PFI2017-00132 n CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12017-00132
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 08/03/2017
Parcel: SEG290
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Astound Broadband LLC
Project Description: Adjacent to 10350 SW Lincoln Street.Wave is proposing a plant extension from SW Oak Street and SW
90th Ave, north along the east side of SW 90th Ave,then cross west along the south side of Metzger
ES.This build will consist of(1)2"conduit with a 48ct FOC as well as 920 23 concrete vaults in city
ROW. SEG 290/250
Owner: FEES
Description Date Amount
PFI Permit Fee 08/01/2017 $700.00
PHONE:
Contractor:
WAVEDIVISION HOLDINGS LLC
401 KIRKLAND PARKPLACE
SUITE 500
KIRKLAND,WA 98033
PHONE: 425-576-8200
FAX:
Applicant:
JON ANDERSON
401 PARKPLACE CENTER SUITE 500
KIRKLAND,WA 98033
PHONE: 503-692-6031
Total $700.00
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By: -+' ^—\- —J7t1Gl/�
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12017-00132
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up-
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 09-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 10-TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 11 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 12-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 13-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 14-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 15-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 16-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector,<Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 17-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged
inspection, and after completing work covered by the permit. Call Jonny Gish 971-713-0281 orjonny@tigard-or.gov
PFI_Utilities 18-PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 19-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 20-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing,of any/all assignment changes.
PFI_Utilities 21 -OTHER Applied Notice
RECEIVED
City of Tigard JUL 2 6 2011
PUBLIC WORKS — ENGINEERING CITY OF TIGARD
Public Facility Improvement (PFI) "P&rffiftEERING
TYPE OF WORK
DESCRIPTION OF WORK(in the right-of-way) X❑ TYPE 1—Franchise Utility Work
Check one: X❑ Utilities ❑ Sidewalk/driveway approach ❑Street improvements performed by NWN, PGE
Detailed description:WAVE IS PROPOSING A PLANT EXTENTION FROM SW OAK ST AND SW 90TH AVE,
and/or utility agency.
NORTH ALONG THE EAST SIDE OF 90TH,THEN CROSS WEST ALONG THE SOUTH SIDE OF METZGER ES.THIS El TYPE 2—Sidewalk/Driveway/Sewer
Work performed for the purpose of:
BUILD WILL CONSIST OF(1)2-CONDUIT WITH A 48CT FOC AS WELL AS(2)2X3 CONCRETE VAULTS IN CITY RNV. • Sidewalk installation or repair.
• Driveway approach installation
Property address/location(s): 10350 SW LINCOLN ST,TIGARD,OR 97223(METZGER ES) and/or repair
JU7, • Sanitary sewer lateral installation
and/or main line tap
Applicant: ASTOUND BROADBAND LLC ❑ TYPE 3—Full scale Development
Work performed with Land use
Address: 401 Parkplace Center,Suite 500 approval which includes any of
City/State: KIRKLAND,WA Zip: 98033 the following:
Phone:503-692-6031 Email:JOANDERSONO-WAVEBROADBAND.COM • Subdivisions or Partitions
Contact name: JON ANDERSON Phone: 503-692-6031 • Street widening
• Mainline installation for Sanitary
Contractor: COASTCOM BY WAVE sewer, Storm sewer,Tigard water
and/or Tigard Water Service Area
CCB#: 211650 Expiration: 08/08/2018
Address: 401 KIRKLAND PARKPLACE SUITE 500 SUBMIT COMPLETED APPLICATION TO:
City/state: KIRKLAND,WA Zip: 98033 City of Tigard
Phone: 503-692-6031 Email: JOANDERSON@WAVEBROADBAND.COM Planning/Engineering
13125 SW Hall Blvd.
Contact name: GERALD ODEN Phone:503-341-6060 Tigard,OR 97223
Applications for"minor work in right-of-way"
Engineer: JON ANDERSON only may be emailed to:
rowpermitsatigard-or.gov
Address: 1372 QUINN RD
City/state:WOODBURN,OR Zip:97229 ff�, f
Phone: 503-692-6031 Email: JOANDERSONOWAVEBROADBAND.COM Case No.: 1 �-li 1 oO l
Contact name: JON ANDERSON Application submittal fee: $ 7�D•Od
Additional fees: $
Estimated value of work is required(if over$5,000):$10,000 Application accepted:
(within the public right-of-way) By:� Date:
Application reviewed:
Is work related to a LAND-USE DECISION? ❑ Yes 0No 731/6 7
��''
If so,please specify (MLP,SDR,SUB,etc.) case#: By: 511 Date:
Applicant notified:
Is work related to a BUILDING PERMIT? ❑ Yes O No By: ''\=Date:
If so,please specify(BUILDING PERMIT)case#: l:\ENG\PermitApplitations\pfi_appliation Rev.12/16/2016
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if
required by the city pursuant to TMC 15.041.140.
