Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit (55)
CITY OF TIGARD SITE WORK PERMIT Permit#: SIT2017-00019 COMMUNITY DEVELOPMENT Date Issued: 08/29/2017 T k GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S1 9/2017 001 Jurisdiction: Tigard Site address: 11130 SW TIGARD ST Project: Dirksen Nature Park Subdivision: CHERRY HILL ACRE TRACTS Lot: 6 Project Description: Excavation,erosion control,concrete flatwork,stone veneer,seatwall,and boardwalk installation. Contractor: LEE CONTRACTORS LLC Owner: TIGARD, CITY OF PO BOX 896 13125 SW HALL BLVD BATTLEGROUND,WA 98604 TIGARD, OR 97223 PHONE: 360-852-2317 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 08/29/2017 $669.54 Plan Review 08/02/2017 $435.20 Type of Use: COM 12%State Surcharge-Building 08/29/2017 $80.34 Class of Work: ALT Info Process/Archiving-Lg$2.00(over 08/29/2017 $36.00 11x17) Project Valuation: $73,750.00 Info Process/Archiving-Sm$0.50(up to 08/29/2017 $25.50 11x17) Erosion Control w/Development 08/29/2017 $161.40 Site Specifics: Excavation Volume: 20 cu.yd. Fill Volume: cu.yd. Impervious Surface: 365 sq.ft. Engineered Fill: Soil Report Required: Paving: Grading: Landscaping: Site Prep: Storn Drains: Retaining Wall: Fire Underground: Accessible Parking: Fence: Total $1,407.98 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. T .se rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC . 'ailing 50..232.1187 or�+0..2.2344. Issued By: r / Permittee Signature:,`_ C-- .0 ........., x ./6-1 d- Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application Site Work FOR OFFICE USE ONLY City of Tigard R lEI% � Received II Date/B V Permit No.: 13125 SW Hall Blvd.,Tigard,OR 9723 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 - Date/B : g ... 11 Other Permit: - ,/, ' — 4,I>7 i T I G A R D Inspection Line: 503.639.4175 k 2'01 i Date Ready/By: nSee Page 2 for Internet: www.tigard-or.gov Notified/Method: ` Supplemental Information � ► �� �� .... �AA I 2'` .Y w1s� fir. x1YP OP t4,* p!sioN iIEOU DnE ig New construction N i emolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the v: A : R oc01 $T .ctor �" work indicated on this application. ❑ 1-and 2-family dwelling ommercial/ndustrial Valuation $ ,/_iQI ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: e' � �:,# mow. �t. ..: 3., �,JOS SITE 11 0#441k C AIi i CATION x " *55 6" I Total number of floors: Job site address: I l I 3C I S(v r G A-t2-j c-fn 2-2-T New dwelling area: square feet City/State/ZIP: r16A,z. ,) O g2 , 9 7 2_2_3 Garage/carport area: square feet Suite/bldg./apt.no.: l'\_%, A Project name: 012 K-S£.N N. .8.0.A,rdiJ UC_._ Covered porch area: square feet Cross street/directions to job site: 71 J Q� p S d square feet S W Tt�t IV Deck area: }7�Y_KL -p LD.t: Other structure area: square feet QCI1ii1ED 41" •m IC;' OSE ECKI.ST Subdivision: NV" Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no % Indicate the value(rounded to the nearest dollar)of all i 3 `'� b o Qp q co c 0( d c)Q " equipment,materials,labor,overhead,and the profit for the $ DESCRIPTION$o1;'Woink. ., work indicated on this application. (•.1 ,`rQ) �.It CA V n 04 n )..�✓O S I b n c4--c Valuation: $ 1 3 �5� C.7)n L fe- -5 — 1 ri-k ) S ele- v �ts_ Existing building area: square feet S \ j h(5 1�C by p rrdu�'47\14-7-- New building area: square feet �,PROPERTY OV1 NER k, *# 1 _ u Ltj :W'ENANT :5 mtil Number of stories: Name: C I r y 6 F .n G Pk-r2-0 Type of construction: Address: 1312.5 S W Pc4, Lt. $l.V Occupancy groups: City/State/ZIP: Ti G 4,D 00_ , 91 Z2 3 Existing: Phone:(S b5) 1 1 B• 2.4.1.6(o Fax:( ) .. New: m" CJ" Oma ' '►PPICAT H tcoNTATPRSN "` - ( NOTICE Business name: CI.r.r o: -n C.Ac rot All contractors and subcontractors are required to be Contact name: 7 t '�- licensed with the Oregon Construction Contractors Board �.� Address: 3 12.5 S W under ORS 701 and may be required to be licensed in the pr l�L g LVD , jurisdiction in which work is being performed.If the City/State/ZIP: "�)(�ar12� O� 7 Z.2.- 3 applicant is exempt from licensing,the following reasons apply: Phone:( S03) .1t 8 . 2_46 I, Fax::( ) Email: ` J e -1 , d or. 3 o v C +�ITRAC OR Business name: LE t Co►.1'T12 A c-reya S - BUILDING„PERMIT FE$* Address: p 0. 13c,),, 8(01 tele re erro fee sc# +uCeJ" City/State/ZIP: �,p,.TT-LLS C Q-d u 1V D YV A. Structural plan review fee(or deposit): Phone:(3(20 g 5 2 - B 31 ., Fax:(, ) FLS plan review fee(if applicable): CCB hc.: t 9 f0 S 3 S Total fees due upon application: 13 ,_,z v Authorized signature: ; . Amount received:Cli � This permit application expires if a permit is not obtained Print name: within 180 days after it has been accepted as complete. h D �G't"� ��' G It_ Date: ' 3 1 7 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) 1 City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards (5 dump truck loads), or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain, drainage way, or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. Excavation Volume: '2_cf, cu. yds. Grading