Loading...
Specifications (21) ,5- ---7-2-05c.)/7 -0. 00/9 ( ► ( 3v 7< v-( 5FA Design Group• tic ML I WID USE pLANNI SURVEYING 9020 SW WastdnfCML Square Dr,Suite 505-PortlandING ,OR 97223 C.1 1813 Rubs Dr,Suite C-Livermore,CA 9455 a P:(503)641-8311 F: (503)643-7905 wrwrafadg.com AL CALCULATIONS STRUCTURAREVISIONL #1 Dirksen Boardwalk REVISION Dirksen Nature Park, Tigard, OR OFFICE COPY TerraFirma Foundation Systems �0) PROPe.0 ,C.� 69022PE • OREGON Ar d-N v��X09- , b . ' 5 ' A?Ey S. EXPIRES: 1ZI-1-17 LIMITATIONS THIS N ENGINEER WAS RETAINED IN A LIMITED CAPACNTWHO IS SSOL PROJECT. C DESGN IS BASEDE UPON INFORMATION PROVIDED BY THE CLI Y R ILITY IS ASSUMED BY, R IS TO B ACCURACY OF SAME.NO RESPONSIBILITY S BEYOOND BST SHOWN ON THESE SOHEETS. ASSIGNED TO THE ENGINEER FOR ITE Project No.TF17-043 May 26,2017 Revised: August 25,2017 SFA Design Group, Sid STRUCTURAL LLC I CIVIL I LAND USE PLANNING PROJECT PROJECT NO. TEl SHEET NO. Dirksen Boardwalk SUBJECT DATE Helical Pier Design Requirements 8/25/2017 BY Structural Narrative JLD The structural calculations and drawings enclosed are in reference to the design located in Tigard, OR as referenced on the coversheet. The round steel tubes and retrofit in Tigard, Pier referenced are continuously eet.hydraulicallyT torqued into the en foundation brackets underpinning t the boardwalk nrlift encountered. Lateral earth confinement provides additional stiffness to resist eccentric loading ckets are used to stabilize and/or lift required to resist al ofrom the rboardwalkis aPer the following calculation,ntriclow until a from theh bearing tion. Theis required battered lateral vertical al tiebacks. ance willlibe. rpiers are There is no ICC-ES report currently approved for underpinningsystems lateral resistance be provided by entire underpinning system has been reviewed and analyzed and is therefore a fully engineered codes and stamped by a licensed design professional. Deep foundation within Seismic Design Category D or higher,thus the codetesting requirementsgug system ions,special inspection with all current per IBC 2015 have been included.Axial and bending capacities oelines, f extercombinanal sleeve,analysis foundation bracket,design reductions,and corrosion considerations have been incorporated and foundation on braeConcrete ,foundationign uan capacities have been analyzed y o calculations the retrofit 3bBehlen Mfg Coconforming to AWS D1.1 performhave eay CWB per ACI318-14. Bracket fabrication welding habeen per AISC performed In addition, Behlen Mfg Co. has received US99/1690 certification meeting SOfied d90012008�toq CSA Standard AB accredited in Division 2. General requirements by ANAB SGS. Building Department Building Code Conformance(Meets Or Exceeds Requirements) 2015 International Buildin City of Tigard ) 2015 International Residential Code(IRC) 2014 Oregon Structural Specialty Code(OSSC) 2014 Oregon Residential Specialty Code(ORSC) Dead Loads Boardwalk Dead Load Live Loads 20.0 psf Boardwalk Live Load(Residential) 90.0 psf SFA Deign Group, LLc PROJECT NO. SHEET NO. STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Design Loads JLD !Worst Case Vertical Design Loads wl Tieback Load Tributary Width To Anchor= =5.25 ft BoardwalkoL= (20 psf) (10.88 ft) =218 plf Dead Load 1.142 kips Boardwalku.