* With the exception of a utility operating pursuant to a valid franchise with the City of Tigard,when the owner and the applicant are different
people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the
owner. The owner(s) must sign this application in the space provided or submit a written authorization with this application. Franchised
Utilities are not required to obtain the owner's signature on the application
BY SIGNING BELOW,THE APPLICANT(S) SHALL CERTIFY THAT:
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the submc-t-
propeM.
• If the application is granted,the applicant will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
• All of the above statements and the statements in any plot plan,attachments,and exhibits transmitted herewith,are true;and
the applicants so acknowledge that any permit issued,based on this application,may be revoked if it is found that any such
statements are false.
• The applicant has read the entire contents of the application,including the policies and criteria,and understands the
requirements for approving or denying the application.
"K*"'"J'"aroea'
JON ANDERSON D AIFM.E-JOMlDERSON®.M-J OPDBPND COM.
MA UUND BRD�DBMlO LLC.AN W NlDER,
WWN17072516Q:SLO1 JON ANDERSON 7/25/2017
Applicant/Authorized Agent's signature Print name Date
SIGNATURES of each owner of the subject property,if required.
Owner's signature Print name Date
Owner's signature Print name Date
Owner's signature Print name Date
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit: DETAILED S1131\11TTAL
APPLICATION FEE
Part 1: Required submittal fee$300.00
FRANCHISE UTILITY AND SIDEWALK/
PERMIT FEE DRIVEWAY AND UTILITY
Part 2: All non-water system improvements CONNECTIONS,ETC.
Engineer's estimate X 5%(less$300.00 submittal fee) (work in the right of way)
Engineer's estimate X 2%Plan Review Sketch
(including information below)
WATER SYSTEM FEE
❑ Dimensions
Part 3: All public water system improvements ❑ Street Name
Engineer's estimate X 12% ❑ Site Address
PFI Permit Fee Exemptions: FULL SCALE DEVELOPMENT
There will be no permit fee charged,or assurance required
(Subdivisions/Partitions and Street Improvements)
for the following types of work:
• Sidewalk repair(less than 20 lineal feet)
• Relocate or replace mailbox Design Plans
• Ditch cleaning that does not involve regrading. (6 sets,24x36 or 22x34)
• Weep hole repair ❑ Cover—Site,Vicinity,Abbreviation,Legend
• Curb repair or replacement(less than 20 lineal feet) ❑ General Notes(City,Water,Sewer,etc.)
• Lawn sprinkler system installation or repair ❑ Street(Plan,Profile)
• Street tree pruning or planting ❑ Water,Storm and Sanitary(Plan Profile)
• Planter strip landscape maintenance ❑ Water Quality Facilities
• Test wells ❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas,
Note. A cash assurance may be required per Storm,Sanitary,Water,Signage,Street Lights,etc)
TMC 15.04.140.(customer deposit) ❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and
plan log block,dates and sheet numbers.)
Additional Submittals
(per Land Use conditions)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design(if applicable)
❑ Water Department Approval
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4
SAMPLE SKETCH:
Edge of Pavement
I Ditch
Streetlight I —•-------•— —r---
t
• e RoO Dnat
werTrn
1
' Ileroj�os d�Soe'—
24
Existing House 1
Existing 1
�1 I �I Driveway
v� vi I 1
IL
i
>j I i
o
Existing Shop �
= 1
Power ole 1
I o o
I I a 951 1
------7roperijrl_iinne------L---
j I o
1
iI Fire Hydrant(FH)
� � I
Scale: 'I"=30'
� � I
I I
i
MINIMUM SKETCH REQUIREMENTS(Put"N/A"if Not Applicable):
North arrow Property lines&dimension Slope of property
Street &street name(s) Existing building, structures Utility&street light poles
Proposed work Existing curb or edge Trees
Existing S/W or of pavement Existing utility locations
D/W apron (sewer,water,storm)
PUBLIC FACILITY IMPROVEMENT PERMIT
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4
Agnes Lindor
From: Jon Anderson <joanderson@wavebroadband.com>
Sent: Tuesday, July 25, 2017 5:01 PM
To: ROW Permits
Cc: Gerald Oden
Subject: Wave project 100014678 - Metzger ES
Attachments: CityOfTigard-Permit-App.pdf; 100014678-CONTRACTOR-MAP&TCP.pdf
Categories: Routed for Eng. Review
Good afternoon,
We are looking to build a plant extension to Metzger Elementary from the NE corner of SW 90t'and SW Oak in Tigard.
