Loading...
Permit (59) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2017-00214 Date Issued: 08/29/2017 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S134DC03001 Jurisdiction: Tigard Site address: 11130 SW TIGARD ST Project: Dirksen Nature Park Subdivision: CHERRY HILL ACRE TRACTS Lot: 6 Project Description: Glulam boardwalk on helical piers. Contractor: LEE CONTRACTORS LLC Owner: TIGARD, CITY OF PO BOX 896 13125 SW HALL BLVD BATTLEGROUND,WA 98604 TIGARD, OR 97223 PHONE: 360-852-2317 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 08/29/2017 $842.40 Demolition Occupancy Grp: Occupancy Load: 12%State Surcharge-Building 08/29/2017 $101.09 Dwelling Units: Plan Review 08/02/2017 $547.56 Stories: Height: ft DC Provision Review,COM New-Bldg 08/29/2017 $180.50 Bedrooms: Bathrooms: Info Process/Archiving-Lg$2.00(over 08/29/2017 $20.00 Value: $65,000 11x17) Info Process/Archiving-Sm$0.50(up to 08/29/2017 $50.50 11x17) Floor Areas: Total Area: Accessory Struct: Basement: Carport: Covered Porch: Deck: Garage: Mezzanine: Total $1,742.05 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-00 -0090. You m- obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: , Permittee Signature: 01, /(:. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. i uildin2 Permit Application Commercial rl ; r City of Tigard ReceiDate/Bve:d Permit No. /� �1��p • 13125 SW Hall Blvd.,Tigard,OR 97223 `,C4--1'` Plan Review ttJt/' 17tia.�[ 03,21' Phone: 503.718.2439 Fax: 503.598.1960 - li v\i Date/By: '.3.: Other Permit: e®17 --l.J C.� 7 TIGARD Inspection Line: 503.639.4175 `��` ( oi Ready/By: / urs: l0 See Page 2 for �F / Internet: www.tigard-or.gov `�,1"1-4 r b ,t'«'i'ied/Method:cic ///TTTX����'777 (7 /iv-//C Supplemental Information TYPE OF WORK 1.1G t REQUIRED DAT -AND 2-FAMILY DWELLING, e °I" , Permit fees*are based on the value of the work performed. ®New construction ❑Demd �� Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ 0 1-and 2-family dwelling ®Commercial/industrial ❑Accessory building ❑Multi-family Number of bedrooms: ID Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:11130 SW TIGARD STREET New dwelling area: square feet City/State/ZIP:TIGARD,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:N/A Project name:DIRKSEN PARK BOARDWALK Covered porch area: square feet Cross street/directions to job site:Tigard Street at SW Twin Park Place Deck area: square feet Boardwalk will be located in Dirksen Nature park west of the existing ball field Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:1S134DD00900 0 1 Opo Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Installation of one glulam boardwalk on helical piers Valuation: $$65,000.00 Existing building area: square feet New building area: square feet 0 PROPERTY OWNER 0 TENANT Number of stories: Name:CITY OF TIGARD Type of construction: Address:13125 SW HALL BLVD Occupancy groups: City/State/ZIP:TIGARD OR 97223 Existing: Phone:(503)718-2466 Fax:( ) New: 0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES* Business name:CITY OF TIGARD (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:JEFF PECK FLS plan review fee(if applicable): Address:13125 SW HALL BLVD Total fees due upon application 1 7.Si City/State/ZIP:TIGARD OR 97223 Amount received: Phone:(503)718-2466 Fax: :( ) E-mail:jeffp@tigard-or.gov PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name:Lee Contractors Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:P.O.Box 869 Solar Installation Specialty Code checklist. City/State/ZIP:Battle Ground,Washington Permit fee(includes plan review $180.00 and administrative fees): Phone:(360)852-8317 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:196535 Total fee due upon application: $201.60 Authorized signature: 4:: � This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Jeff Peck Date:7/26/17 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) 4 • Building Division � C Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 w III Building Division Plan Submittal Requirements T I G A R D Commercial&Multi-Family-New,Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ® map&tax lot# ® project name ❑ site address ❑ suite number ® zoning ® applicant name ® phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. .7 2. EROSION CONTROL PLANS AND DETAILS. — 3 Se--k3 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). '� B. Foundation plan. .GPS C. Floor plan(s). D. Cross sections. 