Loading...
Permit (11) CITY OF TIGARD BUILDING PERMIT IN `' Permit#: BUP2017-00230 COMMUNITY DEVELOPMENT ' ` Date Issued: 09/21/2017 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439Figli i Parcel: 2S102AD03051 Jurisdiction: Tigard Site address: 12760 SW ASH AVE Project: Studio 7 Subdivision: BURNHAM TRACT Lot: 5 Project Description: TI for new hair salon. 11/29/17:REPRINTED to show change from spec space landlord permit to Studio 7 tenant improvement permit. Contractor: BNK CONSTRUCTION INC Owner: PREMIUM PROPERTY-TIGARD LLC 45 82ND DR, SUITE 53B BY CAPSTONE PARTNERS LLC GLADSTONE, OR 97027 1015 NW 11TH AVE STE 243 PORTLAND, OR 97209 PHONE: 503-557-0866 503-226-1972 FAX: 503-557-1085 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 09/21/2017 $377.90 Class of Work: ALT Type of Const: VB Demolition Occupancy Grp: B Occupancy Load: 8 12%State Surcharge-Building 09/21/2017 $45.35 Dwelling Units: 0 Plan Review 08/15/2017 $245.64 Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 09/21/2017 $6.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $20,000 DC Provision Review,COM TI-Ping 09/21/2017 $91.00 Misc Administration Fee 11/29/2017 $45.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $810.89 Required Items and Reports(Conditions) Required: Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. • . ZZZI(' , Issued By: -- ••- i•nature: 4` )% t �c. Call 50 .639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. CITY OF TIGARD BUILDING PERMIT Fri 2.. . COMMUNITY DEVELOPMENT Permit#: BUP2017-00230 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 09/21/2017 T[ '' �` ' 9 Parcel: 2S102AD03051 Jurisdiction: Tigard Site address: 12760 SW ASH AVE Project: Spec space Subdivision: BURNHAM TRACT Lot: 5 Project Description: Landlord TI(850)Sq.Ft.to prepare space for future hair salon. Contractor: BNK CONSTRUCTION INC Owner: PREMIUM PROPERTY-TIGARD LLC 45 82ND DR, SUITE 53B BY CAPSTONE PARTNERS LLC GLADSTONE, OR 97027 1015 NW 11TH AVE STE 243 PORTLAND, OR 97209 PHONE: 503-557-0866 PHONE: 503-226-1972 FAX: 503-557-1085 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 09/21/2017 $377.90 Demolition Occupancy Grp: B Occupancy Load: 8 12%State Surcharge-Building 09/21/2017 $45.35 Dwelling Units: 0 Plan Review 08/15/2017 $245.64 Stories: 0 Height: 0 ft Info Process/Archiving-Lg$2.00(over 09/21/2017 $6.00 Bedrooms: 0 Bathrooms: 0 11x17) Value: $20,000 DC Provision Review,COM TI-Ping 09/21/2017 $91.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $765.89 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: No Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332,2344. Issued By: ' Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection e. --:-e>/---'ss"'-' This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application CommercialRye 7 t ,- torr 01 U R L•: L SE ON ll City of Tigard Received g 4 Date/By: 7 Permit No.: 13125 SW Hall Blvd.,Tigard,OR 97223 AUG 1 ,3 2.017 S 1',�l At op'(, ice C Plan Revr••� Phone: 503.718,2439 Fax: 503.598.1960 Date/By: �i `I 8 FO 1 Other Permit: 1 I C;n Ii n Inspection Line: 503.639.4175 ` r Date Ready:�•. June. I ®J See Page 2 for Internet: www.tigard-or.gov au ,� p .,..., ,...,:'1 // 1 Notified/Method: f / Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:12760 SW Ash Avenue New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 S n„� a Garage/carport area: square feet A Suite/bldg./apt.no.: Project name: tkwelll Of Main TI- Covered porch area: square feet Cross street/directions to job site:SW Ash Ave and SW Burham St. Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Tenant improvement for 850 sf commercial retail space Valuation: $20,000 Permit application for warm-shell preparation,FFE and fixtures to be by Tenant Existing building area: 850 square feet Proposed use is a new hair salon New building area: square feet 0 PROPERTY OWNER 0 TENANT Number of stories: 1 Name:Premium Property Tigard-LLC Type of construction: 5-A Address:1015 NW 11th Ave. Occupancy groups: City/State/ZIP:Portland,OR 97209 Existing: n/a Phone:(503)226- 972 Fax:(503)2264973 New: B APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business nam :SERA Architecture and Design (Pleaserele+tofeeschedule) Structural plan review fee(or deposit): Contact name:Ross Determan FLSplan review fee(if applicable): Address:338 NW 5th Ave. pp ) City/State/ZIP:Portland,OR 97209 Total fees due upon application: Phone:(503)445-7372 Fax::( ) Amount received: ol.Z./c.(0 E-mail:rossd@seradesign.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name: 6/1/ el; Submit two(')sets of roof plan with connec'. •e ails �r � ��� ��7 and fire dep. , ent access,along wi e 2010 Oregon Address: `•/5 z AA_ J-7-6--- 572/- Solar Installatio 1ecialty C.• c ecklist. City/State/ZIP: �'.i� �J S'7rC '4��_ �� Permit fee(i I •• plan review �� 7 .i• .�t"'s•'strative fees): $180.00 Phone:O 7.•_ Fax:( ) Stat- I rcharge(12%of.`•,i it fee): $21.60 CCB lie.: Total fee due upon applicati.,• $201.60 Authorized signature: / Ow- This permit application expires if a perm .'s not obtained within 180 days after it has been accepted as complete. Print name: Date: * Fee methodology set by Tri-County Building Industry Service Board. 1:1Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) —52e , Z-S City of Tigard " COMMUNITY DEVELOPMENT DEPARTMENT IIII ■ TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: iS (e/40/7- Z2 315 Site Address: 121(4C SOI SI/1 ,' -, Suite/Bldg#: Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: \ fLr pe(Strc ,SJC1. ( my. voc't' Existing Business Activity: N 3/1\1-&-- Proposed /1\itProposed Business Activity: RI'S-}i1G.Lk SVG Verify site address/suite#exists and active in permit system. .River Terrace Neighborhood: ❑ Yes - 'No -(Zoning: t\! .C x Permitted Use: Yes ❑ No ❑ Spec Space .®=Confirm no land use required. 0 Business License: Exists: ❑ Yes V No,applicant notified to obtain business license Notes: 1 j' c CGvvv11 vv1'1 —Irl 0 t Cl i U S re-el VI 1-Ce:I Approved by Planning: 44.e.,t/C- Date: (j J 13) i 7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: h/rS7/7 Site Plans: # Building Plans: # 3' Building Permit#: Fig'Enter building permit#above. Workflow Routing: 0"-Planning Permit Coordinator Building Workflow Sign-off: ...Sign-off for Planning(include notes from planning review) Route Application Documents: f-Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: f.. 'j /' ,4r. Date: yi1.�/� I:\Building\Forms\BldgPernritRvwCOM NoLandUse 060116.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: C Fees Entered: Wash Co Trans Dev Tax: ❑ Yes /A Tigard Trans SDC: ❑ YesRT/A Parks SDC: ❑ Yes N/A K to Issue Permit Approved by Permit Coordinator: Date: r/1/2/q---- I:\Building\Fonns\BldgPermitRvw_COM Ly 1I:\Building\Fonns\BldgPermitRvw_COM NOLandUse 070915.docx IN ® Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 20,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ existing (b) An accessible entrance: $ existing (c) An accessible route to the altered area: $ existing (d) At least one accessible restroom for each sex or a single unisex restroom: $ existing (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Pemtits\BUP-COM PermitApp.doc 03/03/2011 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 12760 SW ASH AVE, TIGARD, OR, 97223 December 15, 2017 at 8:46:48 AM Record Type: Record ID: Commercial - Building BUP2017-00230 Inspection Type: Inspector: 299 Final inspection Chip Barnett Result: PASS - CofO Comments: Violation Summary: Inspector Contractor