We are currently building out to the Lincoln center under permit PF12017-0008 and this would be a lateral off of that
build. I looked everywhere I could for r/w measurements along SW 90`h Ave but was unsuccessful, so if these plans show
us being out of public r/w please let me know. Attached is the application along with the build plans/TCP templates. I
was asked to request that this permit be expedited if at all possible so that we can build this in conjunction with the
build out to the Lincoln Center and not break stride.
Thanks for everything and as always feel free to get ahold of me at any time.
Jon Anderson
Permit Technician
wave
business
wave broad band.com/business
503.692.6031 (m)
ioanderson@wavebroadband.com
1
100014678 M ETZG E R ES N A • 1 1 •
LINCOLN
^I(� I nI W E i • � • • •
10350 L I N C O 1 V S T s CONSTRUCTION NOTES:
TIGARDO R 9 7 2 2 3 1-ALL WORK AREAS TO BE RESTORED
f TO LIKE OR BETTER CONDITION.
2-ALL OTHER UTILITIES ARE BASED
GENERAL LOCATION SCOPE OF WORK OFF EXISTING LOCATES OR
UTILITY STRUCTURES
SIZE OF FIBER OPTIC CABLE=48CT
3-IT IS THE CONSTRUCTION
l CONTRACTORS RESPONSIBILITY
`zoo TOTAL DIRECTIONAL DRILL FOOTAGE= 520'(IN PUBLIC TO CALL FOR LOCATES PRIOR 10
RNV, DISTANCE INSIDE SCHOOL PROPERTY TBD) TO DIGGING
Cz— ..
TOTAL CONUITS/SIZE= (1)2" CONTACTS:
Construction Manager-
TOTAL VAULTS/SIZE= (2) GERALD ODEN 503-341-6060
24X36X36 CONCRETE goden@wavebroadband.com
#12 AWG LOCATE WIRE
i
LOCATE WIRE TEST STATION Permit Tech-
5/8"BY 5'GROUND ROD JON ANDERSON 503-692-6031
joanderson@wavebroadband.com
SITE ADDRESS/SECTION:
10350 LINCOLN ST
TIGARD,OR 97223
VICINITY MAP PACKET DESCRIPTION DESCRIP=NEWBYMBOLOGY:
*■■■■■ =NEW BORE(1)2"CONDUIT W!48CT
FIBER OPTIC CABLE INSIDE 1 CONDUIT
PAGE ■ .. =EXISTING 2"CONDUIT W1 144CT FOC
(FIBER TO LINCOLN CENTER)
TITLE PAGE
1-3 PROPOSED ROUTE —EXISTING WAVE VAULT/TIE IN POINT
PERMITS NEEDED: `., =BORE/RECEIVING PIT
CITY OF TIGARD(1) RESTORATION REQUIRED
TITLE
Title Page
PROJECT NUMBER
100014678
METZGER ES
36
CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
LIKE OR BETTER CONDITION.
e AK WAY
SW OAK WAY— _ 2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
UTILITY STRUCTURES
10443 0392 E10390
i 3-IT IS THE CONSTRUCTION
CONTRACTORS RESPONSIBILITY
10423 10398
TO CALL FOR LOCATES PRIOR
TO DIGGING *400
10420
CONTACTS:
r 104Z2 I-._ Construction Manager-
GERALD ODEN 503-341-6060
goden@wavebroadband.com
Permit Tech-
10429
JON ANDERSON 503-692-6031
10433 joanderson@wavebroadband.com
1043 - SITE ADDRESS/SECTION:
10350 LINCOLN ST
TIGARD,OR 97223
DESCRIPTION/SYMBOLOGY:
Refer to Title Page
i 10482
10496
1048i� $935 9945 1
SW OAK ST
SCALE TITLE
NA BASIC LAYOUT
PAGE NUMBER PROJECT NUMBER
1 100014678
PAGE 1 OF 3
,'Doc
/ CONSTRUCTION NOTES:
1-ALL WORK AREAS TO BE RESTORED TO
x-a�rM
/ LIKE OR BETTER CONDITION.
