Loading...
Report (59) • SHEET METAL WORK 7090 'Se ,'y5 "/ eae'#t9 /( M • AIR CONDITIONING "'"'7 • HEAT PUMPS • FURNACES Salem 11 [ Flilli & Sheet Metal Iac. 1 2 2 5 2 2nd STREET S . E . P.O. BOX 12005 • SALEM, OREGON 97309 Phone 503-581-1536 • Fax 503-370-3780 August 23, 2017 City of Tigard °NF D Attn: Dan Nelson AUG 22 2017 Re: MEC2017-00428 Review Comments cm(c* B .€'; D;;NP kit !3h Mr Nelson- As requested, please see additional information below/attached regarding subject project. Item #1 — New Ductwork is shown on drawings, all other ductwork is existing and will remain in use Item #2 — Please see attached plan showing grease duct termination in relation to property line (47'). Item #3 — Furnace venting material shall be B-Vent, see attached drawing. Item #4—The grease duct will be 16 gauge fully welded seams with 2 layers of attached insulation installed per the manufacturer's specifications. Item #5 — Please see attached attachment detail of the makeup air unit. Please let me know if you need anything additional. Sincerely- rooks Gladow Jwl _ft Is 44.<.--1 ,ELaI CC ti LI Morgan cAdvanced Materials FIR • FireMaster°aFastWrap° XL 1:t Dataslteet Code US: 714-236 ® 2014 Thermal Ceramics is a business of Morgan Advanced Materials Product Features •Thin and Lightweight at 1-1/2" (38mm)thick, 6 pcf(96 kg/m3) density ' -7; ,44t4' •Contours easily to complex duct designs tr t f •Grease duct installation UL and ULC Listed with butt >2 joints at all seams on both layers f ` •Fully foil encapsulated for fast and clean installation }" •Contains 2192°F (1200°C) rated fibers •Microbial Resistance validated by UL Environment •Good sound absorption "ham _ •Compliant to IMC, NFPA 96, UMC, CMC, CNBC 2.Applications ® �‘,..SS/F/tt►O ICC •2 hour enclosure and firestop system for kitchen exhaus duct U •Zero clearance to combustibles LISTED • 1,2 and 3 hour enclosure and firestop system for vgATD hazardous exhaust ducts, pressurization ducts, clothes ° dryer exhaust ducts,trash and linen chutes, and other 31=144+'" SRfON fire rated HVAC ducts eitteMASTERFActleeitSfin IS DR&515Y A yE • 1 hour electrical circuit integrity protection AT1EYiIt '- • Engineered and tested solutions for fire protection of 'Commonly referred to test method CA Section 01350 is COPH Standard Method for the Testing structural steel and storage vessels per ASTM E119, and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers Version 1.1 Feb 2010 ISO 834, and UL1709 Grease Duct Enclosure System 3.Specifications-Division 23 07 00(or 15080) Air Ventilation Duct Enclosure System CSI Spec and AutoCAD available online, Product Data&Installation Guide www.arcat.com/sd/clients/thermcer.html. Thermal Ceramics FireMaster FastWrap XL is a flexible 1. Product Description high temperature insulation rated to 2192°F (1200°C) Thermal Ceramics FireMaster®FastWrap XL is a flexible that is fully encapsulated in FSP facing. The duct blanket composed of high temperature fibers classified for enclosure system shall be listed by UL and/or ULC per applications to 2192°F(1200°C)and fully encapsulated in ASTM E 2336, CAN/ULC S144 and ISO 6944 for a durable glass fiber reinforced foil facing for easy handling 1-, 2-and 3-hour rating and zero clearance to and