Loading...
Permit (87) CITY OF TIGARD BUILDING PERMIT u4--- u ..'- COMMUNITY DEVELOPMENT Permit#: BUP2017-00219 TF GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/30/2017 Parcel: 1 S 1260000300 Jurisdiction: Tigard Site address: 9321 SW WASHINGTON SQUARE RD T05 Project: Tesla Subdivision: None Lot: None Project Description: Tenant improvement with exterior storefront modification. Work includes partitions,millwork,ceilings,finishes,and restrooms. Contractor: TERRY ADAMS INC Owner: PPR WASHINGTON SQUARE LLC 111 S MULBERRY ST STE 101 PO BOX 847 ELIZABETHTOWN, KY 42701 CARLSBAD, CA 92018 PHONE: 270-769-0859 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 10/30/2017 $4,794.45 Demolition Occupancy Grp: M Occupancy Load: 95 12%State Surcharge-Building 10/30/2017 $575.33 Dwelling Units: Plan Review 08/07/2017 $3,116.39 Stories: Height: ft DC Provision Review,COM TI-Ping 10/30/2017 $361.00 Bedrooms: Bathrooms: Plan Review-Fire Life Safety 10/30/2017 $1,917.78 Value: $750,000 Info Process/Archiving-Lg$2.00(over 10/30/2017 $74.00 11x17) Info Process/Archiving-Sm$0.50(up to 10/30/2017 $7.50 Floor Areas: 11x17) Metro Const.Excise Tax 10/30/2017 $900.00 Total Area: 3480 Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $11,746.45 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set \(Orth in OAR 952-001-0010 through OAR 952-001-0090. You ay obtain a copy of the rules orordirect questions to OUNC by c- -: : . .1987 or 1.800.3 44. \ Issued By: i' e/ i./ Permittee S' nature: �/ —+ i . ��� Call 503.639.4175 by 7:00 a.m.for the next av ' ection date. /_ This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Bailding Permit Application Commercial FOR OFFICE I`SE ON LI City of Tigard Received 13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: Y. 7/7 Permit No.: Plan • - ar-- L'11` 6i l�' / , IN n Phone: 503.718.2439 Fax: 503.598.1' ' Date/By:,i' 6 k Other Permit /�r� TIGARD Inspection Line: 503.639.4175 +^ �mLltvl'7- 7 Date Reay;y: 7uds: I H See Page l for Internet: www.tigard-or.gov tified/Met d: / ��? ��� Supplemental Information TYPE OF WORIA U G 7 2017 RE 1 IRED DATA:1-AND 2-FAMILY DWELLING ❑New construction . OF TIGARD Permit fees*are based on the value of the work performed. (rounded to the nearest Indicate the valueof all ®Addition/alteration/replacement II Si, -, dollar) •.I :�' ��� �� equipment,materials,labor,overhead,and the profit for the CATEGORY OF C: ' • i O 1work indicated on this application. ❑ 1-and 2-family dwelling l5 Commercial/industrial Valuation: $ ClAccessory building 0 Multi-family Number of bedrooms: ❑Master builder ®Other:TI Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:9321 SW Washington Sq.Rd. New dwelling area: square feet City/State/ZIP:Tigard,Oregon 97223 Garage/carport area: square feet Suite/bldg./apt.no.:T05 Project name:Tesla Motors Covered porch area: square feet Cross street/directions to job site:SW Greenburg Rd Deck area: square feet Hwy 217 to SW Greenburg Rd.to SW Washington Sq.Rd. Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all DESCRIPTION OF WORK equipment,materials,labor,overhead,and the profit for the work indicated on this application. `N, Remodel of an existing retail space for a new electric car sales showroom.Cars Valuation: $$750,000.00 VExisgas powered,work includes partitions,millwork,ceilings,finishes,electrical ting building area: 3480 square feet &lighting,plumbing&HVAC&restrooms. New building area: 3480 square feet 0 PROPERTY OWNER ® TENANT Number of stories: 1 Name:Tesla Motors Type of construction: I1-B ‘v Address:45500 Fremont Blvd. Occupancy groups: i City/State/ZIP:Fremont,CA.94538 Existing: M Phone:( ) Fax:( ) New: M 0 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Property Service (Please refer to fee schedule) Contact name:Gary Palmer Structural plan review fee(or deposit): Address:PO Box 23534 FLS plan review fee(if applicable): City/State/ZIP:Eugene,Oregon 97402 Total fees due upon application: , � /4 ' Phone:(541)603-4191 Fax::( ) Amount received: E-mail:psexpediting@aim.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:To Be Determined 7'.il) /YC6lit4 S Submit two(2)sets of roof plan with connection details Address: ® te' and fire department access,along with the 2010 Oregon l S ,tit f/L tyre s7 c Jo/ Solar Installation Specialty Code checklist. City/State/ZIP: v Permit fee(includes plan review �`/'Z4be77l7vwi, l� -727oif Phone:(a 20 76, ,U F Fax:( ) and administrative fees): $180.00 (� c / y/ State surcharge(12%of permit fee): $21.60 CCB lic.: ad7�.