Specifications (13) Voelker Engineering, Inc.
1911 116th Avenue NE, Suite 101, Bellevue, WA 98004 425.451.4946
DR Horton Plan 3724
STRUCTURAL CALCULATIONS
November 24, 2014
JN 28065.1
Building Code: 2014 OSSC
Snow: 25psf
Roof Dead load: 15psf
Floor Live load: 40psf
Floor Dead load: lOpsf
Wind: 120mph Exposure B
Seismic: Soil class D
Spectral Response Coefficients
Ss = 1.58, S1 = .55
INDEX PAGES
Lateral analysis L1-21
Roof framing R1-2
Upper floor framing UF1-9
Main floor framing MF1-3
Balloon studs W1
•
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L1
Bellevue,WA 98004
DR Horton Plan 3724
Lateral Analysis of Wind forces (ASCE 7-10, 2012 IBC)
Design wind pressures and forces are determined per equations given in section 28.4-1
System Type Structure Type Equation
Main Wind-Force Low-Rise Buildings p : gh•[(GCpf)-(GCpi)]
Resisting System Gable Roof qh : at mean roof height h
GCpf : Figure 28.4-1
GCpi :Table 26.11-1
Velocity Pressure Calculations, qh
Velocity pressure qh is calculated in accordance with section 28.3.2.
qh=Velocity pressure @ mean roof height(h)
qh=Constant• Kh • Kzt• Kd • V2
qh =Velocity pressure @ height(h)
Where : Constant = Numerical constant
'/ • [(Air density lb/cult)/(32.2ft/s2)]-
[(mi/h )(5280 ft/mi )• (1 hr/3600 s )]2
0.00256
Mean Sea Level = 0.00 ft
Air Density @ MSL = 0.0765 lb/cul
Category = II
Exposure Category = B (Urban areas)
Alpha = 7
Zg = 1,200.00 ft
Basic Wind Speed = 120.00 mph
Mean Roof Height = 25.00 ft
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L2
Bellevue,WA 98004
DR Horton Plan 3724
Velocity Pressure Calculations, qz(Cont.)
Where : Kh = Velocity pressure coefficient @ height z
= 2.01•(Z/Zg)A(2/Alpha)for 15 ft<=Z<=Zg
= 2.01 • (15/Zg)^(2/Alpha)for Z< 15 ft
= 0.7
Kzt = Topographic factor obtained from Fig.6-4
(1 + K1 • K2 • K3)2
Kzt@h = 1
Kd = Wind directionality factor obtained from Table 6-4
= 0.85
qh = 21.95 (psf)
Internal Pressure Coefficient,GCpi,TABLE 26.11-1
Enclosure Classification GCpi+ GCPi- Ri GCpi+ GCPi-
Partially enclosed buildings 0.55 -0.55 1 0.55 -0.55
Roof Angle 22.5 degrees
External Pressure Coefficient-Load Case A
(psf) (psf) (Psf)
1 0.54 21.95 0.55 -0.55 -0.27 23.88
2 -0.45 21.95 0.55 -0.55 -22.04 2.1
3 -0.47 21.95 0.55 -0.55 -22.32 1.82
4 -0.41 21.95 0.55 -0.55 -21.17 2.98
1E 0.77 21.95 0.55 -0.55 4.86 29
2E -0.72 21.95 0.55 -0.55 -27.86 -3.71
3E -0.65 21.95 0.55 -0.55 -26.3 -2.15
4E -0.6 21.95 0.55 -0.55 -25.2 -1.06
p+ uses GCpi+ p-uses GCpi-
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L3
Bellevue, WA 98004
DR Horton Plan 3724
External Pressure Coefficient-Load Case B
1 -0.45 21.95 0.55 -0.55 -21.95 2.2
2 -0.69 21.95 0.55 -0.55 -27.22 -3.07
3 -0.37 21.95 0.55 -0.55 -20.2 3.95
4 -0.45 21.95 0.55 -0.55 -21.95 2.2
5 0.4 21.95 0.55 -0.55 -3.29 20.85
6 -0.29 21.95 0.55 -0.55 -18.44 5.71
1E -0.48 21.95 0.55 -0.55 -22.61 1.54
2E -1.07 21.95 0.55 -0.55 -35.56 -11.42
3E -0.53 21.95 0.55 -0.55 -23.71 0.44
4E -0.48 21.95 0.55 -0.55 -22.61 1.54
5E 0.61 21.95 0.55 -0.55 1.32 25.47
6E -0.43 21.95 0.55 -0.55 -21.51 2.63
Wind Pressure Zones-Sums of positive and negative pressures
Transverse Direction
Load Horizontal Pressures
Case A B C D
1 18.04 2.72 12.54 1.61
Longitudinal Direction
Load Horizontal Pressures
Case A B C D
1 18.04 2.72 12.54 1.61
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L4
Bellevue, WA 98004
DR Horton Plan 3724
Light Wood Frame Construction? V
Mean Roof Height 22 ft
Maximum Height 26 ft
Building Width 32 ft
Building Length 48 ft
Roof Plate Ht 18 ft
Upper FI Plate Ht 9 ft
End Zone Calculations-Front to Rear Direction
.1xWidth 3.2
.4xHeight 8.8
.04xWidth 1.3 3.2
3.0 3.0
3.2 <--
End Zone Length = 3.2 ft
End Zone Calculations -Left to right Direction
.1xWidth 4.8
.4xHeight 8.8
.04xWidth 1.9 4.8
3.0 3.0
4.8 <---
End Zone Length = 4.8 ft
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L5
Bellevue,WA 98004
DR Horton Plan 3724
Wind Analysis
FRONT TO REAR DIRECTION
Building Width 32 ft
Zone 1 Zone 2 Zone 3 Zone 4
Type 2 2 1 1
End Zone y y y y
Height Width Height Width Height Width Height Width
ft ft ft ft ft ft ft ft
26.0 8 26.0 8 26.0 0 26.0 0
18.0 16 18.0 16 18.0 0 18.0 0
9.0 16 9.0 16 9.0 0 9.0 0
Type 1 =Transverse
Type 2= Longitudinal or Gable End
Wind Pressures
Zone 1 Zone 2 Zone 3
Zone 4
End Zone End Zone End Zone End Zone
12.54 18.04 12.54 18.04 1.61 2.72 1.61 2.72
12.54 18.04 12.54 18.04 12.54 18.04 12.54 18.04
12.54 18.04 12.54 18.04 12.54 18.04 12.54 18.04
Load to roof plate Vw= 3851 lb
Load to upper floor plate Vw= 3928 lb
Load to main floor plate Vw= 0 lb
Total= 7779 lb
Minimum Design Wind Loads ASCE 7-10
Total Wind Load= 5376 lb OK
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L6
Bellevue,WA 98004
DR Horton Plan 3724
Wind Analysis
LEFT TO RIGHT DIRECTION
Building Width 48 ft
Zone A Zone B Zone C Zone D
Type 1 2 2
1
End Zone y n y y
Height Width Height Width Height Width Height Width
ft ft ft ft ft ft ft ft
23.0 12 24.0 16 28.0 11 26.0 0
18.0 12 18.0 16 18.0 22 18.0 0
9.0 12 9.0 16 9.0 22 9.0 0
Type 1 =Transverse
Type 2= Longitudinal
Wind Pressures
Zone A Zone B Zone C Zone D
End Zone End Zone End Zone End Zone
1.61 2.72 12.54 0.00 12.54 18.04 1.61 2.72
12.54 18.04 12.54 0.00 12.54 18.04 12.54 18.04
12.54 18.04 12.54 0.00 12.54 18.04 12.54 18.04
Load to roof plate Vw= 6029 lb
Load to upper floor plate Vw= 6118 lb
Load to main floor plate Vw= 0 lb
Total= 12147 lb
Minimum Design Wind Loads ASCE 7-10
Total Wind Load = 8746 lb OK
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L7
Bellevue, WA 98004
DR Horton Plan 3724
Lateral Analysis of Seismic forces (2012 IBC)
Distribution of Building Weight
Roof Area Weight Ave. height
ft^2 psf ft
1700 12.6 18
Interior walls Wall Wt Wall Ht Wall L
psf ft ft
6.5 8 180
Exterior walls Wall Wt Wall Ht Wall L
psf ft ft
8 8 160
Upper Floor Area Weight Ave. height
ft^2 psf ft
1440 10 9
Interior walls Wall Wt Wall Ht Wall L
psf ft ft
6.5 9 75
Exterior walls Wall Wt Wall Ht Wall L
psf ft ft
8 9 156
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L8
Bellevue, WA 98004
DR Horton Plan 3724
Lateral Analysis of Seismic forces (2012 IBC)
Soil Class= D
le = 1.00
R = 6.50
Structure Height= 22 ft
Spectral Response Acceleration Coefficients Site Coefficients
Ss= 1.58 Fa = 1.00
S1 = 0.55 Fv= 1.50
Sms= 1.58 Sds= 1.05
Sm1 = 0.825 Sd1 = 0.55
Sesimic Design Category= 0
Structure Fundamental Period= 0.20 Seconds
Cs Determination (ASCE 7)
Sds/(R/le) 0.162
Sd1/(R/le)/T 0.417
Cs= 0.162 Ultimate
Vs= 0.116 xWt
Working Stress
Distribution of Shear to Stories
Level Vs wx % Vs
Roof 3614 65050.38 0.661 4839 <__.
