Loading...
Report (67) )4 I 3 , UOflO( FIRE SAFETY SYSTEMS AQUASAFETh FLOW TEST 7n I`7 . f j VERIFICATION Sf FORM 4 AaSETM Flow Test Verification Form Alliance Important installing contractor must submit this Member ID: completed fonn.Failure to do so nullifies the A11;4,10.. Pl Wµ�►1 system warranty.E-mail or fax completed fona Company Name: r►` to the Uponor Fire Safety Design Department Contact: Itelleff' Dtsl*wta" attechnicaLservicess uporpr.coraor952.997.1731. Phone: S03 I'Iq�- �y°l0 For questions,contact Uponor Technical Services at 888.594.7726 or technlcalserviceseuponor.com. Fax: /� Color of test orifice used: &CS , Job Name: +Vet T>Drr'ate. Static pressure(not flowing)reading at incoming ` Project Number: 1.44 i water supply into home or at main shutoff: b 7 Job Address: /3s—gz.. Residual pressure(flowing)reading at incoming water City: Troll o4 supply into home or at main shutoff; -If State,ZIP: OIL) q}�-3 What time of day was the flow test taken? 8°eO For designs not provided by Uponor,complete the Flow test method used? a Bucket 0 Flow Meter following information. Designer's Name: 73(.61/ Flow test gpm: 26 f ''r Company: nlAoJ` How many gallons of water did the design predict 954-99�- S)S o as required? !—7 Phone: Did the test meet or exceed design flow? t.Y1'es 0 No Fax: Which sprinkler did you flow?Number: 11. Is the warning sign permanently attached dose to the Location of head: OpselZ A4-Tri M4' main shutoff valve? 0 Yes alliTo pe 9/-Z C�/7 Date left in service with all valves open: Was this system required by code? Yes 0 No E ' Test Witnessed and Verified by: Name Srignafu ► Occup ion Date 141;6,Guotioll a Additional Explanations and Notes a Uponor,inc. Tel:800.321.4739 5925 148th Street West Fax:952.997.1731 Apple Valley,MN 55124 USA Web:www.uponar-usa.com