4 E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. 4G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. Uv J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey,and full set of architecture drawings. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 a III Building Division Plan Submittal Requirement Matrix T 1 G ARD Commercial& Multi-Family- New,Additions or Alterations Type of:Submittal #°ff. Ia s (Inclu .es ntw,addi Ions and alterannns'* , f, Required t ,. .` itt� l y Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County,and Tualatin Valley Fire &Rescue),if applicable. I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 III City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T 1 c R n Building Permit Review — Commercial - With Land Use Building Permit #: 0/7-6)(:),),/ I Site Address: i't W SN v Ti. i Stred Suite/Bldg#: Project Name: D i Yi4CVL NmAK 1 Vk (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 4 (TC cr 2p6- pERrv117- F& ( N`1-Tc1R1~ /.)04/4 Ti Verify site address/suite#exists and active in permit system. ig River Terrace Neighborhood: 0 Yes No gLand Use Case#: Cu P 2 B/3 -004'0/ rPlans Match Approved Land Use: Site Plan Landscape Plan ov.4*.i3 ❑ Other: 5Urban Forestry Plan /v Elevation Plan ding Height: Maximum Height Actual Height igl Conditions Met: j$ Prior to Submittal 0 Prior to Permit Issuance JJ Business License: Exists: 0 Yes X No,applicant notified to obtain business license pit Public Facilities Improvement(PFI)Permit: 407 •PE,�V 12 .31 Required: ❑ Yes,applicant was notified No Applied For: ❑ Yes El No,stop intake Notes: wiz3..J 1 / N imp z• 1.5501-vh+ el,!`= f 17 icekii,y�(J Approved by Planning: G e of Date• �1 — t Revisions (after Building Submitta only Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ,VI/17 Site Plans: # _____4_______` Building Plans: # Building Permit#: nter building permit#above. Workflow Routing: E anning UkErigineering C`-Irrmit Coordinator ming Workflow Sign-off: 1 Sign-off for Planning(include notes from planning review) Route Application Documents: di,g: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: � Date: 7 It/j) I:\BuildingTorms\BldgPermitRvw_COM_WithLandUse 0601I6.docx Engineering Review ��� lope at building pad: amp FI Permit#: ,er— ■ Conditions"Met"prior to issu ce of building permit //.1: 0 Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes 0 No LIDA Facility on lot: ,Yes 0 No ❑ NOT Approved by Engineeri 1 :: Date Notes: s _ js:f .....-P ,40011 j ,...._462, n -,r ,.,.. A9, Approved by Engineering: 44 Date: 8,--.0°--/7 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit>6 Approved,NOT Released: Co.,�%*v-;.1 /fee 4414,cd irff-Date: if/S/14- Notes: f/SI — Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: tiErSDC Fees Entered: Wash Co Trans Dev Tax: ❑ YesT/A Tigard Trans SDC: ❑ YesN/A ./4Parks SDC: ❑ Yes N/A K to Issue Permit Approved by Permit Coordinator: 7/01-Date: i I:\Building\Forms\BldgPermitRvw COM_WithLandUse_070915.docx Albert Shields From: Albert Shields Sent: Tuesday,August 08, 2017 6:54 PM To: Jeff Peck Cc: Gary Pagenstecher;Al Dickman Subject: Dirksen Nature Park - SIT2017-00019 & BUP2017-00214 Attachments: Conditions - 08-08-2017.pdf Jeff, in reviewing your plans and applications for the above permits Engineering has noted that the area of disturbance is great enough to require a water quality LIDA,which in turn requires a PFI permit which in turn means that meeting Conditions#7 and 8 in the underlying Land Use Case,CUP2013-00001, becomes required. Please note that I have highlighted them on the attached list of Conditions. I have also highlighted Condition#1 because I cannot confirm at this time that it has been Met. Accordingly, I will code these applications Approved but Not Released and will put them on Hold until the requisite conditions have been Met. Meanwhile, Plan Review will continue. Please let me know if you have any questions. Albert Shields. 