Upper floor 3707 33363.09 0.339 2482 <---
Main floor 0 0 0.000 0 <.-_
Total 7321 98413 7321 lbs
Redundancy Check rho max= 1.00 Front/Rear
rho max= 1.00 Left/Right
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L9
Bellevue,WA 98004
DR Horton Plan 3724
Allowable Shearwall Forces
Typ. Walls - 7/16 OSB, 8d Common Nails, 1 3/8" minimum penetration into framing.
Wind Resistance (Includes 40% increase per 2306.3.1)
Allow v
P6 266 plf
P4 490 plf
P3 637 plf
P2 833 plf
Seismic Resistance(based on 2:1 height/width ratio)
Allow v
P6 242 plf
P4 350 plf
P3 455 plf
P2 595 plf
Anchor Bolts (5/8"bolts, HF plates,Allow Vw=1.6 x 860= 13761b,Vs= 1.4 x 860= 12041b)
Allow Vw(plf) Vs(plf)
P6 2x sill plates 48"o.c. 344 301
P4 2x sill plates 32"o.c. 516 452
P3 2x sill plates 16"o.c. 1032 903
P2 2x sill plates 16"o.c. 1032 903
Simpson MASAP Standard Installation,Allow Vw= 13051b,Vs= 10601b
Allow Vw(plf) Vs(plf)
P6 2x sill plates 48"o.c. 326 265
P4 2x sill plates 32"o.c. 489 398
P3 2x sill plates 16"o.c. 979 795
P2 2x sill plates 16"o.c. 979 795
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L10
Bellevue, WA 98004
DR Horton Plan 3724
Sub-diaphragms-Front/Rear
Zone 1 Zone 2 Zone 3 Zone 4
Roof 32 ft 0 ft 0 ft 0 ft
Upper 32 ft 0 ft 0 ft 0 ft
Force Distribution to Walls-Front/Rear Roof Plate Level
Sum of Walls Total
Grid 1 14 6 15 35
Grid 2 16 6 16 38
Grid 3
Grid 4 0
0
Grid 5 0
Trib. Vs Vw Wall Sum v Uplift
Grid 1 16.0 2420 1925 35 69 plf OK
Grid 2 16.0 2420 1925 38 64 plf OK
Grid 3 0.0 0 0 0
Grid 4 0.0 0 0 0
Grid 5 0.0 0 0 0
Totals 32 4839 3851
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid 1 6 415 0.09 1.00
Grid 2 6 382 0.08 1.00
Grid 3 0 0 0.00 1.00
Grid 4 0 0 0.00 1.00
Grid 5 0 0 0.00 1.00
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L11
Bellevue, WA 98004
DR Horton Plan 3724
Force Distribution to Walls-Front/Rear Upper Floor Plate Level
Sum of Walls Total
Grid 1 37 37
Grid 2 18 18
Grid 3 0
Grid 4
0
Grid 5
0
Trib. Vs Vw Wall Sum v Uplift
Grid 1 16.0 3660 3889 37 105 plf P6 946
Grid 2 16.0 3660 3889 18 216 plf P6 1945
Grid 3 0.0 0 0 0
Grid 4 0.0 0 0 0
Grid 5 0.0 0 0 0
Totals 32 7321 7779
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid 1 0 0 0.00 1.00
Grid 2 0 0 0.00 1.00
Grid 3 0 0 0.00 1.00
Grid 4 0 0 0.00 1.00
Grid 5 0 0 0.00 1.00
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L12
Bellevue, WA 98004
DR Horton Plan 3724
Sub-diaphragms-Left/Right
Zone A Zone B Zone C Zone D
Roof 48 ft 0 ft 0 ft 0 ft
Upper 48 ft 0 ft 0 ft 0 ft
Force Distribution to Walls-Left/Right Roof Plate Level
Sum of Walls Total
Grid A 8 8
Grid B 4.2 5.3 5.3 14.8
Grid C 0
Grid D
Grid E 0
0
Trib. Vs Vw Wall Sum v Uplift
Grid A 24.0 2420 3015 8 377 plf P4 3015
Grid B 24.0 2420 3015 14.8 204 plf P6 1630
Grid C 0.0 0 0 0
Grid D 0.0 0 0 0
Grid E 0.0 0 0 0
Totals 48 4839 6029
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid A 0 0 0.00 1.00
Grid B 5.3 866 0.18 1.00
Grid C 0 0 0.00 1.00
Grid D 0 0 0.00 1.00
Grid E 0 0 0.00 1.00
28065.1 ASCE7-10.xls
Voelker Engineering, Inc. 11/24/14 Job 28065.1
1911 116th Avenue NE Page L13
Bellevue,WA 98004
DR Horton Plan 3724
Force Distribution to Walls-Left/Right Upper Floor Plate Level
Sum of Walls Total
Grid A 2.6 2.3 2 2 2 2.25 13.15
Grid B 18.5 18.5
Grid C 0
Grid D
Grid E 0
0
Trib. Vs Vw Wall Sum v Uplift
Grid A 13.5 3118 4735 13.15 360 plf P4 3241
Shearwall ratio>3.5:1 NDS 4.3 P2
Grid B 34.5 4203 7412 18.5 401 plf P4 3606
Grid C 0.0 0 0 0
Grid D 0.0 0 0 0
Grid E 0.0 0 0 0
Totals 48 7321 12147
Redundancy Check
Longest wall with H/L> 1.0
L vs %Vs rho
Grid A 2.6 616 0.08 1.00
Grid B 0 0 0.00 1.00
Grid C 0 0 0.00 1.00
Grid D 0 0 0.00 1.00
Grid E 0 0 0.00 1.00
28065.1 ASCE7-10.xls
•
Joe 64
VOELKER ENGINEERING, INC.
EEr No L t ii
1911 116th Avenue NE °F
Bellevue, Washington 98004 CALCULATED BY c V DATE 1%,!•d
425-451-4946, Fax 451-4956
CHECKED BY DATE
SCALE
i i
I
i ! i i j I ..._....t..._........ j
coi
! f
{
t...-..__; 1. ;..._.._.} } t..........—i-—._j I - .»I... ` .
: i I
t...-»._..-..........d 1........_...} ...._..a.........._.} .-... _..._ 1 i --4.----4. -L--,----L..
f 1 i i i
I
i,
I
!
I I_
I i I 1 ! I j i fi.. . i....
3
1
i �.«........_i t 1. 1 I 1
q r
i : t..._ ...f.... I. _..._.i._.......-4--«.»..c....___.4 i
} 1 j
y
I '
j
! I
I
I
I j
1 t i j i.., t !