Volume: (Soils report required for>5,000 cu. yds.) '2...._S cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU Iv I y ,. ❑ Concrete ❑ Other: *Total new impervious area including all buildings, sidewalks, and paving: 3 co v x Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application V Site Plan with Vicinity Map showing ❑ *Parking(including ADA)and Lighting coiiip 1ancr` Plan (� Grading Planand details 111 *Landscaping Plan [� Erosion Control aPlan and details ❑ Soils Report(if required) ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans '. Valua�i©nn,; Peewit Fie: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Sub ; al $500.01 to$2,000.00 $51.09 for the first$500.00 and 0 $2.69 for each additional$100 or fraction Commercial thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including $25,000.00. One-&Two-Family Dwelling 3 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building\Permits\SIT-PennitApp.doe 08/02/2016 2 Site Work Permit Application Plan Submittal Requirements T 1 GA RD Commercial, Multi-Family and One- &Two-Family Dwellings A site work permit is required for all commercial projects including new buildings, additions, accessory buildings larger than 120 square feet, modular structures and multi-family R-1 occupancies. A site work permit is required for excavation, fill,grading,paving, retaining walls, fire hydrants and fire department access on private property for work on individual lots not covered under the subdivision development. Note: A separate "plumbing" permit for site utility plumbing work is required for sanitary sewer, storm sewer and potable water systems on private property. Please see the Site Utilities - Plumbing Permit Application for plan submittal requirements. 1. SITE PLAN and vicinity map (fully dimensional, drawn to scale) showing the geographic locatio labeled with: A. map & tax lot# [(project name V site address ❑ suite number zoning V., applicant name `r! applicant phone number B. orth arrow. C. Scale (architectural or engineering only). D. Street names. E. Building pads (drawn to scale) with project location. 2. BUILDING PLAN submittal requirement: Three (3) complete sets, Civil only. All details listed below shall be incorporated into the plans: A. Site plan showing: kikf&- 1) Required parking spaces and driveways. '— '/Pc 2) A route, accessible toa persons with disability,leading from the public way to an accessible building entrance. 3) Accessible parking spaces and adjacent access aisle connecting with the accessible route. 4) Curb ramps along the accessible route, curb, sidewalk and gutter. 5) Finish grade elevations along the accessible route. B. Topographic survey plan showing grade elevations crossing the entire site. J C. Overall grading plan. D. Utilities plan showing: .-- f\J/N.. 1) Fire hydrant location and pipe size if on private property. 2) If the building is to be protected with an automatic fire sprinkler system, show location of the water service vault and the fire department connection (FDC) within 70 feet of a fire hydrant. 3) Size of underground water service for the sprinkler system. ✓ E. Erosion control plan complying with the requirements of the Clean Water Services (CWS) agency showing: 1) Silt fence locations. 2) Bio-filter bags/other approved barrier material surrounding catch basins. I:\Building\Permits\SIT-PermitApp.doc 08/02/2016 3 3) Illustrations detailing the correct installation of the silt fencing and catch basin protection. 4) Any other measures to ensure compliance with CWS standards. F. Landscaping plan. 8(3. ADDITIONAL REQUIREMENTS: A. Soils (geotechnical) report. A soils report is required for new buildings and additions to contain the following: 1) The report shall address the potential of soil liquefaction and instability (OSSC Sec. 1804.2). 2) Fills to be used to support foundation of buildings (OSSC Sec. 3301.1). 3) Foundation and lateral pressures exceeding 1,500 lb./sq. ft. (OSSC Sec. 1805). B. Fire flow and hydrant worksheet. C. Plan review deposit based upon project valuation. I:\Building\Permits\SIT-PermitApp.doe 08/02/2016 4 1 City of Tigard " COMMUNITY DEVELOPMENT DEPARTMENT C T I G A R D Building Permit Review — Commercial - With Land U s e Building Permit #: I 7--C%2 *D1? Site Address: M2 D Sw Tvold Shed Suite/Bldg#: Project Name: DtfivArt N -PM v .. . (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 4 (TC `r te PER 144 I T f&K 170i ?Mei< • 3 Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes e No gLand Use Case#: C"u P 2 B 13 -00e)0/ FPlans Match Approved Land Use: Site Plan P1 Landscape Plan ❑ Other: 5Urban Forestry Plan /Y' levation Plan ,A�}d`f� ding Height: Maximum Height Actual Height igl Conditions Met: at Prior to Submittal ❑ Prior to Permit Issuance 111 Business License: Exists: ❑ Yes X No,applicant notified to obtain business license Public Facilities Improvement (PFI) Permit: ,evtr7 eet?vbeets Required: ❑ Yes,applicant was notified , A No Applied For: ❑,,_,Yes ❑ No,stop intake r,� Notes: rd�N/7'/vi.1 f / 1 imtC 7* ls5onl'vki e5f= I t 1E= / Approved by Planning: G 13 Date: 8- / — Revisions (after Building Submitta b ly Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3//i 7 Site Plans: # Building Plans: # Building Permit#: ter building permit#above. Workflow Routing: [ lanning [—gineering Ci15ermit Coordinator D.