Permit (87) CITY OF TIGARD BUILDING PERMIT
u4--- u
..'- COMMUNITY DEVELOPMENT Permit#: BUP2017-00219
TF GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 10/30/2017
Parcel: 1 S 1260000300
Jurisdiction: Tigard
Site address: 9321 SW WASHINGTON SQUARE RD T05
Project: Tesla Subdivision: None Lot: None
Project Description: Tenant improvement with exterior storefront modification. Work includes partitions,millwork,ceilings,finishes,and
restrooms.
Contractor: TERRY ADAMS INC Owner: PPR WASHINGTON SQUARE LLC
111 S MULBERRY ST STE 101 PO BOX 847
ELIZABETHTOWN, KY 42701 CARLSBAD, CA 92018
PHONE: 270-769-0859 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 10/30/2017 $4,794.45
Demolition
Occupancy Grp: M Occupancy Load: 95 12%State Surcharge-Building 10/30/2017 $575.33
Dwelling Units: Plan Review 08/07/2017 $3,116.39
Stories: Height: ft DC Provision Review,COM TI-Ping 10/30/2017 $361.00
Bedrooms: Bathrooms: Plan Review-Fire Life Safety 10/30/2017 $1,917.78
Value: $750,000 Info Process/Archiving-Lg$2.00(over 10/30/2017 $74.00
11x17)
Info Process/Archiving-Sm$0.50(up to 10/30/2017 $7.50
Floor Areas: 11x17)
Metro Const.Excise Tax 10/30/2017 $900.00
Total Area: 3480
Accessory Struct:
Basement:
Carport:
Covered Porch:
Deck:
Garage:
Mezzanine:
Total $11,746.45
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set \(Orth in OAR
952-001-0010 through OAR 952-001-0090. You ay obtain a copy of the rules orordirect questions to OUNC by c- -: : . .1987 or 1.800.3 44. \
Issued By: i' e/ i./ Permittee S' nature: �/ —+
i . ���
Call 503.639.4175 by 7:00 a.m.for the next av ' ection date. /_
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Bailding Permit Application
Commercial FOR OFFICE I`SE ON LI
City of Tigard Received
13125 SW Hall Blvd.,Tigard,OR 97223 Date/By: Y. 7/7 Permit No.:
Plan • - ar-- L'11` 6i l�' / ,
IN n Phone: 503.718.2439 Fax: 503.598.1' ' Date/By:,i' 6 k Other Permit /�r�
TIGARD
Inspection Line: 503.639.4175 +^ �mLltvl'7- 7
Date Reay;y: 7uds: I H See Page l for
Internet: www.tigard-or.gov tified/Met d: / ��? ��� Supplemental Information
TYPE OF WORIA U G 7 2017 RE 1 IRED DATA:1-AND 2-FAMILY DWELLING
❑New construction . OF TIGARD Permit fees*are based on the value of the work performed.
(rounded to the nearest
Indicate the valueof all
®Addition/alteration/replacement II Si, -, dollar)
•.I :�' ��� �� equipment,materials,labor,overhead,and the profit for the
CATEGORY OF C: ' • i O
1work indicated on this application.
❑ 1-and 2-family dwelling l5 Commercial/industrial Valuation: $
ClAccessory building 0 Multi-family Number of bedrooms:
❑Master builder ®Other:TI Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:9321 SW Washington Sq.Rd. New dwelling area: square feet
City/State/ZIP:Tigard,Oregon 97223 Garage/carport area: square feet
Suite/bldg./apt.no.:T05 Project name:Tesla Motors Covered porch area: square feet
Cross street/directions to job site:SW Greenburg Rd Deck area:
square feet
Hwy 217 to SW Greenburg Rd.to SW Washington Sq.Rd.
Other structure area: square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot no.: Permit fees*are based on the value of the work performed.
Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all
DESCRIPTION OF WORK
equipment,materials,labor,overhead,and the profit for the
work indicated on this application.
`N,
Remodel of an existing retail space for a new electric car sales showroom.Cars Valuation: $$750,000.00
VExisgas powered,work includes partitions,millwork,ceilings,finishes,electrical
ting building area: 3480 square feet
&lighting,plumbing&HVAC&restrooms. New building area: 3480 square feet
0 PROPERTY OWNER ® TENANT Number of stories: 1
Name:Tesla Motors Type of construction: I1-B
‘v Address:45500 Fremont Blvd.
Occupancy groups:
i City/State/ZIP:Fremont,CA.94538
Existing: M
Phone:( ) Fax:( )
New: M
0 APPLICANT
® CONTACT PERSON BUILDING PERMIT FEES*
Business name:Property Service (Please refer to fee schedule)
Contact name:Gary Palmer Structural plan review fee(or deposit):
Address:PO Box 23534 FLS plan review fee(if applicable):
City/State/ZIP:Eugene,Oregon 97402 Total fees due upon application: , � /4 '
Phone:(541)603-4191 Fax::( ) Amount received:
E-mail:psexpediting@aim.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
CONTRACTOR Commercial and residential prescriptive installation of
roof-top mounted Photo Voltaic Solar Panel System.
Business name:To Be Determined 7'.il) /YC6lit4 S
Submit two(2)sets of roof plan with connection details
Address: ® te' and fire department access,along with the 2010 Oregon
l S ,tit f/L tyre s7 c Jo/ Solar Installation Specialty Code checklist.
City/State/ZIP: v Permit fee(includes plan review
�`/'Z4be77l7vwi, l� -727oif
Phone:(a 20 76, ,U F Fax:( ) and administrative fees): $180.00
(� c / y/ State surcharge(12%of permit fee): $21.60
CCB lic.: ad7�.(f P ` 2 / ! lam`/ —
Total fee due upon application: $201.60
Authorized signature:_y This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Gary Palmer Date: * Fee methodology set by Tri-County Building Industry
Service Board.