4—_..._.; .... .-......_ ...«._ ..« •...
t
} fit. .._.�...._..«.. ............_._ _.._..x._..__._...._.___................ � i
i II II ii ;
i I i
•
......._i - I
__}
1 r ! ..... ......_. • ! ! i
._._..... I..
)rii
....., . - . . - .
I
t............ I }
j ! ...., 1_...... I
r
}...«...._«....................._. I j j
i i j I i k... i ' } I i 1 !
_........._..... j
i.. t......_Y». I t I t
; !
..._..... ....._...... ...........1..._....._.:...._....._1 !......_. i i I i I i f ! ! !
t-'- r ....t........_.j...._.. ..... ..... f_._.. . ......._-..__.. ... i
..........4.
I.
•
i "r_.........._... i i ._.......... .i ..............._...i..« r .._ ._.. •
i 1 ...
i i I I j I j i
I1I t... j4 } t + ;
1 i ! i 1 i i : t I 1 1 1 j 1 i
JOB •,cob)I '
VOELKER ENGINEERING, INC. L i SHEET NO. OF
1911 116th Avenue NE . /6 if
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
if' -C/ll.
fr.i9 /ilks,. C !.
'k
S
.... ....... ................. .
A
_____.. _ , ._. ..... _....
PRODUCT 204-1pixie Shads)2641 )
•
Joe ',go 6,
VOELKER ENGINEERING, INC. L 14
SHEET NO. OF
1911 116th Avenue NE c
Bellevue, Washington 98004 CALCULATED BY G g/ DATE l.i e)g
425-451-4946, Fax 451-4956
CHECKED BY DATE
SCALE
4. : ! : . :
j i s
I
.........._.... ............._._...........,...s......._...
,
_.
, I
i
1
i
1 INO9 i'
i ! t 1
i
�t ;
i
ii
.i\‘‘,.
} i i
�\ i
i
I
1 r �/
�/'�
f41 I
j i
F ........._..a ..........................a........................ ! r r
r
}...._...............................a .............a._,.........._.....__. .........._a v
i.
i iti
,
1
......._...._................_._...+......................................... ........ i
._...
I
a........._..« j a
I 1
1
' ! i
i i 7
.......... t v a.............e i
i
:
....._...................................._.__...i............... •i + 1
1i
r
i � i ' I
S b
i i '
....d......................._.' I
...........«... ....�__. 1. ..._... ..... v ....__.....
' 7
i
!
I
i
i i
.............yi..............,...._.......q.............e................._..._.: ...�.. : d..._................. ...... . 1 _... a a..._... ...-._..._..._..._....._........4
I
1 : '
i 1
..._........{............i i .._..i i i a 1 i
y
ii ;
i
JOB Vs es 6;, 1
VOELKER ENGINEERING, INC.
SHEET NO. 1/7
1911 116th Avenue NEOF
Bellevue, Washington 98004 CALCULATED BY S•/e. b
DATE
425-451-4946
CHECKED BY DATE
SCALE
. • ,
,
t• 4...e..." :
; 4 i
' 4
' 4 4 •
, ! i
14
**r>' r 1 ( t
L
.; ,.
. ;
i 1 1
K19 H H H
H1H/ - -i--- --r- H
t
. .
10
!' i . • ,.- .
. .
T '
! .
...!
' . t%. .1 , . ! 1! 4.
br k .1
/0..""Ao•i"...
. i
. i
0 i 4
, .
..k...„......_____ , . ,
, sl!
; ; i
; 1
: ! ,
; .
'
PRODUCT 204-1(Si*Slugs)205-1(PaIdeeR —
Voelker Engineering, Inc. 09/11/08 Job # 28065
Sheet £/b
Lateral Analysis of Wood Diaphragm in Rotation. (IBC 2305.2.5)
Diaphragm Blocked?Y/N N
End Wall Length 18.5 (ft) Max Shear 5.000 (kips)
Side Wall 1 Length 37 (ft) G= 90000 (psi)
Side Wall 2 Length 14.5 (ft) E= 1400000 (psi)
Wall Height 9 (ft)
Diaphragm Width 30 (ft) -- Parallel to open side
Diaphragm Length 20 (ft)
Horz. Plywood 0.75 (in)
Wall plywood 0.50 (in)
Edge Nail Spacing 6 "oc
Anchorage Slip 0.05 (in)
Seasoned Lumber 0.5 (.5=Yes, 1=No)
End Wall v= 270 (plf)
Deflection D= 0.10 (in)
Wall 1 v= 45 (plf)
Deflection D= 0.06 (in)
Wall2 v= 115 (plf)
Deflection D= 0.11 (in)
Diaphragm v= 167 (plf)
Deflection D= 0.26 (in)
Total Deflection at open end
D= 0.41 (in)
VOELKER ENGINEERING, INC. JOB v s°° a;. t
1211 Market Street SHEET,.,o. (•l OF
KIRKLAND,WASHINGTON 98033 .itr 4
(425) 827-0197 CALCULATED BY DATE
FAX (425) 828-3019
CHECKF_D BY DATE
•
SCALE
I
} i i ! i
:
i
! i
I
1
1 r
i
. 17-7r2.': ... f I 1.... .
_ i E
I
..... 5/..... ..f.............�.... : ... IIx _ '
SO Z
............................_.-.-......b i
I
:
i
t
t-�-
R /� .. 4�
3
• `
i
I i
_-___ f
i
:
E
i
I I
•
i
ei'5 tee, 4'5i:..g-1,0 i cd-r.i i
/i`
r
I
�'P
Z;. 4 •
i .
I
S
e! 3
r
it
•
i
I '. ............. ....... •........t...........1................... ..-. -...J........... -...{_. f it
! i i , ...I.... I t
•
{ f
: t
I
i
{
i i
i
:
i
:
i
I , !
I i I I i i
JOB . 7Z41 pOgg,
VOELKER ENGINEERING, INC. L"Z 0SHEET NO.
1911 116th Avenue NE OF
Bellevue, Washington 98004 CALCULATED BY DATE '' $ • 12--
425-451-4946
CHECKED BY DATE
SCALE
.P.,,
'p+! �w. - / ,nz,.,c2 11 c . _ Er�
I
.
•
� ..__g;.. am �,�,d / .
J
•
•
=... 1 S1'8 f... ri'. ?6 A . /z t. 4/40).1t(/r1�•....4.4Zv.+•3 r ...54-?g 7 ..,
•
•
•
: A/ r 6,' .4.s ,* � 0X /o t
Gelat/�. ?�: ....
•
3'W
•
•
•
. iS 4 ,. 1H7 b7,%.*$ 0,. '2 .4.' 9 file ell. :,
. ,
, :•
. .
•
lvt5o
M
17 :
•
l
+7/' . . St' s, ..
204-1PRODUCT S 2$I(
72 9 VOG•63',
JOB
VOELKER ENGINEERING, INC.
4
SHEET NO. I 1 OF
1911 116th Avenue NE
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
. . . . . . .
: .
:. , , .• : . .• . .
: . : . . : . . . .• : .
. . . •
. . . . . . .
, : .• : . .
: . • . . .
: . . .
: . . . .
, . . .
,• .
. , • • •
. .•• .•
: . . . . .
. • ' ,
' •
. a 1 : I •
•' ...i
40;,f .;..
•
art. ! ItV#1474^' H907,:v,Aiidi •-o're.it‘ .41- 4e.)
. .
. •
. .
, , . . . : . • .
, • :
, .
. ,
. : .
, .
,i et it d CL)
Feje. Y 191e4f ,
.. , . : •
44
. 1 i• . .•
7, 0 .
v ,
ryp. f+6,------
.
. : .
.• .
. , •
:
4 .
3 t f4- , k ,.. .i„7 ,. . ..... ...............
, , — • " , , , ,
'' 5 . /. . - k" • •
. .
. .
.
: .• : . . .,
- '2,-5 1 g ::/.., 2. .7r !! 1
! .