= (90 psf) (10.88 ft) =979 plf Floor Live Load 5.138 kips TiebackEL= =8008 lb Roof Live Load 0.000 kips Controlling ASD Load Combination: D+0.75(0.7E(+))+.75L+.75Lr Max Vertical Load to Worst Case Pier 9.200 kips SFA Design Group, ticsfa PROJECT NO. SHEET NO. 5-R.,.T'J AL CIVIL I LAID LS: PLA\NIIC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Pier System JLD Design Input R/P ENS RACTA7! Pier System Designation= HP237 NEW ."ENNTRI:CION I f Vertical Load to Pier,PTL= 9.200 kips 9""K-I Minimum Installation Depth,L= 15.000 ft Exc+wnoN- Unbraced Length,I= 6.000 ft \ L' Eccentricity,e= 0.500 in Design Load, Pm_= 9.200 kips Design Moment,MomentpieroL= 4.600 kip-in W- Pier Property Input Design Tube OD= 2.353 in _ PER ~ HELIX BLADE(D3) Design Wall Thickness= 0.143 in t t ti k= 0.65 r= 0.783 in 11/1- H1Ut BADE.D2) A= 0.994 int it Note: Design thickness of pier and sleeve based c= 1.177 in on 93%of nominal thickness per AISC and the S= 0.518 in3 ICC-ES AC358 based on a corrosion loss rate of to HELIX BLADE(DI) 50 years for zinc-coated steel Z= 0.701 in3 I= 0.610 in4 Note:Section above is a general representation of piering system, E= 29000 ksi refer to plan for layout and project specific details. Fy= 50 ksi !Pier Output Per AISC 325-11 Doubly and Singly Symmetric Members Subject To Flexure and Axial Force kl/r= 59.76 OK,<200 §E2 Fe= 80.102 ksi §(E3-4) 4.71*(E/Fy)'5= 113.43 §E3 Fcr= 38.504 ksi §(E3-2&E3-3) Pn= 38.3 kips §(E3-1) Safety Factor for Compression,Qc= 1.67 Allowable Axial Compressive Strength,Pn/D = 22.9 kips §E1 Actual Axial Compressive Demand,Pr= 9.200 kips D/tpier= 16.4 OK,<.45E/Fy §F8 Mp= 35.0 kip-in §(F8-1) Safety Factor for Flexure,Db= 1.67 Allowable Flexural Strength,Mn/Qb= 21.0 kip-in §F1 Actual Flexural Demand,Mr= 4.6 kip-in Combined Axial&Flexure Check= 0.60 OK §(H1-1a&1b) Helix Properties and Capacity Fyh= 50 ksi Fbh=0.75*Fyh= 37.500 ksi Di = 10 in Ai =p*D12/4= 78.5 int ti = 0.375 in Si = 1112/6= 0.023 in3 01 =Ai*wi = 36.1 kips w1 = 0.460 ksi D2= 12 in A2=p*D22/4-p*(Tube OD)2/4= 108.7 int t2= 0.375 in S2= 1122/6= 0.023 in3 Q2=A2*w2= 39.6 kips W2= 0.364 ksi D3= 0 in A3=p*D32/4-p*(Tube OD)2/4= 0.0 in2 t3= 0.000 in S3= 1*t32/6= 0.000 in3 Q3=A3*w3= 0.0 kips w3= 0.000 ksi ZO= 75.7 kips OK I Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli Ri = 1.758 kli Weld OK R2= 1.758 kli Weld OK R3= 0.000 kli , I Soil-Individual Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count,N= 17 Ref Table A-1 FAh=Al+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf Nc= 9 Q„=/Ah(cNc)= 24.874 kips Oa,compression/tension=a,IFS= 12.437 kips OK Cohesive Controls I Soil-individual Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 y= 110pcf 0= 32° Ref Table 3-4 Depth of Helix,Di = 14.500 ft Depth of Helix, D2= 12.000 ft Depth of Helix, D3= 0.000 ft q'i =y*D1 = 1595.0 psf q'2=y'D2= 1320.0 psf q'3=y*D3= 0.0 psf Ng=1+0.56(12*0)°/M= 20.04 (for 0=32q Q1 =At(q'iNg)= 17.433 kips Q2u=A2(q'2Nq)= 19.976 kips 03u=A3(43Nq)= 0.000 kips Qa,compressbnttension=FQu/FS= 18.704 kips OK Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 633 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor,Kt= 10 ft-' Final Installation Torque,T= 1900 lb-ft Ultimate Pile Capacity,Qu= 19.000 kips Allowable Pile Capacity,Oa= 9.500 kips OK Results Max Load To Pier=Design Load=9200 lb 2.375"Diameter Pipe Pier with 0.154"Thick Wall 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side of Helix to Pier Minimum 15'-0"Installation Depth And Minimum 1900 ft-lb Installation Torque 5FA Design Group,uc ""1" STRUCTURAL I CIVIL I LAND USE PLANNING PROJECT NO. SHEET NO. TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Seismic Design Criteria JLD ASCE 7-10 Chapters 11&12 Soil Site Class= D Tab.20.3-1,(Default=D) Response Spectral Acc.