1 Albert Shields From: Jeff Peck Sent: Monday, August 28, 2017 7:54 AM To: Albert Shields;Al Dickman; Khoi Le Cc: Gary Pagenstecher; Carla Staedter Subject: RE: Dirksen Nature Park- SIT2017-00019 & BUP2017-00214 Attachments: MHA17044 Dirksen Nature Park -Tree Protection Monitoring 8-25-17.pdf Good morning All. Included is the initial tree protection monitoring report for Dirksen Nature Park—Boardwalk and Overlook Improvements. This is required prior to issuing building permits for the sitework and boardwalk installation. Let me know what I can do to help,we are ready to move forward on this project. Thank you all. Jeff Peck Project Manager Direct: (503) 718-2466 Cell: (971) 295-6588 Email: jeffpPtigard-or.gov City of Tigard Public Works Department 13125 SW Hall Boulevard,Tigard, Oregon 97223 From:Albert Shields Sent:Wednesday,August 9, 2017 1:07 PM To:Al Dickman <AL@tigard-or.gov>; Khoi Le<khoi@tigard-or.gov>;Jeff Peck<JeffP@tigard-or.gov> Cc: Gary Pagenstecher<Garyp@tigard-or.gov> Subject: RE: Dirksen Nature Park-SIT2017-00019 & BUP2017-00214 Thanks, Al. Jeff, it looks like we are back to Condition#1. Please let me know when the tree protection is in place. Thanks, Albert. From:Al Dickman Sent:Wednesday,August 09, 2017 12:30 PM To: Khoi Le<khoiPtigard-or.gov>;Jeff Peck<JeffP@tigard-or.gov>; Albert Shields<albert@tigard-or.gov> Cc: Gary Pagenstecher<Garyp@tigard-or.gov> Subject: RE: Dirksen Nature Park-SIT2017-00019 & BUP2017-00214 Apparently I made an error in reading the plan. Al. 1 From: Khoi Le Sent: Wednesday, August 9, 2017 10:25 AM To:Jeff Peck<JeffP@tigard-or.gov>;Albert Shields<albert(a@tigard-or.gov> Cc: Gary Pagenstecher<GarypPtigard-or.gov>; Al Dickman <AL@tigard-or.gov> Subject: RE: Dirksen Nature Park-SIT2017-00019& BUP2017-00214 From looking at the proposed improvement, I believe it will not need WQ or a PFI. I have asked Al to verify and get back to me. From:Jeff Peck Sent:Tuesday, August 8, 2017 7:06 PM To:Albert Shields<albert@tigard-or.gov> Cc: Gary Pagenstecher<Garyp@tigard-or.gov>; Al Dickman<AL@tigard-or.gov>; Khoi Le<khoi a@tigard-or.gov> Subject: RE: Dirksen Nature Park-SIT2017-00019& BUP2017-00214 Thanks Albert. Condition 1 cannot be met until the contractor installs tree protection measures which will happen after we sign them to a contract and have the project arborist submit the initial report stating the fencing has been installed. We will do this work prior to issuance of the permit. This phase of the development creates 366 square feet of impervious area in the Oak savanna restoration area. I don't understand how this requires a LIDA or a PFI. I see Al's name on here so I guess I will talk to him or Khoi about it. I appreciate your attention to this project. Jeff Peck Project Manager Direct: (503) 718-2466 Cell: (971) 295-6588 Email: ieffp@tigard-or.gov City of Tigard Public Works Department 13125 SW Hall Boulevard,Tigard, Oregon 97223 From:Albert Shields Sent:Tuesday, August 8, 2017 6:54 PM To:Jeff Peck<JeffPPtigard-or.gov> Cc:Gary Pagenstecher<Garvp@tigard-or.gov>; Al Dickman<ALPtigard-or.gov> Subject: Dirksen Nature Park-SIT2017-00019 & BUP2017-00214 Jeff, in reviewing your plans and applications for the above permits Engineering has noted that the area of disturbance is great enough to require a water quality LIDA,which in turn requires a PFI permit which in turn means that meeting Conditions#7 and 8 in the underlying Land Use Case,CUP2013-00001, becomes required. Please note that I have highlighted them on the attached list of Conditions. I have also highlighted Condition#1 because I cannot confirm at this time that it has been Met. Accordingly, I will code these applications Approved but Not Released and will put them on Hold until the requisite conditions have been Met. Meanwhile, Plan Review will continue. Please let me know if you have any questions. Albert Shields. 2 • DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 3 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Tel: 503.718.2439 Location: Inspection Date: 11130 SW TIGARD ST, TIGARD, OR, 97223 November 7, 2017 at 2:19:26 PM Record Type: Record ID: Commercial - Building BUP2017-00214 Inspection Type: Inspector: 299 Final inspection Chip Barnett Result: PASS - NoCofO Comments: Violation Summary: Inspector Contractor