Loading...
Permit (130) ,114CITY OF TIGARD MASTER PERMIT 2.. ' COMMUNITY DEVELOPMENT Permit#: MST2017-00306 T t AR.D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 08/23/2017 Parcel: 2S109DA10100 Jurisdiction: Tigard Site address: 15356 SW OAK VALLEY TER Subdivision: SUMMIT RIDGE NO.2 Lot: 90 Project: Nguyen Project Description: Installation of roof mounted solar photovoltaic system. BUILDING Floor Areas Required Setbacks Required Stories: 0 Bedrooms: 0 First: 0 sf Basement: 0 sf Left: 0 Parking Spaces: 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $0.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Storm Sewer: 0 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Drains: Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker: 0 Hose Bib: 0 Backwater Value: 0 Other Fixtures: 0 Drywell-Trench Drain: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc/Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr: 0 Ea add'I 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr: 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All Other: N Other Description: Roof top PV system Ecompasing: N BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: ALT SF VB R-3 0 Owner: Contractor: NGUYEN,HUNG ELEMENTAL ENERGY LLC Required Items and Reports(Conditions) DAO,HANH THI 3123 SE BELMONT ST 15356 SW OAK VALLEY TER PORTLAND,OR 97214 TIGARD,OR 97224 PHONE: PHONE: 503-967-5786 FAX: Total Fees: $353.19 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification, Center. Those rules are se forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.' 2.1987 or 1.800.332.2344. Issued By: / ' Permittee Signature: ��t ��� �/f(�l v . Call 503.639.4176 by 7:00 a.m.for the next available inspection .:Te. This permit card shall be kept in a conspicuous place on the job site until corn.letion of the project. Approved plans are required on the job site at the time of each inspection. % fr Building Permit Applicat 1 C Residential '"�'" City of Tigard a� Received " 13125 S W Hall Blvd.,Tigard,OR 97 A3 AUGG J 2017 Date/By: a-/// i{1Permit No.7� j/ —/r/1 geb Phone: 503.718.2439 Fax: 503. g Paan Review Cl G� V[J �d"0 ,'� t.J,@ Date Re $ •-• Other Permit: T 1 G A RD Inspection Line: 503.639.4175 q J L' lyl Date Ready/By: , II1 7 Ods: I p See Page 2 for Internet: www.tigard-or.gov (77 pt NotifiediMethod ! Supplemental Information BIJ$L I1 CD1$' SIO t TYPE OF WORK - REQUIRED DATA. I-AND 2-FAMILY DWELLING 0 New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑✓ Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 1p 1-and 2-family dwelling El Commercial/industrial Valuation: $ ElAccessory building 0 Multi-family Number of bedrooms: ❑Master builder Other: Number of bathrooms: / JOB SITE INFORMATION AND LOCATION Total number of floors: / Job site address: 15356 Sw Oak Valley Terrace New dwelling area: y b square feet — City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED-DATA:COMMERCIAL-ESE CHECKL ST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/tercel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. 5.590 kW Prescriptive Roof-Mounted Solar PV Installation Valuation: $ Existing building area: square feet New building area: square feet Q PROPERTY OWNER 0 TENANT Number of stories: Name: Hung Nguyen Type of construction: Address: 15356 Sw Oak Valley Terrace Occupancy p y groups: City/State/ZIP: Tigard, OR 97224 Existing: Phone:(504) 905-8488 Fax:( ) New: 0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT-FEES*— , Business name: Elemental Energy IPlease referto feeschedulej Contact name: John Grieser Structural plan review fee(or deposit): Address:6819 SE Foster Rd. FLS plan review fee(if applicable): City/State/ZIP: Portland,OR 97206 Total fees due upon application: Phone:(503 )967-5786 Fax::( ) Amount received: E-mail: john@elementalenergy.net PHOTOVOLTAIC SOLAR PANEL SYSTEM * CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: Elemental Energy, LLC Submit two(2)sets of roof plan with connection details Address:6819 SE Foster Rd. and fire department access,along with the 2010 Oregon Solar Installation Specialty Code checklist. City/State/ZIP: Portland,OR 97206 Permit Fee(includes plan review Phone:(503 )967-5786 Fax:( ) and administrative fees): $180.00 CCB lie.: 195141 State surcharge(12%of permit fee): $21.60 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained i within 180 days after it has been accepted as complete. Print name: John Grieser Date: 7/13/2017 *Fee methodology set by Tri-County Building Industry Service Board. 