installation. Thermal Ceramics FastWrap XL is UL and combustibles, and tested per ASTM E84 for a flame/ ULC Listed for 1 and 2 hour fire resistive enclosure smoke rating less than 25/50. Insulation shall have a protection,zero clearance for kitchen exhaust ducts, nominal thickness of 1-1/2 inches(38 mm) and density electrical circuit protection, and as a component in UL of 6 lbs/ft3(96 kg/m3). Insulation shall have a R-Value of firestop designs for fire resistance rated floors, ceilings, and 7.3 at 75°F. Installation shall be in strict accordance to walls. The core fibers in FastWrap XL are manufactured manufacturers published installation instructions, UL or using Thermal Ceramics patented Superwool®fiber which is ULC Listings, and shop drawings. FastDoorTM XL shall an alkaline-earth silicate wool with low biopersistence and be used for duct access where specified or as required therefore increased safety for installers. FastWrap XL is by code. under UL's Follow-Up Service Program to ensure the consistent quality essential to this life-safety application. www.morganthermalceramics.com • 12:2014 Page 1of8 • V Morgan IIC Advanced Materials Firell FireMaster® FastWrap® XL 4. Physical Characteristics 6. Listings/Building Code Reports Product Unit Size Units/ Wt./ Listed Uses Agency Listing Layers Ctn. Ctn. Grease Duct Enclosure per UL G18 FastWrap XL Roll 1-1/2"x 24"x 25' 1 37.5 lbs. ASTM E2336 and AC101 (2006, 2 2009,2012 IMC,NFPA 96, ICC-ES ESR 2213 FastWrap XL Roll 1-1/2"x 48"x 25' 1 75 lbs. UMC,CMC) ULC Grease Duct Test Protocol ULC FRD 4,7' 2 5. Performance Specifications and CAN/ULC S144* Reference Standard Standard No. Performance Grease Duct Insulation OPL TC/BI 120-01 1 (2003 IMC) Grease Duct Enclosure ASTM E2336 Pass Through Penetration FireStop UL System System per ASTM E814, ULC See Figure 2 1 or 2 Section 16.1 - ASTM E136 Pass UL 1479 Non-Combustibility UL HNLJ.V1, Section 16.2-Fire Resistance ASTM E119 Pass 1-or 2-hour Ventilation Duct 19,29 (wall) 1 Enclosure per ISO 6944-1985 FRD 3,5, Section 16.3-Durability Test ASTM C518 Pass ULC 6,18 Section 16.4-Internal Fire ASTM E2336 Pass 3-hour Ventilation Duct Test Enclosure per ISO 6944-1985 UL HNLJ.V2 2 Section 16.5-Fire Engulfment ASTM E814/ Pass Electrical Circuit Protective UL FHIT.5 2 (duct) E119 System ULC Grease Duct Test Pass Protocol Standard Methods of Fire 7.Storage Resistance Tests-Grease CAN/ULC Pass S144 Thermal Ceramics FastWrap XL must be stored in a dry Duct Assemblies warehouse environment on pallets. Pallets should not be Grease Duct Clearances UL 1978 Pass stacked. Air Ventilation Duct Enclosure ISO 6944 Pass 8. Installation Surface Burning ASTM E84 <25/50 Characteristics Thermal Ceramics FastWrap XL shall be installed by a Thermal Resistance ASTM C518 7.3 per layer qualified contractor in accordance with manufacturer's (R-value @ 75°F) instructions and laboratory design listings. Mold Growth ASTM C1338 ULE Validated Materials and Equipment Low VOCs CA Standard ULE Validated •Thermal Ceramics FastWrap XL blanket 01350 •Aluminum foil tape •Glass filament reinforced tape (optional) •Carbon steel or stainless steel banding material, minimum 1/2" (13mm)wide, minimum 0.015" (0.4mm) thick,with steel banding clips • Hand banding tensioner