(f P ` 2 / ! lam`/ — Total fee due upon application: $201.60 Authorized signature:_y This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Gary Palmer Date: * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) 11P4 o Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 1,170,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 292,500 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ Fully Acce (b) An accessible entrance: $ Fuly Acces (c) An accessible route to the altered area: $ Fully Acce (d) At least one accessible restroom for each sex or a single unisex restroom: $ Fully Acce (e) Accessible telephones: $ Fully Acce (0 Accessible drinking fountains:and, $ Fully Acce (g) When possible,additional accessible elements such as storage and alarms: $ Fully Acce TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 RE:Tesla https://mail.aol.com/webmail-std/en-us/PrintMessag From: Kenny Marina<kenny@acies.net> To: Sarika Handique<sarikah@mbharc h.com> Cc: Suhita Saha<SuhitaS@mbharch.com>;Gary Palmer/Property Service<psexpediting@aim.com> Subject: RE:Tesla Date: Fri,Aug 4,2017 1:41 pm Electrical Relocation of existing electrical panels,disconnect switch, and transformer. New branch circuits for new tenant improvement. New lighting and lighting controls. Plumbing Relocation of existing restroom, one-to-one replacement of existing plumbing fixtures with new. New insta-hot water heater. New condensate piping for mechanical units. Mechanical (just in case you need it too) Relocation of existing air-handler unit and duct heater.Addition of(1) new air-handler unit and (1)external duct heater for offices/back of house area.Addition of(1) ductless split system for IT room. New distribution ductwork. New exhaust fan for restroom. Let me know if there are any questions,or if there's anything else you need. Thanks, ACIES ENGINEERING Kenny Marina PROJECT MANAGER kenny@acies.net www.acies.net 3371 Olcott Street Santa Clara,CA 95054 T:(408)522-5255 x305 F:(408)522-5260 VISION•CLARITY•FOCUS•CREATIVITY From: Sarika Handique [mailto:sarikah@mbharch.com] Sent: Friday, August 04, 2017 9:47 AM To: Kenny Marina Cc: Suhita Saha; Gary Palmer/ Property Service Subject: RE:Tesla Kenny, Would you follow up on the following? I of 8/4/17,5:55 PM IIICity of Tigard 1 " COMMUNITY DEVELOPMENT DEPARTMENT T1cARD Building Permit Review — Commercial.- With Land Use Building Permit #: 8,,,,„,-7 _,D,Iirt Site Address: O132 S � 4(tc,tvii & uaP (_Suite/Bldg#:TQ5 Project Name: in (1Ve, (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review. Proposal: -EX— 0.4,`1(2 1M p tig l+s 42)“Sfi i,Aki14i h I X Verify site address/suite# exists and active in permit system. ,River Terrace Neighborhood: ❑ Yes „4 No X Land Use Case#: VI MP2O 11_COO AC-Plans Match Approved Land Use: 14* Site Plan OM Landscape Plan ❑ Other: Ng_ Urban Forestry Plan i4 Elevation Plan N Fie Building Height: Maximum Height N/4 Actual Height r! f/. MI Conditions Met:N b ep- tl-i, Prior to Submittal OVA.Prior to Permit Issuance Business License: Exists: A Yes ❑ No,applicant notified to obtain business license Public Facilities Improvement (PFI) Permit: Required: ❑ Yes,applicant was notified No Applied For: El Yes ❑ No,stop intake Notes: Approved by Planning: *rmtiii 4(44- Date: S l i/i 7 Revisions (after Building Submitta nly) Reviewer Date Revision 1: ❑ Approved El Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved El Not Approved Building Permit Submittal Original Submittal Date: tr4 7 Site Plans: # Building Plans: # 3 Building Permit#: rnte`r building permit#above. Workflow Routing: l Planning Engineering GLPt mit Coordinator s ding Workflow Sign-off: C'Sign-off for Planning(include notes from planning review) Route Application Documents: [iding: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 7 I:\Building\Forms\BldgPennitRvw COM_WithLandUse 060116.docx Engineering Review �p,�►�Q- ❑ Slope at building pad: ��d�'�D�0 . 0 ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per enginng conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality F--'in-lieu: ❑ Yes ❑ No Assess Water Qu. . ity Fee in-lieu: ❑ Yes ❑ No LIDA Fac on lot: ❑ Yes ❑ No ❑ NOT ' pproved by Engineering: Date es: ApprovedEngineering: ,4 Date: ` !"�, PP Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ''1/A Tigard Trans SDC: ❑ Yes S /A Parks SDC: ❑ Yes OK to Issue Permit poN/A 7 ,/� /4--- Approved by Permit Coordinator: Date: '5/ I:\BuildingForms\BldgPennitRvw_COM_WithLandUse_070915.docx City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 9321 SW WASHINGTON SQUARE RD T05, TIGARD, OR, 97223 Record Type: Record ID: Commercial - Building BUP2017-00219 Inspection Type: Inspector: 299 Final inspection Jeff Grove Result: PASS - CofO Comments: Violation Summary: Inspector Contractor