Loading...
Permit (27) CITY OF TIGARD BUILDING PERMIT 1114 COMMUNITY DEVELOPMENT Permit#: BUP2017 00240 Date Issued: 09/12/2017 �((1 A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112AC00600 Jurisdiction: Tigard Site address: 7440 SW BONITA RD Project: Portland Compressor Subdivision: None Lot: None Project Description: TI for existing tenant:Adding(2)overhead doors and replacing(1)door at east wall. Contractor: BENTING CONSTRUCTION Owner: RL WILSON PROPERTIES LLC 18475 SW ALTON ST. 9204 NW MCKENNA DR BEAVERTON, OR 97006 PORTLAND, OR 97229 PHONE: 503-642-5682 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 09/12/2017 $729.45 Class of Work: ALT Type of Const: IIB Demolition Occupancy Grp: S-1 Occupancy Load: 52 12%State Surcharge-Building 09/12/2017 $87.53 Dwelling Units: 0 Plan Review 08/29/2017 $474.14 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 09/12/2017 $91.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 09/12/2017 $291.78 Value: $50,000 Info Process/Archiving-Lg$2.00(over 09/12/2017 $8.00 11x17) Info Process/Archiving-Sm$0.50(up to 09/12/2017 $10.00 Floor Areas: 11x17) Total Area: 50126 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,691.90 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. iii Application Permit A lication 1 Commercial FOR OFFICE USE ONLY City of Tigard Received �'A�/(7 / /j/47,029/7 /(3 g Date/By: Permit No.: fi 13125 SW Hall Blvd.,Tigard,OR 9722 Plan Rev `-7 ■ Phone: 503.718.2439 Fax: 503.598.1 6 ED DateBy:7C� t �11 t. I ( Other Permit: TI G A K D Inspection Line: 503.639.4175 AUG G 9 :1 n 17 Date Ready y: �/ /� Juris: I ® See Page 2 for Internet: www.tigard-or.gov H I 2 !U Notified/Me_thod: Z,(] G±�� /� Supplemental Information -'` `' A ' dye/.. OCT., TYPE OF Ili" m �1t� � I I REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ 0 Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:7440 SW Bonita road New dwelling area: square feet City/State/ZIP:Tigard,OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Portland Compressor Covered porch area: square feet Cross street/directions to job site:SW 74th Ave. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: J Lot no.:600,,107/$/0 Permit fees*are based on the value of the work performed. Tax map/parcel no.:2S112AC Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Interior remodel of an existing building.Adding two new overhead doors and Valuation: $50,000.00 replace one man door at the East wall. Existing building area: 50126 square feet New building area: 0 square feet ►I PROPERTY OWNER 0 TENANT Number of stories: 1 Name:Portland Compressor Type of construction: II-B Address:7440 SW Bonita road Occupancy groups: City/State/ZIP:Tigard,OR 97224 Existing: S-1/B&F Phone:(800)542-8300 Fax:( ) New: NO CHANGE CI APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:CIDA {Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Dustin Johnson �d FLS plan review fee(if applicable): Address:15895 SW 72 Ave,Suite 200 Total fees due upon application: City/State/ZIP:Portland,OR 97224 Phone:(503)226-1285 Fax: :( ) Amount received: E-mail:dustinj@cidainc.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:Benting Construction,Inc. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:18475 SW Alton St Solar Installation Specialty Code checklist. City/State/ZIP:Beaverton,OR 97006 Permit fee(includes plan review $180.00 9 and administrative fees): Phone:(503)642-5682 ax: ( ) State surcharge(12%of permit fee): $21.60 CCB lic.:31619 Total fee due upon application: $201.60 Authorized signature: -'14f(' '// ' This permit application expires if a permit is not obtained AI d" within 180 days after it has been accepted as complete. ` * Fee methodologyset byTri-Count BuildingIndustry name:Dustin Johnson Date:8/21/17 Y Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) 11,1 Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ _. (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 City of Tigard III " COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: iS P p2-0/? (1 Site Address: -12i�/U `4j A�3r?i"-a 'ct Suite/Bldg#: Project Name: /604j / c ,iprc 0-7---- (Name(Name of commercial business occupyin the space. If vacant,enter Spec Space.) Planning Review / /� Propo .1: 77/ �X./ j ` D 1'4)4) O ver-A �U(_ r pt (--Px1 n tr4 , •rify site address/suite# exists and active in permit syst • i er Terrace Neighborhood: ❑ Yes tYJ No le r and Use ase#: Me) a0H QQO Plans atch Approved Land Use: Site Plan � ndscape Plan ther: 10 B \ rban Forestry Plan ' evation Plan 2--is— . uilding Height: Maximum Height Actual Height e/`k// td •nditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance J 1►, Business Licen : Exists: Yes ❑ No,applicant notified to obtain business license ' blic Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was notified No q pp Applied For: CI CINo,stop intake Notes: Approved by Planning: G-- -�� Date: e Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 71,Z /7� Site Plans: # _ ` ' Building Plans: # 3 Building Permit#: nter building permit#above. Workflow Routing: Planning 'ngineering [?Permit Coordinator 3uilding Workflow Sign-off: ign-off for Planning(include notes from planning review) Route Application Documents: uilding: original permit application, site plans,building plans,engineer and C beam calculations and trust details,if applicable,etc. Notes: . / �� By Permit Technician: IF A , /7,-.A7 Date: ,70 I:\Building\Fonns\BldgPermitRvw_COM_WithLandUse_060116.