• .•••. .
•
: . r 6(4 ; i (- r i ! .•
• :
, •
. :
. .
. . :
• , .
. •
. . :
:• . : ,
. . . . . . •
. . .
. . :
. .
. ,• .•
: : , • , f , i. .
! : ...
T . .
. .
. .• .•
. •
, . •
: .
•
. , .
. ,
:' ;.• •
• : : , 1 '
• ,
. •
. ' • . .
: „ : : ; •'. i : : • • ; : , : f 4 . .
pf ta
1-5° .,4,144- . - . me ! • ! ''-1 , : ; .
. , ..
$Z 1
. J. !,!!!, ez.i4..„4,e4j . . , , , • , , , , , , : ,
. ,
, .
• . . . . .
- - --:!--- I- - .. .... :.-- !.s, 1 -.e..;•: 4 ' 3 L,L i ..!
ic, ,s 1 e . ,...
,) , , 1 , , ! : , . • , to -,
c 1 ! ] 1 ,p
,
. .
••. ., .. .. ,
! 'yz:...t k• ..1 I ; ; ; ; i ie
4-- i
;.• , : i ... ei;„ A
i ....4.--. •
. i 1 i :•. .
. :
,...
. • ! , i 4. !
: . .
. ; . .
•
. . . .
. :
•
• , . • ; : : , ; .:
r. 4.,/10 13,•I : s , : , :
; •
. : .
t p 4 e ! -%z I ! .,,
,„e If G t AL i iigo ;
; ..••• •-•••• •i• -• ; ; : ; ; ; • ! . i• ; : :
.•
•
• .
•
. . , ; ; « i t . • ; • i , • ; ., ;
• .
. .
. .
ir v.i.. /...4.1..
: . - „ • i ° i i
. •
. „
IIVO. 1/IA?'/040wire S d•P„; j ; . .
. .
•
, • • • i. i - i: : ' . 'I" i- 1 , . : • . ,. !
. . . . .
. . . .... • : • , . :
. • . . . .
. .
.• . . • .
. .
. .
r :
. : .• • .
. i .
. :
. : .• .
: . . . .
. . . .
• • : : : ;
• .
. . . . . •
PRODUCT 004-1(*le Shuts)MI(Pidels)
.. . .
. . _ •. ..._ — . . .
. .
OB SZ''� �ga��
VOELKER ENGINEERING, INC. SHEET NO.
1911 116th Avenue NE OF
Bellevue, Washington 98004 CALCULATED BY DATE 12' 3 3 vg
425-451-4946
CHECKED BY DATE
SCALE
'
! i
i
! j
.. ................................... F
U 6.6:.....w,.:,;a.••..4...........1 ,._........._.. .�.._tvwar t ,ru
(�. for 1 +w tea
. ......... ....�.... WC Alf{u MAIN AVM 1lj,p.r•
k . . ...._ ....... "d ',
i •
................ ......, 1. '
s.
I a
.i..... •. .. •
, +. i
.
. 1 - _.._. - _ II it
-.q........ '.....i.. :.......... ............. .. ......... ' '�
...........i... •............. .. ........ ..... d .......' ' IL,.
�. ,
t.
•
1
40!ii.I Li ,
Q E3 q E3 ,! j...
Q C
CISCI "
j
, •
„..: t +... ...
........ ....
.., [
i . .40'
1r •I rN+Ka w enc I air I: ! ri �r� a,nu tsw+retn;T l
..,.....lww4.•aa .;. ...... .. .. 1 .... I'�-� ( :I. .. .•, 4,0 +�Y huna:M 4N-A-170
aw
4 I.
iI
Ippr_ZI.• , gig
._.=:moi t ���t .t"r. i R4.IFvmr
•
l
• . ,
o-. € rM
w �.; •
I ami
1
E
,h„ ; t........................._.......1... « , .
4
/kW
®
!
:
:
••
............._..................................._............................d..........._,...................... .............d
...... `
., . _ .1
I ,
VOELKER ENGINEERING, INC. JOB
714°
`" 145r-i 1V '.-Go 64
1911 116th Avenue NESHE�NO' OF
Bellevue, Washington 98004
CALCULATED BY en'✓ DATE �j• 1/.p {
425-451-4946, Fax 451-4956
CHECKED BY SCALE DATE
`{ r
,
..
i.
g I
..................r . : ..�.. :�,�, ...
.
f.
.... ......
..............
'✓ /
y
; 4
if1 ...... ..._.... .............� L
d
:
•
i ;
,
•
�......._ . 1.. Z........�........... w . 7 7 '
4
.. ................. T' 4 .... y D,S +
:
i.
.............1 C, U
i.
.... ....................._..:....._........ I t a
:
2 r
............
i '
11 i
i , o........._....._.................
r
' F
414?
.......................,..........._:.....
•
s
j : fir
•
....•
...........
H/�
t
�4'r'L
,;w
1
r ,.._......
r
JOB Q ���J6
VOELKER ENGINEERING, INC. SHEET NO. Z
1911 116th Avenue NE
es OF
Bellevue, Washington 98004 CALCUUTEOBY DATE �` L/"
425-451-4946, Fax 451-4956
CHECKED BY pA
4/1
y .
•
SCALE
c
! i I
14 I
}
:
I
.........._.I......_._..•........_...i. i i
! �e . •
_........_.p....................... n......_...'.. e_.. ..
t + .... ..... .... j
j
i
i =
p L
}
i ��My�
r
10%." .. l' 0> ' *- I.: , , .;
I.
;i /V 1
F
is
:'ri
!
!
i
i i ! i i J
i 1 I
- .! • .i....._..:............j..
•
i4. 4. .1 51
:
i j
7 :
.......,_..4 q r i.. t i
......_....., e•... . .
....................•-........................................_........... -1.„........_.......a......... .
..:...........j.
:
:
' ........4...........s............. '. .....1............. 7
l.._.........
j
,
i
V ! i I I
! s a....._.....4,
i I
i 1
'
q !;. ...i. .. ..
! :
!
! ! I
i
.p
I
%z4 9g ed
VOELKER ENGINEERING,INC. SHEET NO. r OF
1911 116th Avenue NE /e. 3 d . G'
Bellevue,Washington 98004 CALCULATED BY DATE
425.451-4946
CHECKED BY DATE
SCALE
i
,
i
,
...............................
;
I
,
!
I
v
,
i
i
31.41 : 114111
!
t.
Boson
f G
r......-.............T .:....mow...! II _.. .... ........ ,. ........_. ' ........._...........a
•
•
1a11w�NramN� -
• I
/t� ��
..............,....._..._-..........................:...........................__..,....w............. NdIYL �� ® 7.•=ems ro
rrr_r_,�s� .................................. ...._ i000 -....
..... ..
mii
H>00.7. i
e.rI i(le9 illi
, r
e. '
{
. .,. .
.., .„
.. ,.. . J'
r
,. {
. ,
, .
. .
, , ,... ._.. , 1 ' ., ,
•
.r. ,.. . ,
, ,
, , ,
1.
, ,, E
i .i. ,
4 .„ ,. .., ,,
, .... ..,.. ...i. .4... ,.
, f .-•
1
i i
JOB 2666-S
VOELKER ENGINEERING, INC. Ur:1
SHEET NO._ OF
1911 116th Avenue NE Q
Bellevue, Washington 98004 CALCULATED BY el DATE ['1�' 190
425-451-4946, Fax 451-4956
CHECKED BY DATE
SCALE
i
;q40 1�,
V •
i
i { i s•...
f
5 .c elf �........_..
..............._..._._.. —i.....
....._. 4. d. 1
�....._..._+ ....<.............. i ....._......._..........._....... ..............j................__. .....;/-............
i
a + 3. 8
L. i
...........? _.._...............-.1-................ ;.._....._..s... .. �....� _ ,� , ...... ......_.1..._ a _. ,
....ri i i —' / i
i
f •
: i
.............i..........._........... ..... ,. ....................................b............-........................ .........................-.....-_... 1 I...._.._ ..... .....
i....