-Reding ding Workflow Sign-off: ['Sign-off for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: fi.,,,,,,„..e........_ ---- 9--_ Date: 7/0) I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx r Engineering Review dP Slope at building pad: , _ `,PFI Permit#: glaPZ), /! f-► It,: 4►dir`_, Conditions "Met"prioroto issuance of building permit Jw, 7 • Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes No LIDA Facility on lot: Yes No d, fir''"r ''.,.._s - .+ , A .11AI ----- roved byine-ri .: Date 11] NOT Ap E !_ Notes: .' i /_�iC�iii = I� �i�fi►�./i ,. ��`-/alt_ �1!%s Approved by Engineering: /26/ 0 Date: -- Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved El Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit � d Date: d 2 ? i_ pproved,NOT Released: i' cry,�� �QC1 Guice Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: DC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes -- /A Tigard Trans SDC: ❑ Yes N/A Parks SDC: ❑ Yes 57N/A 11 /6 K to Issue Permit Approved by Permit Coordinator: Date: 5-/-2-'3/ I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_070915.docx Albert Shields From: Albert Shields Sent: Tuesday, August 08, 2017 6:54 PM To: Jeff Peck Cc: Gary Pagenstecher;Al Dickman Subject: Dirksen Nature Park - SIT2017-00019 & BUP2017-00214 Attachments: Conditions - 08-08-2017.pdf Jeff, in reviewing your plans and applications for the above permits Engineering has noted that the area of disturbance is great enough to require a water quality LIDA, which in turn requires a PFI permit which in turn means that meeting Conditions#7 and 8 in the underlying Land Use Case, CUP2013-00001, becomes required. Please note that I have highlighted them on the attached list of Conditions. I have also highlighted Condition#1 because I cannot confirm at this time that it has been Met. Accordingly, I will code these applications Approved but Not Released and will put them on Hold until the requisite conditions have been Met. Meanwhile, Plan Review will continue. Please let me know if you have any questions. Albert Shields. A RR;yy;FF RFC:FP/II 2_t!1 City of Tigard ' Memorandum CM OF TIGARiF T1 GARll BURPING III f ON To: Gary Pagentecher, Associate Planner From: Jeff Peck, Project Manager Re: Dirksen Nature Park CUP2013-0001 Conditions of Approval Responses Memo Date: July 31, 2017 Mr. Pagenstecher, Please accept the responses addressing CUP2013-00001 Conditions of approval for the Forested Wetland Boardwalk and Oak Savanna Overlook project. It is the intent of the memorandum to address conditions of approval relevant to the installation of the boardwalk and installation of the oak savanna overlook as this is one phase of a multi-year project. As such,we have noted in the responses where the condition will be met prior to future phased development. Responses will be provided for each phase of park development meeting the conditions for CUP2013-0001 prior to release of applicable permits. CONDITIONS OF APPROVAL THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO ISSUANCE OF A SITE PERMIT: To be reviewed and approved by the Development Services Division, Planning Department (Gary Pagenstecher, 503-718-2434) 1. Prior to site work, the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the city manager or designee within one week of the site inspection. C of A 1: The project arborist is Morgan Holen & Associates LLC. Morgan will inspect the tree protection measures installed, document compliance, and send written verification to the project planner prior to commencement of site work. This condition will be met. 2. Prior to site work, the applicant, if it is the City, shall show that the funds have been budgeted to plant the trees shown in the approved urban forestry plan. The applicant shall plant the trees and show that the maintenance funding is budgeted before final inspection. The budgeted funds will cover the city's average cost to plant and maintain a tree per the applicable standards in the Urban Forestry Manual for a period of two years after planting multiplied by the total number of trees to be planted and maintained. M1 C of A 2: No trees are proposed to be removed as part of the Dirksen Nature Park Boardwalk and Overlook improvement project. This condition is not applicable to this phase of development. 3. The applicant will enter the inventory data into the urban forestry plan or shall provide a fee to cover the city's cost of collecting and processing the inventory data for the entire urban forestry plan for the park development before final inspection. C of A 3: No trees are proposed to be planted as part of the Boardwalk and Overlook improvements. The forested wetland will be replanted with emergent vegetation and native shrubs by a restoration contractor after the boardwalk improvements are completed. Inventory data will be entered into the urban forestry plan in the future when street trees are installed as part of the Tigard Street improvement project. 