i
2-ALL OTHER UTILITIES ARE BASED
OFF EXISTING LOCATES OR
UTILITY STRUCTURES
3-IT IS THE CONSTRUCTION
CONTRACTORS RESPONSIBILITY
TO CALL FOR LOCATES PRIOR
TO DIGGING
CONTACTS:
Z\4
Construction Manager-
GERALD ODEN 503-341-6060
NEW:%!VAULT goden@wavebroadband.com
INTERCEPT FIBER/CONDUIT TO LINCOLN CENTER
SPLICE POINT Permit Tech-
BORE 7 CONDUIT NORTH TO SCHOOL W/0CT FIBER INSIDE
JON ANDERSON 503-692-6031
joanderson@wavebroadband.com
DO NOT DISTURB ADA RAMP
t' •. ...............................................................ISITE ADDRESS/SECTION:
10350 LINCOLN ST
TIGARD,OR 97223
-----------_---- ---_----- -- – --SW OAK ST -- — — — — DESCRIPTION/SYMBOLOGY:
-- Refer to Title Page
SCALE TITLE
,,•,•,,•,•••,..P. NA BUILD PLANS
-- PAGE NUMBER PROJECT NUMBER
NEW 2X3 VAULT 1 I
100014678
PAGE 1 OF 3
zo
• 80RE/RECEIVING PIT
I - CONSTRUCTION NOTES:
r—}-- NEW 2x3 VAULT 1-ALL WORK AREAS TO BE RESTORED TO
q II LIKE OR BETTER CONDITION.
METZGER ES I 2-ALL OTHER UTILITIES ARE BASED
U3 VAULT OFF EXISTING LOCATES OR
UTILITY STRUCTURES
I• 3-IT IS THE CONSTRUCTION
EXIT CITY OF TIGARD RAV I BORERECEIVING PIT CONTRACTORS RESPONSIBILITY
AND PROCEED ONTO SCHOOL PROPERrr RESTORATIONREOUIRED TO CALL FOR LOCATES PRIOR
TO DIGGING
DO NOT DISTURB ADA RAMP �i� • y�yr,
CONTACTS:
Construction Manager-
DRIVEWAY GERALD ODEN 503-341-6060
goden@wavebroadband.com
}.sac Permit Tech-
/ JON ANDERSON 503-692-6031
1p joanderson@wavebroadband.com
SITE ADDRESS/SECTION:
10350 LINCOLN ST
36'DEPTM MINIMUM TIGARD,OR 97223
DESCRIPTION/SYMBOLOGY:
/ Refer to Title Page
6*4p
re%c TITLE
BUILD PLANS
/ PAGE NUMBER PROJECT NUMBER
3 100014678
PAGE 3 OF 3
Page 80 2011 Edition
5.3 Two-Lane, Two-Way Roads
Shoulder Work w/ Minor Road Encroachment Diag. 300
Use this detail for non-freeway work which extends into a travel lane and
maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane
can not be maintained, or when traffic can not safely pass by in both lanes
simultaneously, use the appropriate lane closure diagrams—for example,
Diagrams 310 through 350.
A lane closure may be appropriate for conditions such as high traffic
volumes, high speeds, and inadequate approach sight distance to the work
space, or heavy equipment adjacent to the travel lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Cones shall be placed along the entire length of the work space. If a
protection vehicle is used and work is in place one hour or less, the
taper and tangent devices may be omitted.
4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there
is limited sight distance, consider placing cones or tubular markers on
centerline.
5. An arrow board in caution mode or truck-mounted PCMS with
"SHOULDER WORK"or other appropriate message may be used for
higher visibility.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 40 350 350 350 125
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 81
Shoulder Work w/ Minor Road Encroachment Diag. 300
ROAD to woRK
\ AHEAD
Initial
Warning A •
Sign
•
•
•
(Optionaq •
•
Protection Vehicle
w/TMA(both Optional)
See Chapter 4 — • Buffer
10'
minimum • 113
•
A ROAD
M NARROWS
(Optional)
B
ROAD
WORK
AHEAD ,
Initial
Warning
Sign
December 2011 Chapter 5
Page 76 2011 Edition
5.2 Shoulder Work
Short Duration Road Work Diagram 200
Diagram 200 covers activity in the roadway of 15 minutes or less with
vehicles parked on the shoulder. Typical work includes debris removal,
tagging of survey markers, or marking utility lines. Work in the roadway
coincides with gaps in the traffic so flow is not impeded.