I :
(9) I ; .
I
t.-
,
I 1 j i A
�. _........__..._..._..._.._........................_._-._.............. .. 1 .._. __« i
3
}
:
j :
,
h i
1
«
CD i 1 i .•
IT1 jy L...
1
ua , 4: G : ,
:
;
:
E
I I a
,
VOELKER ENGINEERING 6f)1
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
Plan 3824
28065 Prepared by:CV Date:9/11/08
Selection 3-1/8x 10-1/2 GLB 24F-V4 DF/DF Lu=0.0 Ft
Conditions NDS 2005
Min Bearing Area R1=7.6 in= R2=4.5 in2 (1.5)DL Defl= 0.29 in Recom Camber=0.44 in
Data Beam Span 8.2 ft
Beam Wt per ft 7.97# Reaction 1 TL 4943# Reaction 2 TL 2894#
Bm Wt Included 65# Maximum V 4943#
Max Moment 8968'# Max V(Reduced) 4534#
IL Max Deft L/240 TL Actual Deft L/337
Attributes Section(in" Shear(int) TI Defl(in)
Actual 57.42 32.81 0.29
Critical 38.99 24.64 0.41
Status OK OK OK
Ratio 68% 75% 71%
Fb(psi) Fv(psi) E(psi x mil) Fc1(psi)
Value4 Reference Values 2400 240 1.8 650
_Adjusted Values 2760 276 1.8 650
Adjustments Cv Volume 1.000
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform TL: 460 =A
Point TL Distance
B=4000 2.0
Uniform Load A
Pt loads: :}
R1 494 R2 2894
SPAN=8.2 FT
Uniform and partial uniform loads are lbs per lineal ft.
�� 6p
...13 Sg. 2-ci
VOELKER EINTGINKER111TG, INC. elfr 3
SHEET NO. OF
1911 116th Avenue NE
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
I :
i 1 —
1
.. 0.4.. .i .... ...; ., ........ i....... r. ...... . .. ,.. . ...... .............. ....,
i t
I• I
I• " ""t -; t" T ;
1.0 !
4 ..... . .....4. ...
.....- 1.-... -1.-•'. i • ' ...... e 1 . ...,
. ••!. ••'• •r. ,
1 I i i i i
... . ....4 i 4. •••••t- ; 4. t ' . "1"- ..t ; . ....... . 4
".• I I I ! ; ;
; .
4....... - .••••••I 1-. 71,41I .°V."-4- t ! ;
. . .
4 • : ......'". -4 '"`.. . . ' '
i 1
. . --. t ,. .._., •i
! IA
.; . .
. ;
i........ ...4..... .. 7 ti,
10
! I ;
; ! .
...... . ...... .........
!ow • i
ti
4 o!
. 1- ... ....
: i a.....•..•••--.•.•-....t
a 4 ....---t.. 1••• ........4 .4--. ..--t-. •1- • •••-
I i
•• .t. . ;... . ....,.. t . .1 4 i....... .i..... 4 .- i... ...... I
. . • ... ...1...... ,........ ! .... . .. .... .....4 f 4,
! , ,
1 .
.......... ...... ......... . .J ... ...4 ....- fI...• l• 1.... ...t. . .. ..I .* •• . .
I I I I
I I
, . .. . ..... . , . . .... . .. .... .. ............
•
I %
. . ... ...!..4...................... .4...... .i. ...... 4 4 . .. ..
, r" . . . .... ,..... ..... ._, i 4 .;
! ;
: . . 7. --• - . t. . .i i
I I i
4-- ....... ...... I. i
4........ ....... . . ...
i I... 4...
t 4... .. .. .7 .....,. . .. .7...... ....................7
I i i•.. 4 . .,...... .j. .1
i . .
1 . .. ........4 I.
... ..•.. ...o A. .. .:. .....4 1. 1 . .. ‘..... . ..... ....... 1 i'' .'4- '• 1 ..7. ....
i i I
• .y. . . . .. ..... , a. ....... ... ....s a
1
i t
.. ,. . ......
I I
;
; I
a {
1 i
i .
.4. .. .. . ..... ,. • ......... .....i. v . a . . /...... ......... .
: ...... ..... ..... ..,... ..,... .. .. ...,..
j .
f i
; st
—.. .. 4.....
. ° .. .... . 4 ..... ..•.- 4_....-.. .4.
I
i I
f ;
. i
) i
4 .•4
e *.... 'I" . ............ . ....A...... t. . .... ...
1 • •
I 1
I i
I
! I I I I
I i. . ••4 • •.. ......t ...!...... . " •
I .4
'•
I I
i I I
• I i • .
.............,..... .. .. ..
; ....
. t r i- - ..t- i•
f i
; i • I.,„.„..'!......... . . .....f... ..... ...........,..... .......... ... ........I
.. . .
if I
° i ... . . . ., .
.............
• ; .
; t ;
4 .. ..-... 4.... .i. --I ? . !--- . ! . 4 I' i. t . — 4 •
1...... ......... ... ... ... ,.... ;- 4 -,... .-, • ... t• •••••1-... 4— '1 ! —4—... —,- ,i,.. -4 . 4 4
1 I
i 1
So
JOB
VOELKER ENGINEERING, INC. 6
SHEET l°
1911 116th Avenue NE
Bellevue, Washington 98004 CALCULATED BY _ V DATE
425-451-4946, Fax 451-4956
CHECKED BY
-________________. DATE
SCALE
•
i .
i ! :
:
0
I :
/ r ,
; f• t ° - t.
.c7i1-1.4.....................i 4 = i !
. ,.•• ,• .. 4
/ Orl
I I i
I 1
f 1 ;
4 4 1 f
I I4 •......•...t..•.. •
5 c 4-1-6 r'-,.,. 16-t,A1 7 f• iflo 1 + •- .. - .
I, •P
.1.
; 1
...,......... .......„.........,.......... : +
i f i
I i
i I •
! !
! !
! i
..............
4 «
i 1
I
1
.. 4
t
1
A+r f IV t •••• •
i
/ 7 1 ?12.,
i , i . •;
i
i
- -i•• .
. 1 i i
_....................
! i
1....... .
I .. ,.
i i is
L
f I
I
I f i
f-
- ; +-
- !4 :
I
1 i
.. .............
t ... +
1 :
I i
. .
40
,....., ,
,,,
,
1 ,
.., "....."e ) .•
•-• - i
! I
4 + • ii 1
! 1
•
•
...! 4
t .
.t f.
. i 4
..-............ .
; I
1, r ....
1 !
i
! i
ti
.
1 4 . i ' t . •
4 i_ , ,
, i.....
,- , _,
,..
l'' 7 A . .......... .............
i '34 tr ..te..% 6 /4 nog"' 0#.A.-.51. ri. , ... . . .... ..•. ,
..........................
. . ... , . , ..
•
: %ow ,.. ... ... .. . ,,.... .$ :
,
, .
i i I I
4 •1- i •4 '
I ;
;
1 41°40 2:• A •-•'° ,
i I
t ; 4....,.....T............1........ . ..,. ........
„.............................................,....
; i t
i f iktili +4'44
•
. i
1 ,
......... I. ,
iI 1 I . .! .. .. .......- ....t.. ......,...„.....i..A....1
! ! .
! •
L. . ..,...._......„.... . .. 4
r i• f ., 4 I
i i !
1 I
1 1
.!....... ....... ! .....1 + ;
I . .
I i
j I
1 s
1 ,
. ,
..• 4 r
1 •
! i • t
1 . f
t I
-+ + ; . f.• , :
1 .
1 I
I i
I '
; 1 1
f 4
t t 4
.I I j f
+. • ! «
-1 f . t t 4
'"'.....',. .... 4 j•
; J I f ;
I !
• ;
1 j ;
; .
;
; f
1 .
I• . .° 4 i
4.
t i
i I i
I
I i
i .
I ;
I 1 I
•
1' I - r
I 1 f /
.