(0.2 sec)S8=96.80%g =0.968g Figs.22-1,22-3,22-5,22-6 Response Spectral Acc.(1.0 sec)Si=42.30%g =0.423g Figs.22-2,22-4,22-5,22-6 Site Coefficient F8 =1.113 Tab. 11.4-1 Site Coefficient F„ =1.577 Tab. 11.4-2 Max Considered Earthquake Acc.SMs= F8.58 =1.077g (11.4-1) Max Considered Earthquake Acc.SM,= F,.S, =0.667g (11.4-2) @ 5%Damped Design SDs=2/3(SMs) =0.718g (11.4-3) 5D1=2/3(SM1) =0.445g (11.4-4) Risk Category= II,Standard Tab. 1.5-1 Flexible Diaphragm §12.3.1 Seismic Design Category for 0.1 sec D Tab. 11.6-1 Seismic Design Category for 1.0 sec D Tab. 11.6-2 S1 <0.75g N/A §11.6 Since Ta<.8Ts(see below),SDC= D Exception of§11.6 does not apply §12.8 Equivalent Lateral Force Procedure G.CANTILEVERED COLUMN SYSTEMS DETAILED Tab. 12.2-1 Seismic Force Resisting System(E-W)6.Timber frames G.CANTILEVERED COLUMN SYSTEMS DETAILED Tab. 12.2-1 Seismic Force Resisting System(N-S)6.Timber frames C,=0.016 x=0.90 Tab. 12.8-2 Structural height h„=6.5 ft Structural Height Limit=35.0 ft Tab. 12.2-1 C,= 1.400 for SDI of 0.445g Tab. 12.8-1 Approx Fundamental period,T8=C,(h„)8 =0.086 (12.8-7) TL= 12 sec Figs.22-12 through 22-16 Calculated T shall not exceed<_ C5Ta =0.121 UseT= 0.09 sec 0.8Ts= 0.8(So,/Sos) =0.495 Exception of§11.6 does not apply is structure Regular&s 5 stories? Yes §12.8.1.3 Max Sss0.15g Response Modification Coefficient R= 1.5 1.5 Tab. 12.2-1 Over Strength Factor fl = 2 2 (foot note g) Importance factor 18= 1.00 1.00 Tab. 11.5-1 Seismic Base Shear V= C8 W C8 W C5= 5.Ds =0.479 5.es =0.479 (12.8-2) R/18 R/l8 or need not to exceed,C8= 5ni =3.438 5.1m. =3.438 For T s TL (12.8-3) (R/ie)T (R/ie)T or C8= Sn1Ti N/A S",T, N/A For T>TL (12.8-4) T2(R/18) T2(R/ie) Min C5= 0.55,18/R N/A 0.5S11e/R N/A For S,2 0.6g(12.8-6) Use C8= 0.479 0.479 Design base shear V= 0.479 W 0.479 W C SFA Design Group, LLC 5 d STRUCTURAL I CIVIL I LAND USE PLANNING PROJECT NO. SHEET NO. TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline A JLD 'Seismic Base Shear Along Gridline A BoardwalkDL= (20 psf) 153.0 ft2 =3060 lb Base shear = 0.479 W Design base shear VSEISMIC= 3060 lbs ASD(70%)base shear VSEIS= 2142 lbs 4Seismic Controls Worst Case Lateral Load Along Gridline A=2142 lbs SFA Design Group, LLE Ufa PROJECT NO. SHEET NO. 5-R..CTU .AL CIVIL ( LAID LSE PLA\NI'iC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design Input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,y= 110 pcf Angle of Internal Soil Friction,0= 32° Applied Loads Seismic VHORIZ-E= 2.142 kips Vertical Load Tieback,Tcv= 2.142 kips Tension Load to Anchor,TR= 3.029 kips HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK Helix Properties and Capacity Fyn= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Al =7t*Di2/4-7C*(Wshan)2/4= 76.8 int ti = 0.375 in Si = 1112/6= 0.023 in3 Qi =Ai*wi = 22.9 kips wi = 0.298 ksi D2= 12 in A2=><*D22/4-lt*(Wshan)2/4= 111.3 int t2= 0.375 in S2= 1*t22/6= 0.023 in3 Q2=A2*w2= 26.8 kips W2= 0.241 ksi D3= 0 in A3=n*D32/4-7<*(Wshaft)2/4= 0.0 in2 t3= 0.000 in S3= 1'132/6= 0.000 in3 Q3=A3*w3= 0.0 kips w3= 0.000 ksi EQ= 49.7 kips OK I Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli R� = 1.266 kli Weld OK R2= 1.266 kli Weld OK R3= 0.000 kll I Soil-individucal Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 