1. Do not use this diagram if traffic must be controlled to gain safe access
to the work space due to conditions such as high travel speeds or
traffic volumes. Use the appropriate lane closure or mobile work zone
layout.
2. Use truck-mounted flashing warning lights on work vehicles. See
Section 4.3—Lights and Lighted Signs for exceptions.
3. For added visibility, truck-mounted arrow boards or PCMS in caution
mode may be used.
4. The work vehicles should be parked as far off the travel lanes as
practical.
5. If a ten-foot minimum travel lane can not be maintained or when
opposing direction of traffic can not safely pass, use the appropriate
lane closure diagrams such as Diagrams 310 through 350.
6. The initial warning sign should be used if the sight distance is less than
750 feet and traffic volumes are over 400 ADT.
7. A spotter may be used to warn workers of approaching traffic. This is
especially appropriate when sight distances are limited or speeds are
high. See Section 1.12—Spotter Performance and Training
Guidelines for additional information.
Chapter 5 December 2011
2011 Edition Page 77
Short Duration Road Work Diagram 200
11
Work Vehicle
(Optional)
ROAD
3 or more cones WORK
may be placed •• fir AHEAD
behind vehicle
for added visibility
Vehicle mounted
(Optional)
1 mile maximum
ROAD
WORK
AHEAD
Initial Warning Sign
(Optional-See Note 6)
December 2011 Chapter 5
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 December 2011
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
O
ig
Lu o .�. c.
W
R Luo O
0 o¢a I i
M
W$ 1 1 U-
m
3
Qo I H
a
a�
—�
__ • • (Pc
• a r
I I I • c~
I I E �. CL
3
I I •
I O # I • °°
• d �
I O o �.. Z I • . •
•'—
I LL`-00w4
i t
W
-----------------I
Sign Spacing and Buffer Lengths(feet) 1 1 Z
Posted pacloo g Between ns Buffer g 2
Speed A B C Space o¢ 0
20 50
25 100 100 100 75
30 100
35
40 350 350 350 150 2
45 180
50 500 500 500 210
55 1 250
December 2011 Chapter 5
Page 78 2011 Edition
Work on Shoulder Diagram 210
Diagram 210 covers stationary work with work or parked equipment on the
shoulder. This diagram does not cover work on a freeway shoulder. See
Diagram 710 for Freeway Shoulder work.
1. Vehicles should be parked as far off the roadway as practical.
2. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3— Lights and Lighted Signs for exceptions.
3. For added visibility, truck-mounted arrow boards or PCMS in caution
mode may be used.
4. Arrow panels in caution mode are recommended for work on roads
with posted speeds of 45 mph or greater and high traffic volumes,
greater than 2000 average daily traffic(ADT).
5. Requirements for signing and devices are shown in Table 5-2, below.
Table 5-2: Device and Signage Guidelines
Proximity to Edge of Traveled Way
More than 15 feet
or behind Barrier or Less than 15 feet
Guardrail
One advance warning sign is
Advance warning required and two signs are
Work in Place signs, devices, and recommended.
More than 1 Hour flashing warning Cone taper is required. Cones
lights are optional. along the edge of traveled way
are optional.
Work in Place Advance warning signs and devices are optional.
Less than 1 Hour
Sign Spacing and Buffer Lengths(feet)
Posted S acin Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 40 350 350 350 125
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 79
Work on Shoulder Diagram 210
1t
/ (Optional)
Protection Vehicle
WMA(both Optional)
See Chapter 4
•
• Buffer
•
•
• L13*
•
A
/ROAD SHOULDER OR WORK
AHEAD AHEADj'
Initial Warning Sign
1 T *Use as appropriate-see Table 5-2
December 2011 Chapter 5
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance(see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections(fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs Buffer
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 40 350 350 350 125 1
150
45 180
50 500 500 500 210
55 250
Chapter 5 December 2011
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
WORK
ROM
MEM
ROS
1 t
AMAD
BE
B
PREPTo
0 B
A (0PO"D
•
. wE
RDAD
toot IAoc ' P9EPAFIM ROM
'
TO sror NO"K
. N+Ao
A B B C
Buffer
H
"CB ,mt M .-
,00n.ryeu
. 1
B
TO BiI P
B low—n
I t C N FAD
ROM
YYORK
MEM
December 2011 Chapter 5