1 ,
I ,
, I f
f , ,
..__......., .... .i. ........+........!...... ... _ .
f
i t r
i t
i I
i .
I ;
i f I 1
;
1 ;
_—__....._ .
JoB
6a��
VOELKER ENGINEERING,INC,
1911 116th Avenue NE �NO'- LLJ%a OF
Bellevue, Washington 98004 CALCULATED BY G✓ DATE '�-1
425-451-4946, Fax 451-4956
CHECKED By DATE
SCALE
i
-C-7:14r (V)1.A.,..), i •;
, et , ,
+ ,
, ,
I
, i 1 ; .,...1 ,,k,) t
i +
r
I .°M ...1 '''.,.ii...1,..... . " .: -• 171..........
i
, pt:.:. •pr., ...,,
µ
J
s
3C
:
Y
• : i
I .!
,
1
i
a a ,..._.......;._._....._�.........................M ...._... 4
I : '-"+"•moi , ...
..................' r....... ..... ...o. ... ...
! ;
r.
!
.........................7 '
I
t
1
:
- - ,.................._................_.-a a........
I..
j. i1pu
i ........_�.............
i
•
; i
r
e..._........................._....... i +
f
e y . ,
i i
i i I
{ ....................................4.... 1 !
i
............._...........a........................t......_.... :
i41
,
' j
;
1 1 1
;
i 1 •
i i
7 1
,
i
} r- c...........-.............}............�.........._.........._..
7 , j I I i F i 1 ! I
mow-.►. I 1 f
VOELKER ENGINEERING 61f
BeamChek v2007 licensed to:Voelker Engineering Reg#8111-1879
Plan 3824
28065 Prepared by:CV Date:9/11/08
Selection 5-118x 12 GLB 24F V4 DF/DF Lu=0.0 Ft
Conditions NDS 2005
Min Bearing Area R1=3.4 in2 R2=7.9 in2 (1.5)DL Defl= 0.19 in Recom Camber=0.29 in
p Beam Span 9.25 ft
Beam Wt per ft 14.94# Reaction 1 TL 2199# Reaction 2 TL 5166#
Bm Wt Included 138# Maximum V 5166#
Max Moment 13755'# Max V(Reduced) 4931#
TL Max Deft L/240 TL Actual Dell L/578
Attributes Section(in') Shear(in2) TL Dell(in)
Actual 123.00 61.50 0.19
Critical 59.81 26.80 0.46
Status OK OK OK
Ratio 49% 44% 41%
Fb(psi) Fv(psi) E(psi x mil) Fcl(psi)
yalues Reference Values 2400 240 1.8 650
Adjusted Values 2760 276 1.8 650
Adjustments Cv Volume 1.000
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
_Loads
Point TL Distance Par Unif TL Start End
B=6600 6.4 H=220 6.4 9.25
H
Pt bads: J
R99
R2=5166
SPAN=9.25 FT
Uniform and partial uniform loads are lbs per lineal ft.
.K 3'br1 1 f t sl Xo‘4
VOELKER ENGINEERING,INC. SHEET NO. uP 7 OF
1911 116th Avenue NEC V DATE #•Sl• d 9
Bellevue,Washington 98004 CALCULATED BY
425-451-4946, Fax 4514956
CHECKED BY DAIS
ecus
. ____-i.'..-1..-.. .4--1 --_...L1...-......-' ._.'.- _......t._....
" I
. )
::_igt.__.t........)_ . _.._ ..,......t.....-1 ,._. 1
t i 1 I ( , - i ' i
-----1 I------- 4 . -r - ' - i .-1 1 i...... i 1
0,10
____-._1_1....._.r..--1-...±..--_..-1--, __ _ _--_._- -i‘-__Al-- e id•',1 " I #.itos._._.._9- . te. Eli__ _____4.______,.__
!__ _.._. _tt-i' ._- 4 !-
_..__... .. .__..__..�_ '._-._. .__ 4, ..max - ' �.._...-�- --- i I _.. _.L..
__._.__ 1__-- _ _ _ __ 1 _.i ± _ --
r .1
.-- r
1
._ ___1
. _�_......._ .___ ..._c___..
I
,
. . +.. __!_. ...t. t 1 , i i
., 1 1 +_[.. ,li i _.i._ i__
t - 4•,..
I
,
tka� __ ___._.� __. 1 _..l_
1 1+7,- 1 -I I t
L.. I HI: 1 1 t-- I-- 1--
' r 1 .i. 1 1 *1'4 71 . ...,-i- q___I_____
1 :_ri' _,_
"r" , ‘.4(3T "
il7 It 1 4
! i 1 Mir
— 4 , iiii , L-- ------1---T-- - A.40.,,,iam• ,,,,-1
fo,..ts,fy
k .._.......
1 ... ; ! _ - .T-_.t_ + */,'.J'.!.4. i.
-.1 [ -1- I I ' 1 I ' i
- 1 --t- -IN litif- 1-"---
4-_-j-_-_-. _. . _ -._..1.._-�_ -=�----- --�-- _ _ ..� I______
.
S g.t 01
JOB
VOELKER ENGINEERING, INC.
SHEET NO. a ic., . OF
1911 116th Avenue NE
G I/ 49•/*.d)g
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946, Fax 451-4956
• •
CHECKED BY DATE
SCALE
T :
.40,40 1 i Li. f " •-i i
i •
e.4eirA .
lace. cte,a0.40dif r: ,3 ; ...,. '• go:J.)4. • .
i
I 1.
I r
! I
I ; j
I ;
. i
! 1
i I ;
i I
4I ;
4 • -I Ii 1 ; I
i
i ! ;
I I j
1 i
, ii111,
e i.V
,2
.
if1
i;'
,
41I,Ii
..tIi•
•..I4
•,.• •i!?.
.4.,.11 iI
r:• 4 i•Ii,,
4 -
r;•;,
i.,
I
t i i 4 I 1
. 4
4
T I i
; I ;
11111.111111111111.11MEMINNI I ; ; ;
.•;i r, " . ; ii :. i ,i 1 4 iI 1 . :..
tiI
t I •
I
1
t
- I
,
I I
! I
I i
t ;
ft
i I ;
I I
I
ir i .
T i ,
1 j 1 4. i 1 I 4 ; 1
! I
II i i I
i• -I- .
; I
I I .
I.. I.
t 4 I •••1
I .t. •1
4 i
t• I - •
II.
I
;
•.. '; . i
I ! I I • •
i I I 1 I i
I i
I ;
I ;
• 1 4 I ; - • I ; 1 -+ -« t
1 I
I ; I
I I
! I I
I4
I!
! 1 I
1 + 1. .:
i 1 i
t : 4 t 4 ,• 4 -4 t 1 ..• -- -,
I i
I I
. i 1 to 1. ;
; I .
; i 1
4 ; I
; ;
;
I 1 ,, . ;
t • 4 1
r t ; i ; t ? .1• r i 1
I ; i
I ;
• ; i i 1
;
i i I . I ; ! I I ill * ' 1 • I
1 1 i
; ; I ; i . ! Li, % • 1
4 -.••.. -4 1
1 1 1
t
. ; 4 ; ; . t f I • 4 4 ; - 1 t. ,
f .
I ;
. ;
i I t I I
i !
1 ;
, .
,
i 1 -I f .I• f i' _f - t 1 .1 ; .I,
t ;
I I f
I f ;
i I
; •
i;
I I I
; ! I t;,..e 3,47-ei e.• Por'l-
, , I
; ; ; 1 ; . I ; • ,
•
!
t i .
r t
it 4 t
I 1 i t i- ? i 4•• . i
: i i . - • .; 4 4
i 1
I i • i i i •
1 i
.. .I •.! .
/ t i ..1 ,. i .. •It. ..t I . .! . / . / 'i.. -1- 4 i
I ; i
i 1 i i 1
1 f I I I I !
! i ;
i
• ; I i . I i ,
I
! !
;
tI ;;•.. 4 i. ... t. . I... .1 f , i •
1 ; i • + 1 f 1 ' i . i•. .. :
.