and crimping tool • Minimum 12 gage(3mm) steel insulation pins; steel speed clips, minimum 1-1/2" (38mm)square or 1-1/2" (38mm)diameter, or equivalent sized cup-head pins; •Capacitor discharge stud gun •Thermal Ceramics FastDoorTM XL •An approved firestop sealant www.morganthermalceramics.com 122014 Page 2 of 8 11 Morgan EAdvanced Materials FIR ER' FireMas er° FastWrap® XL el General and collar method. The banding is placed around the Cut edges of the blanket shall be taped with aluminum foil blanket and tightened to firmly hold the FastWrap XL in tape to prevent exposed edges of the insulation absorbing place against the duct, but not cause any cutting or grease and moisture in the event of a compromised grease damage to the blanket. duct joint or condensation. Overlaps and/or tightly butted 2) Pinning-Pinning on all sides of the duct may be used joints are used to block heat transfer in the event of duct as an alternative to banding. For ducts wider than 24" deformation resulting from thermal expansion. Filament (610mm)pinning is required on the bottom of horizontal tape is suggested to hold the blanket in place until steel runs, or on one side of vertical runs(in addition to steel banding or pinning is installed to permanently secure the banding). When applicable, 12 Gage(0.4mm)steel pins blanket. are installed on 12" (305mm)centers along the width of A. Installation on Grease Duct per ASTM E2336 and the duct and 10-1/2"(270mm)centers along the length CAN/ULC S144(Figure 1) of the duct. Pins that extend beyond the outer blanket layer shall be turned down or the excessive length cut System requires two layers of insulation applied directly to off to prevent sharp edges. Shoot through pins(cup the duct with tight butt joints at all seams on both layers. head pins) may be used in conjunction with steel The first layer of insulation is cut to a length sufficient to banding to prevent blanket sag. wrap around the duct and provide a tight butt joint where the blanket ends meet. Adjacent blankets on the first layer E.Access Doors are butted tightly together with longitudinal seams offset 1) FastDoorTM XL(Figure 3)-FastDoor XL is a UL Listed, minimum 6" (150mm). The second layer of insulation is liquid tight duct cover panel supplied complete with a installed in the same method as the first layer,with seams single layer insulation cover per UL Listing HNKT G18. between layers offset a minimum of 6" (150mm). Banding The FastDoor XL is installed per included installation and/or pinning per Section D is used to permanently instructions. No field welding is required. secure the insulation to the duct. 2)Field Fabricated Access Doors-Each access door B.Installation on HVAC Duct per ISO 6944(Figure 1) assembly has four threaded rods 1/4 inch(6mm)in System requires one layer of insulation applied directly to diameter and 5"(127mm)in length,with one welded to the duct with 3" (75mm)overlaps at all seams. The each corner of the door opening. Hollow steel tubes, insulation is cut to a length sufficient to wrap around the 4-1/2"(114mm)long are installed outside the access duct and provide a 3" (75mm)overlap where the blanket cover plate and over the threaded rods. Four 12 gage ends meet. Adjacent blankets are