Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (37)
BUILDING PERMIT CITY OF TIGARD ilii Permit#: BUP2017-00257 COMMUNITY DEVELOPMENT Date Issued: 09/21/2017 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel 2S113AC00103 Jurisdiction: Tigard Site address: 7204 SW DURHAM RD 800 None Lot: None Project: Millenium Building Services Subdivision: Project Description: TI for existing tenant: exterior work for overhead door and minor change to landscape and hardscape. PACIFIC REALITY ASSOCIATES LP Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PIVEN 15350 SW SEQUOIA PKWY#300 1 ATTN:5350 NSE SEQUOIA PKWY#300 PORTLAND, OR 97224 PORTLAND, OR 97224 PHONE: PHONE: 503-624-6300 FAX: 503-624-7755 FEES Specifics: Description Date Amount Type of Use: COM DC Provision Review,COM TI-Ping 09/21/2017 $91.00 Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 09/21/2017 $509.05 Occupancy Grp: B Occupancy Load: 62 Demolition Dwelling Units: 0 12%State Surcharge-Building 09/21/2017 $61.09 Height: 0 ft Plan Review 09/21/2017 $330.88 Stories: 1 g $203.62 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 09/21/2017 Value: $30,000 Info Process/Archiving-Lg$2.00(over 09/21/2017 $4.00 11x17) Info Process/Archiving-Sm$0.50(up to 09/21/2017 $0.50 Floor Areas: 11x17) Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,200.14 Required Items and Reports(Conditions) Required: Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days.952-0011 0110 t I ough OAR 952-001-0090.eYou may obtainoa copy of the rules s you to follw the rules ocalling pted by the Oregon Utility Notification Center. Those rules are set forth in OAR or direct questions to OUNC by call ng 503.232.1987 or 1.800.332.2344. Issued By: "C:(2:35: 112"' ''.7"..... Permittee Signature: t e1 € v.0 iA A' 67 1 Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application.:)ECEIV.EJ) Co mercial FOR OFFICE USE ONLY n/�,,+r�� SEP 2 1 1 Received Z i (9f42s-I City of Tigard ?U Date/B Permit No III . . 13125 SW Hall Blvd.,Tigard,OR 97223_ Plan Review Other Permit: Phone: 503.718.2439 Fax: 503 598(9 01 tr (: a (s k Date/B : ^ —_ ' Date Ready/By: Juris: E1 See Page 2 for Inspection Line: 503.639.4175 �A ,; fr T�;.,„.. •,�,.f Supplemental Information Ti G A RD p B �« � i i'� Q Notified/Method: Internet: www.tigazd-ocgov , l_t m_). It,` i : r, 1 p @ 1) A tI'1 "�� " k �� ' 4-� � �YP-,Ik.' OF.WO'�IC ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the y , ,, work indicated on this application. , t- I' ,- ,L-'"'" 1` "� 1R Q '4 e + u 5r , '{' ' _� � Valuation: ❑ 1-and 2-family dwelling ®Commercial/industrial Number of bedrooms: ❑Accessory building 0 Multi-family Number of bathrooms: ❑Master builder ❑Other _ Total number of floors: -1,1,1' New dwelling area: square feet Job site address:7204 SW Durham Rd.#800 City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet area: square feet Suite/bldg./apt.no.:800 I Project name:Millenium Building Servic Covered porch Cross street/directions to job site:SW Durham and SW 72°d Ave. Deck area: square feet Other structure area: square feet a9 E " C "mac°�? Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the iESG `TiO1+I , W BE work indicated on this application. Valuation: $30,000 Overhead door,minor change to landscape and hardscape Existing building area: 7,718 square feet New building area: 7,718 square feet '..- :44''''''''''''''.L:".76 O 1*� }� .'...4.,','¢ i s f T�A ';',4;N:02,,,,,,47„::,,,mNumber of stories: One Name:PacTrust Type of construction: III-B Address:15350 SW Sequoia Parkway#300 Occupancy groups: City/State/ZIP:Portland,OR 97224 Existing: B,S-2 Phone:(503)624-6300 Fax (503)624-7755 New: B,S-2 Business name:PacTrust Structural plan review fee(or deposit): Contact name:Leslie Louis FLS plan review fee(if applicable): Address:15350 SW Sequoia Parkway#300 Total fees due upon application: City/State/ZIP:97224 Amount received: Fax: :(503)624-7755 m . F� ' ,t Phone:(503)624-6300 inlig w :t O%? O E-mail: 31, lesliel@pactrust.com Commercial and residential prescriptive installation of ' ��, a c�-RA i'o - „ = 1 roof-top mounted Photovoltaic Solar PanelSystem. ' ss na r-: '" Submit two(2)sets of roof plan with connection details Business name:PacTrust and fire department access,along with the 2010 Oregon Address: 15350 SW Sequoia Parkway#300 Solar Installation Specialty Code checklist. Permit fee(includes plan review $180.00 City/State/ZIP:Portland,OR 97224 and administrative fees): Phone:(503)624-6300 