Correspondence (3) A
MST r,2o17-00aJ 3
PWU ENGINEERING INC l'.33 Sic" f 1VGZ
Ph: (503) 810-8309
Email: pwuengineering@comcast.net
Field Memo Only:
Job#: MC17142
Date: 9/7/17
Client: Mark Stewart Design
Project: Lot 14 Greensward, Tigard, OR
Attention:
Mr. Gary Henin, H&H Homes;
Gary as per our discussion on the phone today. The highest floor diaphragm
shear is below 200plf therefore per the diaphragm shear tables in the code the
interior edges of the floor diaphragm do not need to be blocked.
Sincerely,
r DR0,
r
d,<7Gfi,. c
Expire . 0E 3C 2018
i i