installed to provide a (3mm)and 4-1/2"(114mm)long steel insulation pins are minimum overlap of 3" (75mm). Banding and/or pinning per welded to the access cover plate to allow for installation Section D is used to permanently secure the insulation to of the three layers of FastWrap XL. One layer of the duct. FastWrap XL is cut to approximately the same size as the access panel, and impaled over the insulation pins C.2&3 Sided Wrap Installation (Figure 4) on the panel. A second layer of FastWrap XL is cut so When space does not allow for a complete wrap applied to as to overlap the first layer a minimum of 1-1/2"(38mm). the duct on all four sides,the FastWrap XL is approved for 2 It is essential that the first and second layer fit tightly or 3 sided installations with mechanical attachment to a rated against the surrounding wrap with no through openings. concrete or CMU assembly. (See Figure 4 for installation The third and outside layer should be cut to overlap the details.) second insulation layer by a minimum of 1-1/2"(38mm). D. Mechanical Attachment Methods Minimum 1-1/2"(38mm)round or square insulation clips 1) Banding (Figure 1)-Minimum 1/2" (13mm)wide are installed on the insulation pins to secure the three carbon steel or stainless steel banding, 0.015"(0.4mm) layers of insulation to the access cover plate. All cut thick, is placed around the entire perimeter of the edges of the insulation shall be taped with minimum 3" insulated duct on maximum 10-1/2" (270mm)centers (75mm)wide aluminum foil tape. Wing nuts and and 1-1/2" (38mm)from each blanket edge or 1-1/2" washers are installed on the four threaded rods, and (38mm)from each collar edge when using the butt joint tightened against the hollow steel tubes to seal the www.morganthermalceramics.com 12:2014 Page 3of8 U Morgan CAdvanced Materials f1R Pro? � FireMaster® FastWrap XI_ access cover plate to the duct. protection is required for hangers and supports meeting F.Through Penetration Firestop System(Figure 2)- the requirements of the Table below. When the duct penetrates a fire rated assembly an approved fire stop system must be employed. Figure 2 Max.Perimeter, Trapeze Support(or provides a complete list of UL/ULC firestop design Hanger Cross Section in(mm) n(mm)nt Yield Strength), listings which can be found in the Certifications Directory 1 in x 16 gage strap at www.ul.com for US systems and www.ulc.ca for (25 mm x 1.5 gage strap) 100(2540) Canadian systems. Prior to installing any firestop system 1 f(38)x 1%(38)x 316(5) 14 in(6 mm)threaded rod 50(1270) angle the surfaces of all openings and penetrating items must be clean and dry. The FastWrapXL core blanket(or 38 in(10 mm)threaded 1{(38)x 1{(38)x376(5) rod 150(3810) angle mineral wool where allowed by the firestop design listing) must be compressed into the annular space. The tlin(12.7 mm)threaded 218(5540) 2(51)x 2(51)x 14(6)angle packing material must be recessed a minimum depth from the surface of the concrete or gypsum assembly. The recessed opening must be filled with a minimum 9.Maintenance and Repair thickness of an approved firestop sealant.The packing No maintenance is required when installed in accordance material type and compression, minimum recess with Thermal Ceramics(TC)installation