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) Water Quality/Quantity Facility: 1 Assess Water Quality Fee in-lieu: CI Yes ,�J No Assess Water Quantity Fee in-lieu: CI Yes /)21' No LIDA Facility on lot: ❑ Yes izr No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: kit L - LA. 9, Date: 9 /5//d."7,Revisions (after Building Submittal only) Reviewer Da :' Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ,.. DC Fees Entered: Wash Co Trans Dev Tax: GI Yes N/A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes N/A rOK to Issue Permit Approved by Permit Coordinator: Date: W } I:\Building\Forms\BldgPermitRvw COM WithLandUse 070915.docx FOR OFFICE USE ONLY— SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 Transmittal Letter l{:GA R 1) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-gr.gov TO: Dan Nelson DAT t t , DEPT: BUILDING DIVISION R, J r....l: 2€ FROM: Dustin Johnson CITY Of `IA / DING DIVISION COMPANY: CIDA Inc. PHONE: 503.226.1285 BY:e RE: 7440 SW Bonita Rd. Tigard, OR 97224 SOF 2O - 6024 (Site Address) (Permit Number) Portland Compressor (Project name or subdivision name and lot number) t ATTACHED ARE THE FOLLO *NG IT \A "7 Copies: Description: / Copies: Description: Additional set(s) of plans. 3 Revisions: A1.1, A1.2, A1.3•CS1 Cross section(s) and details. ' ' Wall bracing and/or lateral analysis. Floor/roof framing. � Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: The drawings are to have have a new 90 square foot storefront on the East side of the building. Site ynprovements will be made to the existing sidewalk to include a 1 :20 sidewalk leading up toe door from the existing parking lot. FOR OFFICE USE ONLY Routed to Permit Techni ian: Date: _ Initials: Fees Due: ❑ Yes f No Fee Description: Amount u : V x Special Instructions: Reprint Permit (per PE): ❑ Yes ['No ❑ Done Applicant Notified: Date: '3/,Ii Initials: e J:oekce w/ I41ty!4.74,s I:\Building\Forms\TransmittalLetter-Revisions.doc 05/25/2012 City of Tigard ■ COMMUNITY DEVELOPMENT DEPARTMENT 11111 ■ ,_,G A f. Building Permit Review -- Commercial - With Land Use Building Permit #: Jai/,O/? (J [ 0410 Site Address: ' 2-#10 ....VC) Ann la Pce__ Suite/Bldg#: Project Name: AOr J 0767,0rf',M'd "- (Name of commercial business occupyin he space. If vacant,enter Spec Space.) Planning Review Propo: .1: 7"I. ,� �`z7 j � �j� � ��i �J liCrM [ X/f f cx- c r. :Cn Yt L flo o 4 f C ACi'le e 'to S i c �q4.)41. ►' :,:fy site address/suite#exists and active in permit syist S(Of t.er Terrace Neighborhood: 0 Yes No r� d Use ase#: AVM aop---- DOO-5 1 Plans tch Approved Land Use:_ „,)i‘..„Site Plan ll2 ndscape Plan 4I er: \Ikban Forestry Plan '� evation Plan __....,,,���� , Building HeightIC) t Maximum Height �c-- Actual Height .155/l •nditions Met; ❑ Prior to Submittal ❑ Prior to Permit Issuance I►, Business Licen ��Exxists: Yes 0 No,applicant notified to obtain business license � 4 blic Facilities Improvement(PFT)Permit II Required: 0 Yes,applicant was notified f No Applied Fon 0 Yes 0 No,stopintake e Notes: Approved by Planning: ”" �.-� - c.-....„...„....-44, Date: A Revisions(after Build Submittal only) Date Revision 1: Approved 0 Not Approved _, ,_ ../ 73 17 Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 7/,,214> Site Plans: ## Building Plans: ## Building Permit#: ortriter building permit#above. Workflow Routing. pz.Planning ngineering ? Permit Coordinator wilding Workflow Sign-off: jZ ign-off for Planning(include notes from planning review) Route Application Documents: '?::Building: original permit application,site plans,building plans,engineer and C beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Arirt - -� Date: 49,2.57/1 I:1Building\Forms\BidgFermitRvw__COM WithLandUse 060116.docx Engineering Review O Slope at building pad: ---.15____. -.17: I O PH Permit#: 'IS...„. O Conditions"Met"prior to issuance of building permit O Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) .1.r" Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: 0 Yes 71 No Assess Water Quantity Fee in-lieu: 0 Yes pr No LIDA Facility on lot: 0 Yes 21 No 0 NOT Approved by Engineering: Date .- Notes: Approved by Engineering: kitjta..- L-9. Date: 9 /5/1 1: Revisions (after Building Submittal only) Re?rt Da e ..• Revision 1: 7 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved 1 Revision 3: 0 Approved 0 Not Approved Permit Coordinator Review I 0 Conditions"Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: Revisions(after Building Submittal only) \• Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: O. / D C Fecs Entered: Wash Co Trans Dev Tax: 0 Yes II N/A Tigard Trans SDC: 0 Yes II N/A Parks SDC: 0 Yes 'I N/Ains/z.....-----3 j{-7 71" 2 to Issue Permit i - Approved by Permit Coordinator Date: I:\Building\Fonds\BIdgPennitRvw_ODNI_With LandUse 07091 5.docx ______-. ximm=iMM1====MMINIMMMMMMEMEMEMMEMMEIMMIll