An=Al+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf N�= 9 Qu=EAn(cNc)= 24.982 kips Qa compression/tension=QU/FS= 12.491 kips OK 4 Cohesive Controls 1 Soil-Individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110 pcf = 32° Ref Table 3-4 Failure Plane Wedge Angle,9= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =y*Di = 1237.8 psf q'2=y*D2= 1043.4 psf q'3=y*D3= 0.0 psf Ng= 1+0.56(12*0)" = 20.04 (for 0=32°) Qt u=At(q't Ng)= 13.225 kips Q2u=A2(q'2Nq)= 16.165 kips 03u=A3(q'3Nq)= 0.000 kips Oa,compression/tension=ECL/FS= 14.695 kips OK `Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 333 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor, Kt= 10 ft" Final Installation Torque,T= 1000 lb-ft Ultimate Pile Capacity,Qu= 10.000 kips Allowable Pile Capacity,Oa= 5.000 kips OK I Results Max Load To Tieback=Design Load=3029 lb "2.375 in Diameter Tieback Installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"Installation Length And 1000 Ib-ft installation Torque • C SFA Design Group, lux PROJECT NO. SHEET NO. 5 f a STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline B JLD !Seismic Base Shear Along Gridline B BoardwalkDL= (20 psf) 572.0 ft2 = 11440 lb Base shear = 0.479 W Design base shear VSEISMIC= 11440 lbs ASD(70%)base shear VsEIs= 8008 lbs 4Seismic Controls Worst Case Lateral Load Along Gridline A=8008 lbs • SFA Design Group, LIE sfa PROJECT NO. SHEET NO. 5-R..LTU1AL CIVIL I LA AD LSE PI \NI•JC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,y= 110 pcf Angle of Internal Soil Friction,0= 32° Applied Loads Seismic VHORIZ-E= 8.008 kips Vertical Load Tieback,Tcv= 8.008 kips Tension Load to Anchor,TR= 11.325 kips I HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK I Helix Properties and Capacity, Fyn= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Ai =7t*Di2/4-7t*(Wshaft)2/4= 76.8 int ti = 0.375 in Si =1*t12/6= 0.023 in3 Qi =Al*wi = 22.9 kips wi = 0.298 ksi D2= 12 in A2=7t*D22/4-7t*(Wshaft)2/4= 111.3 int t2= 0.375 in S2= 1122/6= 0.023 in3 Q2=A2*W2= 26.8 kips w2= 0.241 ksi D3= 0 in A3=7C1332/4-7t*(Wshaft)2/4= 0.0 in2 t3= 0.000 in S3=1132/6= 0.000 in3 Q3=A3*w3= 0.0 kips W3= 0.000 ksi EQ= 49.7 kips OK I Helix Weld to Pler Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli Ri = 1.266 kli Weld OK R2= 1.266 kit Weld OK R3= 0.000 kll I Soil-Individucal Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 EAn=At+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf N�= 9 Qu=EAn(ck)= 24.982 kips Oa,compression/tension=0U/FS= 12.491 kips OK I Cohesive Controls Soil;-Individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110pcf 0= 32° Ref Table 3-4 Failure Plane Wedge Angle,0= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =7*Di = 1237.8 psf q'2=-y*D2= 1043.4 psf q'3=y'D3= 0.0 psf Nq= 1+0.56(12*0)m/54= 20.04 (for 0=32°) Q1 u=At(q'i Nq)= 13.225 kips Q2„=A2(q'2Nq)= 16.165 kips 03u=A3(q'3Nq)= 0.000 kips Oa,compress onnension=EQ„/FS= 14.695 kips OK Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 757 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor, Kt= 10 ft', Final Installation Torque,T= 2270 lb-ft Ultimate Pile Capacity,Qu= 22.700 kips Allowable Pile Capacity,Qa= 11.350 kips OK Results Max Load To Tieback=Design Load=11325 lb "2.375 in Diameter Tieback Installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"installation Length And 2270 lb-ft Installation Torque SFA Design Group. LLC