I I 1 1 I - ;
; 1 .
; 1
i I I ! I
I j ; •
I
1 • t 1 1 1 1 t .. 1 i , i ' '1 • ... i
1 1 1 1 i 1
i 1 ,
i 1 1
I 1 i i
1 i
1 T
; I
I ;
I
; ;
I ; ! !
1 I I
. 1
1 ; 1 ; + . I
I 4 t rI
I f- f . 4 ; I • 4 T ..
I
1
; ; ! ; i • ; ;
;
; I
iI ; i ; ;
I I . I 4 ; ;
I 4 - 4 ; 4 f. i 1
. I . i I '"*. r. - •
„
II I
I
4,
! 1 t
I I
. I !
! . ; ;
; 1
r .
I i I I
j i I
1
I
i ' 4 1 I .. ti ;
; .
r1 i f I
.
.
; 1 ;
• 4:
1
I;
II
, t
4 I I It
I 1 I1i
lI
;
4
1 i
I i 1
i 1 ,
1 ,
i • • t I i i
i i I
•.'t • L • i i
i• i
!' 1
.,
4 ; 4 i 4 •• i i f . 4. -t-
, t i i I .
,
,
i i 1 1 I 4
II- -il ; + i , • •• .; I .1
f I' t t
; 1
I I ! I t
I ;
. i
i
i
; 1
I
I I 1 I i I
.. .• . i• i ' . . 4 I I I, I 4, i 4- t . }
•
; r 1 TI
! ! ; I 1 1 ,
I I t
I 1 I
I 1 1
1 t
1 1
4 I ;
; 1
;
i
;
-r
: 4 ;
I t I 4 i i
1. . 1 ....
• ; ; ;
I
I
I .
4 1 4 t1 i
1 4 t .1 4
t .' . .1
; : i 4 4
f i. 4
4 t
v I I
I
I I i
I ;
I
i 1
i .
I I I ;
I I
I 1 ;
—. t 4 • 4 . ;. . :
4 i• ! t 3 , 4 f i ;
f
1
I i r
I ; I ! I
I ;
t I
I I
II i I ; ;
i
; . I- . 1 r ,-
i *I 1 ,
. i 4
I 4 1
; I 4 • 4.
1 I , •
1 I
1
• I i i i
i
I
III i ; ; .
.
I III ! ! I i
I I .
I I !. I
f + i
t" i I ' i s . i. 1 4
I i ;
i -i -f -I 1 .. ; : i.. i. .... ! ....1. . f .I
f ,
iit 1
1
1
1 1 1 I
; 1 I 1 ! I
i I ;
I 1 ; I .
; ; 1 I I ; • 1 1 I ;
i I !
1
1 i :
1 ; / ; • - t. : i
t I 4- - • 1- 4 • .f• I. . 4
: 1 t ; I I
I 1 I ! 1 !
! I
I '• .1 ,
1 1
1.. I• i 1 , ,
! ;
4 . . , . . i I I
I
! .
1
1 I. .-1 t • -I- f•- +•
I 1 !
i .
1 i I ; 1
1 1 i I I ;
i I i i
4.•••-•Ii......1.....1............J-.." 11,4.4.4..i......i...... ..--1- _
Voelker Engineering, Inc. 04/03/12 Job# 11065
Simple span beams Sheet UF9
Dropped extended garage beam 5 112x15 GLB
Length = 19 ft Width = 5.500 in LL/TL= 0.63
Load = 510 plf Depth= 15.000 in LL DUR. = 1.15
Pt load = 0 lb E = 1800 ksi Repetive = 1
R= 4845 lb V @ d = 4208 lb
M= 23014 lb-ft
fb= 1365 psi <OK 2760 TL Defl. = 0.64 in U 358
fv= 77 psi< OK 276 LL Defl. = 0.34 in U 674
Support 2.2 in
Garage door at dropped garage 3 112x10 1/2 GLB
Length = 16.25 ft Width = 3.500 in LL/TL= 0.63
Load = 120 plf Depth = 10.500 in LL DUR. = 1.15
Pt load = 0 lb E = 1800 ksi
R= 975 lb V @ d= 870 lb
M= 3961 lb-ft
fb= 739 psi < OK 2760 TL Defl. = 0.37 in L/ 531
fv= 36 psi< OK 276 LL Dell. = 0.20 in U 999
Support 0.7 in
VOELKER ENGINEERING, INC.
SHEET NO. $11S OF
1911 116th Avenue NE
1 ,),
Bellevue, Washington 98004 CALCULATF_D BY eV
DATE.
425-451-4946, Fax 451-4956
CHECKEDBY DATE
SCALE.. .. : !
. .
11:0- 1 1
i 1
r. 1 t•
i.
. .......
1.
/44 A
i
- .. . . , ..., .. ... 1
i ; 1
!
3
i ! ! • ' i i ,
4 31.•... 'Ia-''t", 0 4(0.4 dtt
17 ;
;
! .... .
. I i
•--; ;- i T I I, s .4 )1 riNt ..4
, 1
; : 1. •!.. -r
t t I
r t
! i .
i .
1 _
-..• . 4.- r- 7 t -4- I.. 1 I T 7 I:
Iiil Z h.D IY
..4. ..1
...
... ..,. . .,...... 1... .
1 I
i !
I I i
•
! i
: V
i r. ..'t .i•... I •
;
•
; 1
I • i
i ..i. . •-• 1 ;
t- 4 ; 1.• ....4 -1- 1 . .1 ,
i•
1 .1 6f.. •
•!•• ..i
i•- , 4
ago ; y7 ?la" , .
(46.4..let 4 , 4.. , ..,... .1
!
,
, i. .. s 4 ,
., .
,
4
..i....t.D.. if... •1
. 4
1 1 i 1 1 i
! .
.•
. i I
1,1
! f I
1 if" 4
i I I
i
t.
1 I .• .
Ir 1 i
. . . 4. ..,• 1"". ° 4 , •. •
; ; 1
: •
1 1 ;
; I 1
.............. i
4 •••• 1
; i 1
I I 1 i
1 !
I )7,1 • 1 f
; F 1 • • t ....4 r ,
! 1 1
1
T ,
,
r i 4
i ii
1
r7t , 1 i i 1 % + I ,
.., .3 , 1
3. ...
+ •.- 3
1 I
t.... , ....t ..4.
A - "I. -1"-• -1. i
! 1
4 1
; 4, • ; . ... 4.
1.. ..• i.. r...
4 i I 4
. 1.
,
i !
!
!
i 1 1
...., .1.... ., ' -"I' •: 1 • T .4..
I i
4 f
1 I
..i .. '
4 4 •
, •••7. t 4
I 1 ! •
1 i
1 !
! i
.4. : ...t• •-4
1 ! I ..•t• 1-• 4. ...,. .
• , T•.
!
! I •. ...4.
4 4
1 •t
....••! • • 1.
•T ...l• 1 .. - .
4- . 4.
I !
1 1
1 ;
• !
1 : 7
.•• i i ! i !
.. t r ..• 4 i•
1 1 i 4
1 i• . ; -1... .1-
I ) ) ! !
i. •.. .
3- • 3 ... i , , .4.. 4 • t , 4.. .4 - . 4.. i .. 1.' ....
1 ! II
! 7 7 1
! 1 1 I
I i I
1 7 1 1 7 7 1 i i
1 ; !
I
I I.
.,........-..
i .1 1 i
r !!
.
i
I I
I i i i !
I '7 i 1
...,.:, , 7 I: ! •
1
oil)6 #
JOB
VOELKER ENGINEERING, INC. SHEET NO. 041 '' OF
1911 116th Avenue NE1-11-A6
Bellevue,Washington 98004 CALCULATED BY V DATE
425-451-4946, Fax 451-4956
CHECKED BY DATE
SCALE
. I !
I I i
.. 1
14P141 /3140°0+ i !
...4 i
.,...,..... . . . , ..... „
i 1
1 , .