4. The project arborist shall perform twice monthly site inspections for tree protection measures during periods of active site development and construction, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval directly to the project planner within one week of the site inspection. C of A 4: Morgan Holen & Associates LLC will perform site inspections twice a month, or with greater frequency as needed. This condition will be met. 5. The applicant shall provide revised electrical plans that eliminates all lights along the Fanno Creek trail. C of A 5: Park plans were revised to eliminate lighting along the Fanno Creek trail from Tigard Street to Tiedeman Avenue. This condition has been met. 6. The applicant shall provide revised site plans that eliminate the proposed boardwalk/overlook structures within the significant wetlands on the site. C of A 6: The applicant applied for a Comprehensive Plan Amendment(CPA)to remove environmental protection over a small footprint of the resource to allow for the boardwalks to be installed as part of the project. See CPA2015-00002 for CPA approval. This condition is no longer applicable to the project. 7. Prior to issuance of a site permit, a Public Facility Improvement(PFI)permit is required for this project to cover sidewalk improvements,utility connections, and any other work in the public right-of-way. Five(5) sets of detailed public improvement plans shall be submitted for review to the Engineering Department.NOTE: these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. PFI permit plans shall conform to City of Tigard Public Improvement Design Standards, which are available at City Hall and the City's web page (www.tigard-or.gov). If the work is performed by city crews or under contract with the city, a PFI permit is not necessary. All work shall conform with all applicable codes, standards and conditions of this case. C of A 7: The Dirksen Nature Park improvements will be phased over several years. Improvements within the public right-of-way will occur in a future phase of park development. Roadway and utility improvement plans encroaching into the Tigard Street right-of-way will be submitted prior to issuance of a site permit and PFI to complete that phase of the project. This condition will be met with that phase of park development. 8. The PFI permit plan submittal shall include the exact legal name, address and telephone number of the individual or corporate entity who will be designated as the "Permittee", and who will provide the financial assurance for the public improvements. For example, specify if the entity is a corporation,limited partnership, LLC, etc. Also specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. If the work is performed by city crews or under contract with the city, a PFI permit is not necessary. All work shall conform with all applicable codes, standards and conditions of this case. C of A 8: The Dirksen Nature Park improvements will be phased over several years. This phase of the project includes installation of a timber boardwalk and construction of the oak savanna overlook. The forested wetland will be restored under separate contract by a restoration contractor. A PFI permit will not be required for this phase of work as the improvements will be located in the park and not in the public right-of-way. 9. The applicant shall submit construction plans to the Engineering Department which indicate that they will construct a half-street improvement along the frontage of SW Tigard Street. The improvements adjacent to this site shall include: A. City standard pavement section for a Neighborhood Route from curb to centerline of at least 16 feet B. pavement tapers to tie the new improvement back into the existing edge of pavement shall be built beyond the site frontage as necessary; C. concrete curb,or curb and gutter as needed; D. storm drainage, including any off-site storm drainage necessary to convey surface and/or subsurface runoff; E. At least a 5-foot concrete sidewalk plus at least a 5-foot planter strip with landscaping and street trees; a 10-foot separated trail is acceptable; F. street trees in the planter strip spaced per TDC requirements; G. street striping; H. streetlight layout by applicant's engineer,to be approved by City Engineer; I. underground utilities; J. street signs(if applicable); K. driveway apron(if applicable); and L. adjustments in vertical and/or horizontal alignment if necessary to construct SW Tigard St in a safe manner, as approved by the Engineering Department. C of A 9(A-L): The Dirksen Nature Park improvements will be phased over several years. The applicant will submit construction plans for the Tigard Street half-street improvements meeting the conditions outlined above in the future. 