PROJECT NO. SHEET NO. STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline D JLD Seismic Base Shear Along Gridline D BoardwalkDL= (20 psf) 356.0 ft2 =7120 lb Base shear = 0.479 W Design base shear VSEISMIC= 7120 lbs ASD(70%)base shear VsEIs= 4984 lbs 41Seismic Controls Worst Case Lateral Load Along Gridline A=4984 lbs C- SFA Design Group., win g i�+ LLE PROJECT NO. SHEET NO. c-•.0C1'J iAL CIVIL I LAO IS: PLA\NI'IC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design Input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,y= 110 pcf Angle of Internal Soil Friction,0= 32° Applied Loads Seismic VHORIZ-E= 4.984 kips Vertical Load Tieback,Tcv= 4.984 kips Tension Load to Anchor,TR= 7.048 kips HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK , I Helix Properties and Capacity Fyh= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Al =7t*D12/4-7t*(Wshan)2/4= 76.8 int ti = 0.375 in Si = 1*t12/6= 0.023 in3 Qi =Al*w1 = 22.9 kips w1 = 0.298 ksi D2= 12 in A2=7t*D22/4-1t*(Wshaft)2/4= 111.3 in2 t2= 0.375 in S2=1122/6= 0.023 in3 Q2=A2*W2= 26.8 kips W2= 0.241 ksi D3= 0 in A3=7t*D32/4-7t*(Wshaft)2/4= 0.0 int t3= 0.000 in S3= 1132/6= 0.000 in3 03=A3*w3= 0.0 kips W3= 0.000 ksi EQ= 49.7 kips OK Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli Ri = 1.266 kli Weld OK R2= 1.266 kli Weld OK R3= 0.000 kli I Soil-Individucal Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 yAh=At+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf N0= 9 Qu=EAh(cN°)= 24.982 kips Oa,aompmssionitension=Qu/FS= 12.491 kips OK 4 Cohesive Controls Soil-Individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110pcf 0= 32° Ref Table 3-4 Failure Plane Wedge Angle, 8= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =v*Di = 1237.8 psf q'2=7*D2= 1043.4 psf q'3=7 D3= 0.0 psf Nq= 1+0.56(12*0)"4= 20.04 (for 0=32q Qi,=A1(q'iNq) = 13.225 kips Q2u=A2(q'2Nq)= 16.165 kips Q3u=A3(q'3Nq)= 0.000 kips Qe,compression/tension=EQu/FS= 14.695 kips OK I Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 667 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor, Kt= 10 ft_, Final Installation Torque,T= 2000 lb-ft Ultimate Pile Capacity,Qu= 20.000 kips Allowable Pile Capacity,Oa= 10.000 kips OK `Results Max Load To Tieback=Design Load=7048 lb "2.375 in Diameter Tieback Installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"Installation Length And 2000 lb-ft Installation Torque III • SFA Design Group. LLC PROJECT NO. SHEET NO. STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline 1 JLD Seismic Base Shear Along Gridline 1 BoardwalkDL= (20 psf) 228.0 ft2 =4560 lb Base shear = 0.479 W Design base shear VSEISMIC= 4560 lbs ASD(70%)base shear VSEIS= 3192 lbs 4Seismic Controls Worst Case Lateral Load Along Gridline A=3192 lbs SFA Design Group, LIE • ista PROJECT NO. SHEET NO. 5 R LTUirI CR/IL I LAID LSE PLA\NI''IC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design Input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,y= 110 pcf Angle of Internal Soil Friction,m= 32° [Applied Loads Seismic VHORIZ-E= 3.192 kips Vertical Load Tieback,Tcv= 3.192 kips Tension Load to Anchor,TR= 4.514 kips I HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK I Helix Properties and Capacity Fyh= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Al =7t*D12/4-1E*(Wshat02/4= 76.8 int ti = 0.375 in Si =1*t12/6= 0.023 in3 Q1 =Al*w1 = 22.9 kips wi = 0.298 ksi D2= 12 in A2=7t*D22/4-7*(Wshatt)2/4= 111.3 