instructions. If (typically 1/4"(6mm)), and approved firestop sealant and damage is limited to the foil facing, aluminum foil tape can thickness(typically 1/4"(6mm))shall be as specified in an be used to repair the foil facing. If an area of blanket is approved UL/ULC firestop design listing. When there found to be damaged the following procedure must be in- is not sufficient annular space around the duct to run the corporated. If the damaged area is larger than 8"(203mm) FastWrap XL enclosure system continuous through the x 8" (203mm)the entire wrap section must be removed and fire rated assembly,the enclosure may terminate above replaced according to TC installation and below the floor/ceiling assembly or on either side of instructions. If the damaged area is small (less than 8" a wall assembly as shown in Figure 2. When this method (203mm)x 8" (203mm)),the damaged area must be cut is used,the FastWrap XL must be mechanically attached away and replaced with a new section 1" (25mm) larger in on either side of the fire rated assembly using one of the length and width than the cut out, such that the new section attachment methods described in Section D,spaced a can be compressed tightly into the cut out area. All cut maximum of 1-1/2"(38mm)from the fire rated assembly. edges of the new section must be taped and sealed with G.Support Hanger Systems aluminum foil tape. The new section must be held in place 1)Grease ducts: Trapeze support hangers shall be with either pinning or banding per TC installation i spaced on maximum 60 in. (1500 mm)centers. Hanger nstructions. rods or straps shall be anchored with steel drop in or 10. Limitations wedge expansion type masonry anchors. No additional Thermal Ceramics FireMaster FastWrap XL shall be protection is required for hangers and supports meeting installed in accordance with these installation the requirements of the Table below. instructions and appropriate laboratory design listings. The Hanger Cross Maximum Trapeze Support(or integrity of FastWrap XL systems is limited to the quality of Section Perimeter,in(mm) equivalent Yield Strength), the installation. in(mm) 38 in(10 mm) 148(3759) 2(51)x 2(51)x 18(3)in angle threaded rod *For personal protective equipment recommendations,please see SDS. Thermal Ceramics,FireMaster,and FastWrap are trademarks of Morgan Advanced Materials. FireMaster products are manufactured by Thermal Ceramics and are distributed by authorized distributors. 2) HVAC ducts: Trapeze support hangers shall be spaced on maximum 60 in. (1500 mm)centers. Hanger rods or straps shall be anchored with steel drop in or wedge expansion type masonry anchors. No additional www.morganthermalceramics.com 12:2014 Page 4of8 U Morgan l rAdvanced Materials FIR GR FireMas#er�-FastVllrap° XL Grease and HVAC Duct Enclosure System 1 or 2 Hour Shaft Alternative /Zero Clearance to Combustibles 0 0 0 p‘4 1111 0 **. Alts • �v 04.0 1 01) ) N. 001 27PG 0 g**1 tit 05°°InP 0 60 COCO 0 112"3a 0 :rixixixnr xl ICIMIXIICrrn'.w,ri Butt Joint/Butt Joint Typical 0 TWO LAYER INSTALLATION (Grease Duct per ASTM E2336 and CAN/ULC S144). 