1 I I
; .• ; .4 i- i. i.
I 4 •... I
1 I
; I ;
; 4... .• ;••. -;
I i ;
! ....4.... ... . •
"'.. 1 . I
4. ..-
1 :
; 1 .•
44..Ni fIS .
. .•
. 1 I
1 ,
• •. !.. •i• •••ii•.
i I I
I f .! hi Si 2141
1 r I t. ....i.... . ......_.....
i
;
I I
• . I 1
1 1. ;
; ''''/Id t ., .•1// ; f .; .. ... •—•
; ; i I
I ;
i ....1' i .• .
; 1 ;
I
I i
I
. t
1.... ,
; I
i I V
t . 15 r)-4•;! 4 ; "t "'I"— . . '
; # ;
I i
i b 4
1 ;
• t , 1 77
•
..—1
.; .....
, 1 i
i i I i
! I
P..k ri 61. i
1 t
I ; i • i
4 •4•••• t • .., . .... ..4 i .'
•
i i i , 1 • I ,
4..
- ; ;.4 t .. I 4... -• + !I -+ , , i . .1. t.
i i i i i
1 i I
I. ..4 ' .1.. 4.— 1— I. —1.. is. ' 1 t . 4 4 "T L r .,.
I ; ; • i .
1 ' ;
; I
i i .• ;
i 1 i I
1r le, r)
1 4.104,0'A" ii>e),Lir
4 44'44 11, r
i • .+
' i • 4.- 4/ I ? 4 nil. ti .,... 2-4/or 4 i
1
I
.—1— f
$ I )2.- I ;
;
r ; . . 4 —1'. 1 .. ... L.... 4
I I I I i
11
44.
...—I. ... ...4 4.... .
. 1 1
t ,
.,. ,
7
I I
I I ;
1 • i I ! 1
'V r+ 1. 1 I.
: I I
i I I 1 “ "I..
;
•-•;; ;-0-p...........---;-a- --;-"--1.--•"..-1
I...,
.., .,..... ,„..... ,
JOB
VOELKER
VOELKER ENGINEERING, INC.
SHEET NO. )1/ig 5 OF
1911 116th Avenue NE eV AZ•
Bellevue, Washington 98004 CALCULATED BY DATE
425-451-4946
CHECKED BY DATE
SCALE
1 1 :
: 1 :
;
,.... ., ...4... ...0 i' r t • t I
; : ! ; I ! ; • ; .
itAffp ;
i !
...4 ...i..... ! ..I ...+. .4 !. i 4
I
! !,
4 F
; ;
fir/
4rilfefri
0401 ;
1 .
iiii rig.s!..4........ ,...90,... ...4 _ . , .44,•,.. .4 ,_
, .
4 .4
4.4. 4.40.4 ! il Al 4::::) 6 i -,‘,:,
1
.•
,. -•,-44/6 . ...._
1 i e
. :•
. .. •,•• ...••, .
cl 11.•! ..
, .. ..... .. r i- .• .4. 4
i
4.
ok_
,. ....... 4.
! ! I
. ! !
1. ...i.--. I
1 a ....
! a :
; 4
red ki
F"..............................,...ei,.
. ... .
.•
. !
1 .
, !
r
. i. i;I
e
.
s
j . ,.Ii
,i
,..
ti
As7e i .
, , i .•
. .
. .
, .
...
; ; • + t ;
; 1
. • . I t 4 4 .
":i flitio
• ; I Ca /.
,.. i
1 I
!
h.v....t r
!
t f ( i it5i,i,
i .
.............
t t
, t
, !
4 ! I
I
; i
.•.. r ' 1 f •
;
I
I .
! ;
't '.- --i ' t r i 4 1 .1. 1 1
; I !
1 : !
i I
a .1. 1 1 .., , 4 ' t.. i ,.... . •-t t .
i • I i
• • • i
, i
. .." .....
•••
I i
, .
•
,, r• .. ..i. i .I
. ....... ., t •
i !
I - I . . I' , -4 .4 .. • -, •
I
.. 1 + I 1: . . .,
.4. 4.. t .. 4+ .. ..t .
. 4 t
I I I
I I
1
-;. 4. 1. ... . 1...._....1 1;... I! I I
1 I I I
I 1
4 4
1 ;
I
4 i i
1 i i
I I
I i
Voelker Engineering 08/17/11 Job# 28065.1 •
Sheet W1
2009 IBC-2005 NDS
Wood Stud Design Ver 3.2 VE2009
INPUT
Axial P D = 240.0 (lb/ft) HF#2:
Axial P L= 0.0 (Ib/ft) E = 1300 (psi) c= 0.80
Axial P S = 400.0 (lb/ft) Fc= 1300 (psi) COVe= 0.25
Wind w= 16.6 (psf) Fb = 850 (psi) Emin= 475
Stud B = 1.50 (in)
Stud D= 5.50 (in)
Spacing = 1.33 (ft oc)
KL = 18.00 (ft)
OUTPUT
A= 8.25 (inA2) F*c= 1430 (psi) KL/D = 39.27
I = 20.80 (inA4) F*b = 1148 (psi) Fce = 253
S = 7.56 (inA3) F'c= 243 (psi) Cp = 0.170
Case D+.75W+.75L+.75S
Load per Stud: Computed Stress:
P = 718.2 (lbs) fc= 87 (psi)
M = 670.6 (lb-ft) fb= 1064 (psi)
Combined Axial and Bending Loads AxialA2+ Bending =Total
0.13 1.41 1.54 < 1.6 O.K.
fc/Fce = 0.34 < 1.6 O.K.
Case D+W
Load per Stud: Computed Stress:
P = 319.2 (lbs) fc= 39 (psi)
M = 894.2 (lb-ft) fb = 1419 (psi)
Combined Axial and Bending Loads Axial^2 + Bending =Total
0.03 1.46 1.48 < 1.6 O.K.
fc/Fce = 0.15 < 1.6 O.K.
Case D+L+S
Load per Stud: Computed Stress:
P = 851.2 (lbs) fc= 103 (psi)
Axial Loading only, no bending fc/F'c = 0.42 < 1 O.K.
Deflection at midspan = 1.93 (in) L/ 112
full wind load
BeamChek v2014 licensed to: Voelker Engineering Reg#8111-1879
Plan 3724 Rear Header
UF10 Date:6/14/16
Selection 4x 8 HF#1 Lu=0.0 Ft
Conditions NDS 2012
Min Bearing Area R1=8.6 in2 R2=6.3 in2 (1.5)DL Defl= 0.02 in
Data Beam Span 3.2 ft Reaction 1 LL 2251 # Reaction 2 LL 1663#
Beam Wt per ft 6.17# Reaction 1 TL 3497# Reaction 2 TL 2563#
Bm Wt Included 20# Maximum V 3497#
Max Moment 3690'# Max V(Reduced) 2666#
TL Max Defl L/240 TL Actual Defl L/927
LL Max Defl L/360 LL Actual Defl L/>1000
Attributes Section(in3) Shear(in2) TL Defl(in) LL Defl
Actual 30.66 25.38 0.04 0.02
Critical 30.38 23.18 0.16 0.11
Status OK OK OK OK
Ratio 99% 91% 26% 21%
Fb(psi) Fv(psi) E(psi x mil) Fc_l_(psi)
Values Reference Values 975 150 1.5 405
Adjusted Values 1458 173 1.5 405
Adjustments CF Size Factor 1.300
Cd Duration 1.15 1.15
Cr Repetitive 1.00
Ch Shear Stress N/A
Cm Wet Use 1.00 1.00 1.00 1.00
CI Stability 1.0000 Rb=0.00 Le=0.00 Ft
Loads Uniform LL:320 Uniform TL: 450 =A
Point LL Point TL Distance Par Unif LL Par Unif TL Start End
2020 B=3220 1.5 580 H =920 0 1.5
H
F Uniform Load A
Pt loads:
R1 =3497
R2=2563
SPAN=3.2 FT
Uniform and partial uniform loads are lbs per lineal ft.