int t2= 0.375 in S2= 1122/6= 0.023 in3 Q2=A2*w2= 26.8 kips W2= 0.241 ksi D3= 0 in A3=n*D32/4-n*(Wshatt)2/4= 0.0 in2 t3= 0.000 in S3= 1132/6= 0.000 in3 Q3=A3*w3= 0.0 kips w3= 0.000 ksi EQ= 49.7 kips OK Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli R� = 1.266 kli Weld OK R2= 1.266 Id Weld OK R3= 0.000 kli Soil-Individucal Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 EAh=At+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf N�= 9 Q„=EAn(cNc)= 24.982 kips Os,compressionflenston=Du/FS= 12.491 kips OK t Cohesive Controls Soli-Individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110 pcf = 32° Ref Table 3-4 Failure Plane Wedge Angle,0= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =7*D1 = 1237.8 psf q'2=7*D2= 1043.4 psf q'3=7*D3= 0.0 psf Ng= 1+0.56(12*(6)"4= 20.04 (for 0=32� Q1,=A1(q'1Ng)= 13.225 kips Q2„=A2(q'2Nq)= 16.165 kips Q3„=A3(q'3Ngj= 0.000 kips Os,compresslon/tenston=EOp/FS= 14.695 kips OK Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 333 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor, Kt= 10 ft-, Final Installation Torque,T= 1000 lb-ft Ultimate Pile Capacity,Qu= 10.000 kips Allowable Pile Capacity,Oa= 5.000 kips OK Results, Max Load To Tieback=Design Load=4514 Ib "2.375 in Diameter Tieback Installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"Installation Length And 1000 lb-ft installation Torque SFA Design Group, ux PROJECT NO. SHEET NO. STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline 2 JLD Seismic Base Shear Along Gridline 2 BoardwalkoL= (20 psf) 474.0 ft2 =9480 lb Base shear = 0.479 W Design base shear VSEISMIc= 9480 lbs ASD(70%)base shear VsEIs= 6636 lbs lSeismic Controls Worst Case Lateral Load Along Gridline A=6636 lbs SFA Design Group, LLC sfri5-R CT'J AL PROJECT NO. SHEET NO. CML LAND LSE PLA 11,411C TEl PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design Input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,'y= 110 pcf Angle of Internal Soil Friction,0= 32° Applied Loads Seismic VHORIZ-E= 6.636 kips Vertical Load Tieback,Tcv= 6.636 kips Tension Load to Anchor,TR= 9.385 kips I HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK . I Helix Properties and Capacity Fyh= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Ai =7t*Di2/4-e(Wshaft)2/4= 76.8 in2 ti = 0.375 in Si = 1*tie/6= 0.023 in3 Qi =Al*wi = 22.9 kips wi = 0.298 ksi D2= 12 in A2=it*D22/4-7t*(Wshaft)2/4= 111.3 int t2= 0.375 in S2= 1122/6= 0.023 in3 Q2=A2*w2= 26.8 kips W2= 0.241 ksi D3= 0 in A3=7t*D32/4-7t*(Wshaft)2/4= 0.0 int t3= 0.000 in S3= 1132/6= 0.000 in3 Q3=A3*W3= 0.0 kips W3= 0.000 ksi EQ= 49.7 kips OK Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli Ri = 1.266 kli Weld OK R2= 1.266 kli Weld OK R3= 0.000 kli I Soil-Individucai Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 EAn=Al+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf N�= 9 Q„=IAn(cNc)= 24.982 kips Oa,compression/tension=Q,,/FS= 12.491 kips OK 44 Cohesive Controls I Soil-individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110 pcf 0= 32° Ref Table 3-4 Failure Plane Wedge Angle,8= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =y*Di = 1237.8 psf q'2=7 D2= 1043.4 psf q'3=y`D3= 0.0 psf Ng= 1+0.56(12*0)°54= 20.04 (for 0=32°) Qi u=Ai(q't Ng)= 13.225 kips Q2„=A2(q'2Nq)= 16.165 kips Q3u=A3(q'3Nq)= 0.000 kips Oa,oomprassloNlenslon=EQu/FS= 14.695 kips OK I Soil-Torque Correlation Method-Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 