0 6"(155 © © 0 3"(]5) 3"754141 3"]5 I 112" 'i 0 112" :� 12'38) © 112'(36) WIZ FFFFFI FF•1111111111111111111 21"(533)TYP. © I, 21"(53.3)rip i Telescope Wrap Option Butt Joint Option Checkerboard Wrap Option SINGLE LAYER INSTAL!ATION OPTIONS(2-Hour rated HVAC Duct Per UL HNU V-19) LEGEND 1 Two Layers of XL Insulation for ASTM E2336 and CAN/ULC S144 Grease Duct Enclosures One Layer of XL Insulation for 2-Hour Air Ventilation Duct Enclosures 2 Steel banding minimum 1/2"(13)wide by 0.015"(0.4)thick. 3 Tight butt joints(no overlap)at perimeter and longitudinal joints,both layers for grease ducts 4 Min.3"(75)overlap on perimeter and between adjacent blankets 5 Optional 6"XL collar 6 Hangers-size dependent weight of assembly(see datasheet Section G) 7 Trapeze Supports-size dependent on weight of assembly(see datasheet Section G) 8 Steel Rectangular or Round Duct(size,gage and construction dependent per Listed Design) The integrity of Thermal Ceramics duct systems is limited to the quality of the installation. XL001-10 www.morganthermalceramics.com 12:2014 Page 5of8 P 1/ Morgan CAdvanced Materials - 'F Master° FastWrap® XL Ire FastWrap® � >�, 0 a ,_ Commercial Kitchen Grease Duct Enclosure System Air Ventilation Duct Enclosure System Through Penetration Firestop Systems • 0 0 IlliO mmom ,,,t„I U 111 at ill IN EN till Packing A-_ii 0 �I.1LOZlQi\1�1 O 111•117Y7DM/li�■ � m u ly 0 rinMil Packing XL Insulation continuous through rated wall assembly XL Insulation continuous through rated floor/ceiling assembly Packing Iv Oilb& 0 0 idiseill EMI goal) tttlt K goal) 1111 ood Tar illl ar ' I' Packing m. 0 0 O XL insulation terminated on both sides of the XL insulation terminated at the top and bottorr rated wall assembly surface of the floor/ceiling assembly Firestop Designs per ASTM E814/UL 1479-Consult UL/ULC Directories for System Details UL Listing F-&T-Rating (1)Floor/Wall (2)Penetrant (3)Enclosure Per (4)Termination (5)Firestop Sealant Details C-AJ-7012 2-hour Concrete/CMU 84x24;26 Ga Duct V19;FRD3;5;18 wrap through 1/2 in;STI;Tremco C-AJ-7014 3-hour Concrete/CMU 84x24;26 Ga Duct V2; wrap through 1/2 in;STI;Tremco C-AJ-7019 1 or 2-hour Concrete/CMU 84x24;26 Ga Duct V19;FRD3,5,18 terminate at 1/4 in;STI;Tremco C-AJ-7021 2-hour Concrete/CMU 49x24;16 Ga Duct G18;FRD4;7 terminate at 1/4 in;STI;Tremco C-AJ-7095 2-hour Concrete/CMU 39x39;22 Ga Duct V19;FRD3,5,18 wrap through 1/4 in;STI Hilti;Rectorseal;Tremco C-AJ-7098 2-hour Concrete/CMU 49x24;16 Ga Duct G18;FRD4;7 wrap through 1/4 in;STI;Hilti;Rectorseal;Tremco F-C-7036 1 or 2-hour Wood/Gyp Floor 24x12;16 Ga Duct G18;FRD4;7 wrap through 1/4 in;STI;Hilti;Rectorseal;Tremco F-C-7055 1-hour Wood/Gyp Floor 4 Dia;30 Ga Duct V29;FRD28 wrap through 1/4 in;STI W-J-7086 2-hour Concrete/CMU Wall 100x100;26 Ga Duct V19;FRD3;5;18 terminate at 1/4 in;STI W-L-7121 1 or 2-hour Gyp Wall 30x30;16 Ga Duct G18;FRD4;7 wrap through 1/4 in;STI;Hilti;Rectorseal;Tremco W-L-7145 1 or 2-hour Gyp Wall 100x100;26 Ga Duct V19;FRD3;5;18 terminate at 5/8 in;STI The integrity of Thermal Ceramics duct systems is limited to the hearty of the installation. XL003-5 www.morganthermalceramics.com 12:2014 Page 6 of$ U Morgan cAdvanced Materials FIR yT1R FireMaster® FastWrap® XLCt O CO 11,1 4111 „„ CI 4 '11111151110 ASTM E 2336 Compliant Enclosure and Door System FastDoor XL1 Access Doors Sizes Available Opening Sizes Ordering Code