I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB)
11P4
o Building Division
Accessibility: Barrier Removal Improvement Plan
TIGARD
REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five per-cent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 1,170,000
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 292,500
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $ Fully Acce
(b) An accessible entrance: $ Fuly Acces
(c) An accessible route to the altered area: $ Fully Acce
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ Fully Acce
(e) Accessible telephones: $ Fully Acce
(0 Accessible drinking fountains:and, $ Fully Acce
(g) When possible,additional accessible elements such as storage and
alarms: $ Fully Acce
TOTAL(shall equal line [2] of Valuation Computation): $
I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011
RE:Tesla https://mail.aol.com/webmail-std/en-us/PrintMessag
From: Kenny Marina<kenny@acies.net>
To: Sarika Handique<sarikah@mbharc h.com>
Cc: Suhita Saha<SuhitaS@mbharch.com>;Gary Palmer/Property Service<psexpediting@aim.com>
Subject: RE:Tesla
Date: Fri,Aug 4,2017 1:41 pm
Electrical
Relocation of existing electrical panels,disconnect switch, and transformer. New branch circuits for new tenant
improvement. New lighting and lighting controls.
Plumbing
Relocation of existing restroom, one-to-one replacement of existing plumbing fixtures with new. New insta-hot
water heater. New condensate piping for mechanical units.
Mechanical (just in case you need it too)
Relocation of existing air-handler unit and duct heater.Addition of(1) new air-handler unit and (1)external duct
heater for offices/back of house area.Addition of(1) ductless split system for IT room. New distribution ductwork.
New exhaust fan for restroom.
Let me know if there are any questions,or if there's anything else you need.
Thanks,
ACIES ENGINEERING
Kenny Marina
PROJECT MANAGER
kenny@acies.net
www.acies.net
3371 Olcott Street
Santa Clara,CA 95054
T:(408)522-5255 x305
F:(408)522-5260
VISION•CLARITY•FOCUS•CREATIVITY
From: Sarika Handique [mailto:sarikah@mbharch.com]
Sent: Friday, August 04, 2017 9:47 AM
To: Kenny Marina
Cc: Suhita Saha; Gary Palmer/ Property Service
Subject: RE:Tesla
Kenny,
Would you follow up on the following?
I of 8/4/17,5:55 PM
IIICity of Tigard 1
" COMMUNITY DEVELOPMENT DEPARTMENT
T1cARD Building Permit Review — Commercial.- With Land Use
Building Permit #: 8,,,,„,-7 _,D,Iirt
Site Address: O132 S � 4(tc,tvii & uaP (_Suite/Bldg#:TQ5
Project Name: in (1Ve,
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review.
Proposal: -EX— 0.4,`1(2 1M p tig l+s 42)“Sfi i,Aki14i h I
X Verify site address/suite# exists and active in permit system.
,River Terrace Neighborhood: ❑ Yes „4 No
X Land Use Case#: VI MP2O 11_COO
AC-Plans Match Approved Land Use:
14* Site Plan OM Landscape Plan ❑ Other:
Ng_ Urban Forestry Plan i4 Elevation Plan
N Fie Building Height: Maximum Height N/4 Actual Height r! f/.
MI Conditions Met:N b ep- tl-i, Prior to Submittal OVA.Prior to Permit Issuance
Business License:
Exists: A Yes ❑ No,applicant notified to obtain business license
Public Facilities Improvement (PFI) Permit:
Required: ❑ Yes,applicant was notified No Applied For: El Yes ❑ No,stop intake
Notes:
Approved by Planning: *rmtiii 4(44- Date: S l i/i 7
Revisions (after Building Submitta nly) Reviewer Date
Revision 1: ❑ Approved El Not Approved
Revision 2: El Approved ❑ Not Approved
Revision 3: ❑ Approved El Not Approved
Building Permit Submittal
Original Submittal Date: tr4 7
Site Plans: #
Building Plans: # 3
Building Permit#: rnte`r building permit#above.
Workflow Routing: l Planning Engineering GLPt mit Coordinator s ding
Workflow Sign-off: C'Sign-off for Planning(include notes from planning review)
Route Application Documents: [iding: original permit application,site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: 7
I:\Building\Forms\BldgPennitRvw COM_WithLandUse 060116.docx
Engineering Review �p,�►�Q-
❑ Slope at building pad: ��d�'�D�0 . 0
❑ PFI Permit#:
❑ Conditions "Met"prior to issuance of building permit
❑ Easements (encroachments)per enginng conditions of approval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality F--'in-lieu: ❑ Yes ❑ No
Assess Water Qu. . ity Fee in-lieu: ❑ Yes ❑ No
LIDA Fac on lot: ❑ Yes ❑ No
❑ NOT ' pproved by Engineering: Date
es:
ApprovedEngineering: ,4 Date: ` !"�,
PP
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ''1/A
Tigard Trans SDC: ❑ Yes S /A
Parks SDC: ❑ Yes
OK to Issue Permit poN/A
7 ,/� /4---
Approved by Permit Coordinator: Date: '5/
I:\BuildingForms\BldgPennitRvw_COM_WithLandUse_070915.docx
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223 Tel: 503.718.2439
Location: Inspection Date:
9321 SW WASHINGTON SQUARE RD T05,
TIGARD, OR, 97223
Record Type: Record ID:
Commercial - Building BUP2017-00219
Inspection Type: Inspector:
299 Final inspection Jeff Grove
Result:
PASS - CofO
Comments:
Violation Summary:
Inspector Contractor