667 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor, Kt= 10 ft-I Final Installation Torque,T= 2000 lb-ft Ultimate Pile Capacity,Qu= 20.000 kips Allowable Pile Capacity,Oa= 10.000 kips OK I Results Max Load To Tieback=Design Load=9385 lb "2.375 in Diameter Tieback Installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"Installation Length And 2000 lb-ft Installation Torque 5FA Design Group, u c PROJECT NO. SHEET NO. " STRUCTURAL I CIVIL I LAND USE PLANNING TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Lateral Design Loads Along Gridline 3/4 JLD Seismic Base Shear Along Gridline 3/4 BoardwalkDL= (20 psf) 269.0 ft2 =5380 lb Base shear = 0.479 W Design base shear VsEISMIC= 5380 lbs ASD(70%)base shear VsEIs= 3766 lbs /Seismic Controls Worst Case Lateral Load Along Gridline A=3766 lbs SFA Design Group, LLC sfa PROJECT NO. SHEET NO. sr..CTU SAL CIVIL I LA'D IS: PIA\NIIC TF17-043 PROJECT DATE Dirksen Boardwalk 8/25/2017 SUBJECT BY Foundation Supportworks HP237 Helical Tieback JLD Design Input Finish on Shaft= Plain Depth to Centerline of Anchor, Pv= 1.000 ft Tieback Installation Length,AT= 15.000 ft Angle of Tieback Downward from Horizontal,a= 45° Soil Unit Weight,y= 110 pcf Angle of Internal Soil Friction,cD= 32° (Applied Loads Seismic VHOR¢-E= 3.766 kips Vertical Load Tieback,Tcv= 3.766 kips Tension Load to Anchor,TR= 5.326 kips HP237 Square Shaft Coupler Bolt diameter= 0.750 in Bolt Grade= A490 Double Shear Capacity= 24.700 kips OK , I Helix Properties and Capacity Fyn= 36 ksi Fbh=0.75*Fyh= 27.000 ksi Di = 10 in Al =7t*Di2/4-it*(Wshaft)2/4= 76.8 int ti = 0.375 in Si = 1112/6= 0.023 in3 01 =Ai*wi = 22.9 kips wi = 0.298 ksi D2= 12 in A2=it*D22/4-71*(Wshan)2/4= 111.3 in2 t2= 0.375 in S2= 1122/6= 0.023 in3 02=A2*W2= 26.8 kips w2= 0.241 ksi D3= 0 in A3=x*D32/4-it*(Wshafl)2/4= 0.0 in2 t3= 0.000 in S3= 1132/6= 0.000 in3 G13=A3*w3= 0.0 kips W3= 0.000 ksi EQ= 49.7 kips OK Helix Weld to Pier Capacity E70 Electrodes= 70 ksi Size of Fillet Both Sides= 0.250 in Capacity of Fillet Both Sides= 7.424 kli Ri = 1.266 kli Weld OK R2= 1.266 kli Weld OK R3= 0.000 kli Soil-Individucal Bearing Method-Cohesive Factor of Safety= 2.0 Blow Count, N= 17 Ref Table A-1 EAh=Al+A2+A3= 1.3 ft2 Cohesion,c= 2.125 ksf Nc= 9 Qu=EA4(cNc)= 24.982 kips Oa,compresalon/tendon=Qu/FS= 12.491 kips OK 1 Cohesive Controls I Soil-Individucal Bearing Method-Non-Cohesive Factor of Safety, FS= 2.0 7= 110 pcf 0= 32° Ref Table 3-4 Failure Plane Wedge Angle,e= 29° Lead Helix Horizontal Length,An= 10.607 ft Depth of Helix, Di = 11.253 ft Depth of Helix, D2= 9.485 ft Depth of Helix, D3= 0.000 ft q'i =y*Di = 1237.8 psf 42=7*D2= 1043.4 psf q'3=y*D3= 0.0 psf Ng= 1+0.56(12*0) 54= 20.04 (for 0=32°) Qiu=A1(q'iNq)= 13.225 kips Q2u=A2(q'2Nq)= 16.165 kips Qiu=A3(q'3Nq)= 0.000 kips Oa,compression/tension=Eau/FS= 14.695 kips OK Soil-Torque Correlation Method Verification Factor of Safety, FS= 2.0 Installation Torque Pressure,qi= 667 psi Installation Pressure to Torque Conversion Factor= 3.00 Emperical Torque Correleation Factor,Kt= 10 ft-1 Final Installation Torque,T= 2000 lb-ft Ultimate Pile Capacity,Qu= 20.000 kips Allowable Pile Capacity,Oa= 10.000 kips OK Results Max Load To Tieback=Design Load=5326 lb "2.375 in Diameter Tieback installed at a 45 Degree Angle 0.375"Thick 10/12"Helix With 0.25"Fillet Welds Each Side Of Helix To Pipe Pier Minimum 15'-0"installation Length And 2000 lb-ft Installation Torque