FIGURE 3 10”x 4"Door Opening *434-6970-033-99X1 10"x 6"Door Opening 434-6970-034-99X1 1 UL listed FastDoor XL access panel 12"x 8"Door Opening 434-6970-035-99X1 2 All Thread Rods and wing nuts 12"x 12"Door Opening 434-6970-036-99X1 3 Retainer Clips with threaded nut and wing bolts 16"x 12"Door Opening 434-6970-037-99X1 4 Insulation layers as required by UL or ITS Listings 20"x 20"Door Opening 434-6970-038-99X1 5 FastDoor XL;1-1/2 inch thick single layer insulation *Special Order;Curved and SS Available www.morganthermalceramics.com• ' 12:2014 Page 7of8 r 14 Morgan CAdvanced Materials F/R ER . . .. (ja FireMaster ,FastWrap ' L . .. 1:1) Commercial Kitchen Grease Duct Enclosure System Air Ventilation Duct Enclosure System 1 Or 2 Or 3 Hour Shaft Alternative /Zero Clearance to Combustibles 2 and 3 Sided Wrap Detail for Attaching to Walls and/or Ceilings g" 0 3" 03" •G I Q Q e \,\\ ' N. l o \ o _ 0 o 0 0 Note: Ducts must be independently supported per code LEGEND 1 Rated Concrete floor/ceiling,or wall-with rating equal or greater than enclosure rating 2 Two layers of XL Insulation for Grease Duct Enclosures(install per UL G18)) One layer of XL Insulation for Air Ventilation Duct Enclosures(install per UL V19) Two layers of XL Insulation for 3-hr Air Ventilation Duct Enclosure(install per UL V2) 3 Concrete fastener system 4 3/16"(5)thick x 2"(50)-3"(75)wide bar stock perforated 12"(305)o.c. 5 8"(203)maximum Air Gap 6 Duct 7 Steel banding min. 1/2"(13)wide by 0.015"(0.4)thick. 8 Banding clip The integrity of Morgan Thermal Ceramics duct systems is limited to the quality of the installation. XL005-4 www.morganthermalceramics.com 12:2014 Page 8 of 8 Consulting Structural Engineers Structural Calculations for 7000 Varns HVAC Job Number: 170711 Codes: 2012 IBC Amended by Oregon Structural Specialty Code with 2014 revisions. Date: 7-19-17 ¢UcruR Location: 7000 SW Varns St.,Tigard,OR PROF < Client: Salem Heating&Sheet Metal Ci N " PO Box 12005 $.13 02 Salem, OR 97302 Aro Phone: 503-581-1536 OR ON Engineer: Cameron Swearengin P.E., S.E. 9 MSC Engineers, Inc. � �' 3470 Pipebend Place NE, Suite 120 I EXPIRES: 6 • ,,_e tv Salem, OR 97301 Phone: 503-399-1399 Scope of Services: Anchorage design of proposed rooftop unit. Contents: Load Calculations 1.1 — 1.2 Anchorage Design 2.1 —2.2 Sketches SK.1 LIMITATIONS:Engineer was retained in a limited capacity for this project. Design is based upon the information provided by the client,who is solely responsible for accuracy of same. No responsibility and/or liability is assumed by,or is to be assigned to the Engineer for items beyond those shown on these sheets. ti A De.-S/GN Lis rT VE /AREAARE v" 2,0 Gv NT- = 151.1 2- D= 27 eto some-0) 1+ c rz 6 t6 693 14 /4 zag Lz'7 ! I' Zv M Pf� �X r'vs�,,t-r C l` f-1T = f2` (ptzc,P1249 g`( C4AtJi- cam, Zs""t ! jC !<a. V x 1 C . = o. 5 Kat 0. f 3 w P-51:-. A+ Psi' 44- 56- 44- 3f /SM IC �p a '1av Sast,� 1� ( Z.(%)) ?, i›,3 0 Ise o O 3 spy LP' /,O (Corm-* f4vu0-) U Q 13 tip ir-Rkso 0,3G/ tJ11)L1/10 M V, 253Gup fPv-tf iz p.2't7w? (Vert ` 1 I I Gviv FILE O. / C (] r SHEET NO. I ( q MIADENBY.T_ 1 S DATE 7-/ I t 7 El -"mss y CLIENT S A t�i-A4 �}� n (�fib �IIIVEERS i1V _ PROJECT 7 co(JO vP -NS i-hiP Design Maps Summary Report11 Page 1 of 1 RE LEGSmum Usemum Maps Summary Report Building Code Reference Document 2012/2015 International (which utilizes USGS hazard data availableBuilding inCode 2008) Site Coordinates 45.4223°N, 122.74527°W Site Soil Classification Site Class D —"Stiff Saii" Risk Category I/II/III &, ,1,1:' r'", ;t ^r '-?, r7y?. £ " 4� G§ ,}-1; & 1;:'1,';',.L.,.. 