I Fax:(503)624-7755 State surcharge(12%of permit fee): $21.60 CCB lic.:153913 Total fee due upon application: $201.60 This permit application expires if a permit is not obtained Authorized signature: tAl within 180 days after it has been accepted as complete. Date: 5fi,2Oi Z O� I * Fee methodology set by Tri-County Building Industry Print name: L,er!11 Pj (,,. J�'CJ �(� Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) City of Tigard • BUILDING DIVISION ■ Over-The-Counter (OTC) Building & Fire Protection System Permit 1 1 c n RI) Appointment Checklist Permit Record#: /A2e/7 — G9® 5-7 9/a//7 Contact Name: G Z-14— L06t/.5 Phone#: .S-03- . —4 306 Business Name: PC.. 772-aS Appt. Date/Time: --X.....4,-11,,,, _ O,, i i Site Address: 7,20 sot) ,6-u///,,iy /24 Bldg/Suite • "`Q a Project Name: /f/i.G /a/y 6Ct/L,6#,/c---S Gzs- New Tenant? 0 Yes lEr No Project Description: c 7-E-gi 02. 400/2.1e— Existing Use: g -Ce' New Use: ' MMD Required: l5F Yes 0 No Related Record#:/I/y/,,„2.O/7 —Dep..? 5` APPLICATION SPECIFIC INFORMATION GENERAL INFORMATION Class of Work: ry— Occupancy Group: Q Type of Construction: l L)— Type of Use: I Occupancy Load: 6 Oregon Specialty Code: ®j SPECIFICS Number of Stories: ' Building Height: Mixed Use: Number of Dw Units: Number of Bathrooms: Number of Bedrooms: BUILDING SQ FT-SCHOOL CET OTHER SQUARE FOOTAGES Story Square Footage: Accessory Structure: Covered Porch: Basement: Garage: Deck: Total Square Footage: Carport: Mezzanine: SETBACKS Sideyard Setback—Left Sideyard Setback—Front Sideyard Setback-Right Sideyard Setback—Back CONSTRUCTION Exterior Walls: Openings Protected: Firewall Separation: N: S: N: S: Occupancy Separation: E: W: E: W: Access.Parking Spaces: REQUIRED ITEMS Fire Sprinklers: V e .S Fire Alarms: Smoke Detectors: Sprinkler Type: Alarm Type: Protected Corridors: Standpipe Required: Pull Stations Required: Parapet: Hazard Group: Battery Calcs Provided: Density: Cut Sheets Provided: Design Area: K Factor: Total Project Valuation: $ 3 0/ 0 0 0. 0-0 I _' FEES DUE $ q 1 -.- DC Prov Rvw,COM TI—Ping $S o 9 ,o S Permit Fee—Add,Alt,Demo DC Provision Review Fee for COM TI(effective 7/1/2017) $ 61 , Q 12%State Surcharge Project Valuation $ 3 3© •2 Plan Review,Structural Up to$4,999 $0.00 $ a O 3 . . Plan Review,Fire Life Safety $5,000-$74,999 $91.00 $ y-.---"" Info Proc/Arch,Lg(over 11x17$2.00) $75,000-$149,999 $226.00 $ .60 Info Proc/Arch,Sm(up to 11x17$0.50) $150,000 and over $361.00 $ Metro Construction Excise Tax $ School Construction Excise Tax $ Hourly Rate Fee $ Hourly Rate State Surcharge $ Misc.Admin Fee $ Other: Building Staff: $ Other: Date/Time: $.4-&0•07-7-a---TOTAL FEES DUE I:\Building\Forms\OTC_BUP_FPS_070117.docx City of Tigard lig " COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: g // j/7 _ 49 X5-7 Site Address: `7201-1 Sig Durham 124 , Suite/Bldg#: e00 Project Name: glikV11UYY1 NAm ,SAO, (Name of commercial business becupying the space. If vacant,enter Spec Space.) Planning Review Proposal: mer niait boy. q,v tt tAndtsetif cylotnor Ix Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes . No XC Land Use Case#: VAMD 2011''Qp035- 14C Plans Match Approved Land Use: V Site Plan 1Xt Landscape Plan ❑ Other: ❑ Urban Forestry Plan ❑ Elevation Plan NBuilding Height: Maximum Height Actual Height 1JConditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance `,Business License: Exists: ❑ Yes ❑ No,applicant notified to obtain business license ,kt Public Facilities Improvement(PFI)Permit: Required: ❑ Yes,applicant was notified , 14 No Applied For: ❑ Yes ❑ No,stop intake Notes: FiteX4 1 )1alnlhIng tviwectiiii I)Irrd big 1 V Approved by Planning: Pektd1/1- Date: h Revisions (after Building Submittal onl Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ?/',//7 Site Plans: # 3 Building Plans: # 2 Building Permit#: Inter building p__!.... it#above. Workflow Routing: la-Planning gineering ❑ Permit Coordinator [fding Workflow Sign-off: [Sign-off for Planning(include notes from planning review) Route Application Documents: [wilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: .,-QC. Date: r/2/7/2 I:\Building\Forms\BldgPennitRvw_COM_W ithLandUse_060116.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions "Met"prior to issuance of building permit ❑ Easements (encroachments) per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes El N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BldgPermitRvw COM WithLandUse 070915.docx