ENGINEERING, INC. SHEET NO. /1 f 1 OF
1911 116th Avenue NE 11.Z1-V()
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
1„ t b /-
ti /
as
r10 "
. ...,1,11 .... . z
l
7• .5.b'
4.14/° ' f I,4 /$0.
y
Ase
PRODUCT 2041 Mille Sheets)2051
x
Voelker Engineering 05/12/12 Job# 10051.4
Sheet Si
2009 IBC-2005 NDS
Wood Stud Design Ver 3.2 VE2009
INPUT
Axial P D = 280.0 (lb/ft) HF Stud:
Axial P L= 1.0 (lb/ft) E = 1200 (psi) c= 0.80
Axial P S= 460.0 (Ib/ft) Fc= 800 (psi) COVe= 0.25
Wind w= 15.0 (psf) Fb= 675 (psi) Emin= 438
Stud B = 3.00 (in)
Stud D = 3.50 (in)
Spacing = 1.33 (ft oc)
KL = 12.00 (ft)
OUTPUT
A= 10.50 (inA2) F*c= 920 (psi) KL/D = 41.14
I = 10.72 (in^4) F*b = 1013 (psi) Fce = 213
S = 6.13 (inA3) F'c= 202 (psi) Cp= 0.219
Case D+.75W+.75L+.75S
Load per Stud: Computed Stress:
P = 832.2 (lbs) fc= 79 (psi)
M = 359.1 (lb-ft) fb = 704 (psi)
Combined Axial and Bending Loads Axial^2 + Bending =Total
0.15 1.11 1.26 < 1.6 O.K.
fc/Fce = 0.37 < 1.6 O.K.
Case D+W
Load per Stud: Computed Stress:
P = 372.4 (lbs) fc= 35 (psi)
M = 359.1 (lb-ft) fb = 704 (psi)
Combined Axial and Bending Loads Axial^2 + Bending =Total
0.03 0.83 0.86 < 1.6 O.K.
fc/Fce = 0.17 < 1.6 O.K.
Case D+L+S
Load per Stud: Computed Stress:
P = 985.5 (lbs) fc= 94 (psi)
Axial Loading only, no bending fc/F'c = 0.47 < 1 O.K.
Deflection at midspan = 0.72 (in) L/ 199
full wind load
•
Voelker Engineering 05/12/12 Job# 10051.4
Sheet S2
2009 IBC-2005 NDS
Wood Stud Design Ver 3.2 VE2009
INPUT
Axial P D = 280.0 (lb/ft) HF Stud:
Axial P L = 1.0 (lb/ft) E = 1200 (psi) c= 0.80
Axial P S = 460.0 (lb/ft) Fc= 800 (psi) COVe= 0.25
Wind w= 15.0 (psf) Fb = 675 (psi) Emin= 438
Stud B = 1.50 (in)
Stud D = 3.50 (in)
Spacing = 1.33 (ft oc)
KL = 9.00 (ft)
OUTPUT
A= 5.25 (inA2) F*c= 920 (psi) KL/D = 30.86
I = 5.36 (inA4) F*b = 1013 (psi) Fce= 378
S = 3.06 (in^3) F'c= 339 (psi) Cp= 0.368
Case D+.75W+.75L+.75S
Load per Stud: Computed Stress:
P = 832.2 (lbs) fc= 159 (psi)
M = 202.0 (lb-ft) fb = 791 (psi)
Combined Axial and Bending Loads Axial^2 + Bending =Total
0.22 1.35 1.56 < 1.6 O.K.
fc/Fce = 0.42 < 1.6 O.K.
Case D+W
Load per Stud: Computed Stress:
P = 372.4 (lbs) fc= 71 (psi)
M = 202.0 (lb-ft) fb = 791 (psi)
Combined Axial and Bending Loads Axial^2 + Bending =Total
0.04 0.96 1.01 < 1.6 O.K.
fc/Fce = 0.19 < 1.6 O.K.
Case D+L+S
Load per Stud: Computed Stress:
P = 985.5 (lbs) fc= 188 (psi)
Axial Loading only, no bending fc/F'c = 0.55 < 1 O.K.
Deflection at midspan = 0.46 (in) U 236
full wind load