7, € 1. 4 g, Oak * a• q5 /+ *' § c r� : ✓ t�£;, ,; ISL:., �i 1'" !" ; EY c"* ; > cr k . m , �. $.. - tft ei°e x:} Y „B , t4 g t �.,t ass k f£'4sp a�'� : C r ° Y ; • 41 ti. � 4 � � ��'�� .kit � v �a- � 1� e J ,Y I: � .•,,-- �`" 3�3.�5"i ° s' ',�?. '�` ' T""Kf 1 .5.: z ';* ..>'*R4"a in` r;" ' r € r41- .;• lS ." � � '..1...".,-.-4,-,s';-.,-:-...„1-` � r � -'',..0.--,- � . -� � i t x s � F '~" y.'�? €�a i -` � E } 1 = � � Et,- z„ P z'�� x� �; ' ':} k F is !' E d' A v =-> " „,i-J- E€ .max. .,. L �. ,. .A. r USGS-Provided Output SS = 0.975 g SMS = 1.083 g S°S = 0.722 g S, = 0.422 g SM,. = 0.666 g Sol = 0.444 g For information on how the SS and Si values above have been calculated from probabilistic(risk targeted) and deterministic ground motions in the direction of maximum horizontal response, please returnto the application and select the"2009 NEHRP"building code reference document. I.4CEM Response Spectrum Design Response Spectrum sea as uta 7 L99 an as set a az 'a a a+a a odd vi 1 0,44 5S2 ❑.S3 a23 a.22 SIGalt QLa sap a00 ao7 023 a w a00 as) •1.R] 1.30 ""— ,,4 !€d 1 H0 2017 (103Q70 eta adz) 0�0 1.13 123 t t0 1.40 1 8U L00 Period T(sec) Period T(sec) Although this information is a product of the U.S.Geological Survey,we provide no warranty,expressed or implied,as to the accuracy of the data contained therein.This tool is not a substitute for technical subject matter knowledge. /17-- --AV-A-4-I crt- 1 tt OCC)L 103 road NEMEMEMBECEM a..) inano 111(N1 LH" 1-‘213 —AS RONAN 'ON1331-IS L —'ON 3114 0.2kVD 0-1(V/ cr1-7-.0"k,Sol7it (c) //. 9 J/rW? 0-4 crsel.IV- V /r-v) at s GI 11-, (I) s() 1) 07 zi so - 4- / • cJ CV7 LS 7 ci 1q-, z frr7A dr-7-% .0/ -..- (t) 90/.7 7 inn-Ilk/A 57r,.1,7a S ai (g-ver, (NJ() VC271. 1,-JetS c-,00 cp-1-2 -c, "Jo r// Tina-0*v s (t) o<7 vt,g d (.) 3 Kiri gC--1/ (iLrJt1) 3--7.1C111-7N-V LG - got /-7 (Yez)(9`02-1/ zh‘c; 25 14 LLI 101 21-,S) 7/143i/S 3-7044 rve,-) 47;C3 2 -a. (11/1 )(%:) j, car-i ry) (Jif\1()) ! vi:4 r-4 0-1 ittc .LrktoD ev 9 IS'5 CS, 3 9-Vii4:241-7 ri•V J t4o r7-,-f2-C,rz ": (cJ t) ?�/ W ND s j`Gr Pat �-- z z Ycf,c, F_.c�ni17zocs gISMtL = t). 54-12. Gv (Z-c;,"3-2.--0" ) o p 2 c3 v yr M A. (5-41 670 0.6 (0.I/2) 3 £s t 2 n 2c.A.,)r'. 3biz. 't td ,`S v M CL / s c fir. -e4 rte I3 (i c ) (I ) r 3zH 3'/sc- v V g e)(34 :v l cz) .c 4.4.s riz-y (4) T-ia%u n = 73' t� :=.-? Cl) 'Lc, .r: r ,f 1 0 65 <t, of Arc2 0-a) 32-3,(Li) US L- 6-1) ' l ca x " 5 elz � A. S tt C c, 4,,,44 I'r l t- �rFILE NO. + © /t SHEET NO. Z!�' MADE BY �--S 411 fkr(z DATE 7-17-f 7 • C CLIENT J���� rpt^' NGINEE=RS IN.FC PROJECT l OZ.'- V+417.M1. S I'lifl < k0 P0a La d UNrf - (3) A0/o Sr..11&* • 0} Al GAS Akg05,413 k ria 6 n 140 k GL# Cevr-itl3ci r4 5.7,E b1= cru,r- '`• L3Nt r- (4i)(q) 0/0 x3" Ga,ac sp s {, 51De. ZX 5v8 F)z ' iiM4 t,. (NE4.uait r FILE NO. I f SHEET NO. S K1 1 C MADE BY as, /}i ,sem t -�,,../5-17 ip '1 7 CLIENT 54i-6-fit 1 tekr`liiG DATE 1�I LGIhJPPrc �7i.a,� ,Ar- tl.n .