10. The applicant shall provide a construction vehicle access and parking plan for approval by the City Engineer. The purpose of this plan is for parking and traffic control during the public improvement construction phase. C of A 10: The Dirksen Nature Park improvements will phased over several years. This proposal is to perform work in the park just south of Tigard Street on Tax Lot 900 and Tax Lot 1000. A parking area is designated on Sheet D2 for work associated with the Oak Savanna Overlook. A material,equipment drop off,and staging area for the boardwalk is shown on Sheet Dl. 11. The applicant shall provide approval from TVF&R for access and hydrant placement. C of A 11: The Dirksen Nature Park improvements will be phased over several years. The Tigard Street half-street improvements will be constructed in future years. Plans will be submitted to TVF&R for access and hydrant placement. TVF&R comments will be submitted to the Engineering Department. This condition will be met prior to issuance of applicable permits for this phase of park development. 12. Prior to issuance of permits,the applicant shall pay the addressing fee as applicable. (STAFF CONTACT: Paul Izatt,Public Works). C of A 12: The park improvements will not require addressing. This condition is not applicable. 13. The applicant shall provide information and/or calculations as necessary to demonstrate the adequacy of the existing and proposed sanitary sewer system to serve the proposed development, including consideration of additional development within the area as projected by the Comprehensive Plan. C of A 13: This phase of the Dirksen Nature Park improvements consist of building a concrete overlook within the oak savanna and installation of a timber boardwalk. This condition is not applicable with this phase of park development. 14. The applicant shall provide on-site water quality facilities as required by Clean Water Services Design and Construction Standards(adopted by Resolution and Order No. 00-7).The preliminary stormwater report provides preliminary information on these facilities. Final plans and calculations shall be submitted to the Engineering Department (Mike McCarthy) for review and approval prior to issuance of the site permit. In addition, a proposed maintenance plan shall be submitted along with the plans and calculations for review and approval. C of A 14: This phase of the Dirksen Nature Park improvements will not provide an on-site LIDA water quality facility. The impervious area being created is 366 square feet for the concrete overlook. The boardwalk decking consists of open steel grating. Future phases of development will continue to provide water quality treatment. This condition will be met for impervious areas installed in excess of 1,000 square feet. 15. An erosion control plan shall be provided. The plan shall conform to the "Erosion Prevention and Sediment Control Design and Planning Manual, February 2003 edition (and any subsequent versions or updates)." C of A 15: Erosion Control Plans were submitted with the building permit site works application. A 1200-C permit has been issued for the entirety of the project and recently amended for this phase of the project. The 1200-C plans are under separate cover. This condition is met. 16. The applicant shall obtain a 1200-C-N General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act if necessary. C of A 16: The 1200-C has been issued by DEQ/CWS. This condition has been met. THE FOLLOWING CONDITIONS SHALL BE SATISFIED PRIOR TO A FINAL INSPECTION OF THE STREET OR STRUCTURES. To be reviewed and approved by the Development Services Division, Planning Department(Gary Pagenstecher, 503-718-2434): 17. Prior to a final building inspection,the applicant shall call for a final planning inspection to ensure the project was completed per the approved plan. C of A 17: The Dirksen Nature Park improvements will be phased over several years. Upon completion of the boardwalk and overlook improvements, a planning inspection will be requested to ensure the project is completed per the approved plan. This condition will be met. 18. Prior to final building inspection, the project arborist shall perform a site inspection, document compliance/non-compliance with the urban forestry plan and send written verification with a signature of approval to the city manager or designee. C of A 18: The Dirksen Nature Park improvements will be phased over several years. Upon completion of the boardwalk and overlook improvements,the project arborist will provide written verification to the staff planner. This condition will be met. 19. Following final building inspection the tree establishment period shall immediately begin and continue for a period of two years. C of A 19: Street trees planted as part of the Tigard St Half-street improvements as will be maintained by the City of Tigard Parks Department in perpetuity. This condition will be met. To be reviewed and approved by the Development Services Division, Engineering Department (Mike McCarthy, 503-718-2462 or mikem(a tigard-or.gov): 20. The applicant shall confirm the existence of and/or dedicate additional ROW as necessary to provide at least 27 feet from centerline along SW Tigard St. C of A 20: Right-of-way will be dedicated on Tigard Street to provide a minimum of 27 feet from centerline heading south. This condition will be met when the Tigard Street improvements are constructed. 21. The applicant shall pay the applicable fee-in-lieu of stormwater detention prior to final building inspection. C of A 21: The project is adjacent to Fanno Creek and detention is not required. The Fee-in-lieu is paid per phase as required. This condition will be met per phase. 22. All elements of the proposed infrastructure (such as transportation, sanitary sewer, storm drainage, water, etc.) systems shall be in place and operational with accepted maintenance plans and certified by an engineer with expertise in that area prior to a final inspection of the street or structures. C of A 22: All elements of the proposed infrastructure will have a one-year contractor warranty and then will be under the operation and maintenance of the City of Tigard Public Works Department. This condition will be met. 23. The applicant's engineer shall submit a final access report to City engineering staff which verifies design of driveways and streets are safe by meeting adequate stacking needs, sight distance, width, clear area, design, and deceleration standards as set by the City and AASHTO. The applicant shall obtain approval of this report prior to final inspection of the proposed street and structures. C of A 23: The Dirksen Nature Park improvements will be phased over several years. The Tigard Street half-street improvements will be constructed in future years. The proposed boardwalk and overlook improvements will not affect access from the site to Tigard Street. This condition is not applicable to this phase of project. 24. All utilities along the frontage of Tigard St shall be relocated underground. C of A 24: The existing overhead utility lines have been designed to be underground. The condition will be met when the half street improvements are constructed. 25. All new utilities serving the subject property shall be constructed underground. C of A 25: The new utilities (power, water, storm, and sewer) have been designed to be constructed underground. The condition will be met when the half street improvements are constructed. 26. There are existing sewer and other easements running across the subject property. The applicant's site plan shows access will be maintained to these easements and no structures may be placed in these easements. Prior to final inspection of the street and structures, the applicant's engineer shall certify that these requirements are met. C of A 26: This condition of approval will be met. Storm Water Connection Permit Authorization Alit! 101J CleanWater Services .} n OF fIGARD Our commitment is clear. BUILDING I Permit Number CUP 2013-00001,SLR 2013-00002 This Authorization to issue a Storm Water Connection Permit,in accordance with the requirements of Resolution and Order 07-20,including section 3.01.2,when signed and dated by the District,verifies that the District has reviewed the construction plans,as submitted by the City,and concurs that they are in accordance with the previously identified design standards and either, 1)the Service Provider Letter(SPL)or, 2)the Sensitive Area Pre-Screening Site Assessment acting as the SPL issued for project and is in compliance with the District's water quality protection standards. This authorizes the Jurisdictional City to issue a Stormwater Connection Permit for the project. If modifications occur after the issuance of this letter which create a violation of the Service Provider Letter,then the Permit becomes null and void. It is the responsibility of the Jurisdictional City to notify Clean Water Services of changes that effect the Service Provider Letter. Service Provider Letter Number: 13-000529 Date of Service Provider Letter: November 6,2014 Map and Tax Lot#: 1S134DD02400,00900,01000 Project Name: Dirksen Nature Park Boardwalk and Overlook City of Tigard Public Developer/Applicant: Works Jurisdictional City: Tigard Comments: _Ensure final plans permitted by_the City include the following: tea.200-C---Provide-initialed-Rationale-Statement.- CONCLUSION _ The City,in accepting this Authorization for permit,and authorizing construction of permitted activities,certifies that all portions of this project have been designed to CWS Design and Construction Standards,R&O 07-20,and have been reviewed and approved by the Jurisdictional City. Storm Water Connection Permit authorized by: Date: 7/28/2017 Steve Olson E:1Development Svcs\Plan Review\Storm Water Connection\StormWaterConnectionPermits archives\2017\Tigard-Dirksen Nature Park Boardwalk and Overlook-07-28-2017