1:\Building\Pennits\BUP-RESPermitApp.doe 02/24/2011 440-4613T(l 1/02/COM/WEB) r Electrical Permit Appli i ) FOR OFFICE USE ONLY City of Tigard Received eDat/By: Permit No/ff /7_)0?e(,,ceive 114 ■ 13125 SW Hall Blvd.,Tigard,OR 9.72 2,3 9 017 Plan ReviewJJOther Permit: ' Phone: 503.718.2439 Fax: 503.5 0 Date/B Inspection Line: 503.639.4175 Date Ready/By: ions. Ed See Page 2 for 1'I G A RLI Internet: www.tigard-or.gov a "TIGf� Notified/Method: Supplemental Information ��f^("1 OV ISI' 4 4}M ' �CIIO 1~Lt1N i2EX 17 Please check all that apply(submit 2 sets of plans w/items checked below): New construction �✓ Ad(11 t�a ration/replacement ❑Service or feeder 400 amps or more ❑Building over three stories. 0 Demolition ❑Other: where the available fault current 0 Marinas and boatyards. ON exceeds 10,000 amps at 150 volts or 0 Floating buildings. COF ATEGORY to ground,or exceeds 14,000 0 Commercial-use agricultural LJ 1-and 2-family dwelling Commercial/industrial❑ Accessory building amps for all other installations. buildings. ❑Multi-family 1:::Master builder Other: 0 Fire pump. 0 Installation of 150 KVA or ❑Emergency system. larger separately derived system. JOB SITE INFORMATION .AND LOCATION 0 Addition of new motor load of 0"A","E","1-2","1-3", 100HP or more. occupancy. Job no.: Job site address: 15356 Sw Oak Valley Terrace IDSix or more residential units, 0 Recreational vehicle parks. ❑Health-care facilities. 0 Supply voltage for more than City/State/ZIP:Tigard, OR 97224 ❑Hazardous locations. 600 volts nominal. Project name: 0 Service of feeder 600 amps or more. Suite/bldg./apt.no.: FEE SCIIEDI1LE Cross street/directions to job site: Description I Qty. I Fee. I Total New residential single-or multi-family dwelling unit. Includes attached garage. Lot no.: 1,000 sq.ft.or less 168.54 4 Ea.add'1 500 sq.ft.or portion Subdivision: 33.92 1 Tax map/parcel no.: Limited energy,residential 75.00 DESCRIPTION OF WORK (with above sq.ft.) Limited energy.multi-family 75.00 2 5.590 kW Prescriptive Roof-Mounted Solar PV Installation residential(with above sq.ft.) Renewable Energy 0 See Page 2 Services or feeders installation,alteration,and/or relocation 0 PROPERTY OWNER, ,0 TENANT 200 amps or less 100.70 2 201 amps to 400 amps 133.56 2 Name: Hung Nguyen 401 amps to 600 amps 200.34 2 Address: 15356 Sw Oak Valley Terrace 601 amps to 1,000 amps 301.04 2 Over 1,000 amps or volts 552.26 2 City/State/ZIP: Tigard, OR 97224 Temporary services or feeders installation,alteration,and/or relocation Phone:Q504) 905-8488 Fax:( ) 200 amps or less 59.36 1 Owner installation:This installation is being made on property that I own which is not 201 amps to 400 amps 125.08 2 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 401 amps to 599 amps 168.54 2 Owner signature: Date: Branch circuits—new,alteration,or extension,per panel CONTACT PERSON A.Fee for branch circuits with ✓.APPLICANT above service or feeder fee, 7.42 2 each branch circuit Business name: Elemental Energy B.Fee for branch circuits without Contact name:John Grieser service or feeder fee,first 56.18 2 branch circuit Address:6819 SE Foster Rd. Each add'I branch circuit 7.42 2 Miscellaneous(service or feeder not included) City/State/ZIP:Portland,OR 97206 Each manufactured or modular 67.84 2 dwelling,service and/or feeder Phone:(503 )967-5786 Fax: :( ) Reconnect only 67.84 2 E-mail: john@elemetalenergy.net Pump or irrigation circle 67.84 2 CONTRACTOR Sign or outline lighting 67.84 2 Signal circuit(s)or limited-energy See Business name: Elemental Energy panel,alteration,or extension. Page 2 2 Address: 3123 SE Belmont St Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25/hr City/State/ZIP:Portland,OR 97214 Investigation(1 hr min) 66.25/hr Phone:(503 )967-5786 Fax:( ) Industrial plant(1 hr min) 78.18/hr Inspections for which no Ice is 90.00/hr CCB Lie.: 195141 Electrical Lie.:C1228 Suprv.Lie.: 4786S specifically listed(%hrmin) ELECTRICAL PERMIT FEES Suprv.Electrician signature,required: C'(6 -tom�� Subtotal: 7/13/2017 Plan review(25%of permit fee): Print name: Charles Harry t State surcharge(12%of permit fee): Authorized signature: /1/1TOTAL PERMIT FEE: Print name: John Grieser Date: 7/13/2017 This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. * Number of inspections allowed per permit. I:\Building\Permits\ELC_PermitApp_ELRERE.doc Res 05/21/2013 440-4615T(it'05/COM/WEB Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Fee for all residential systems combined ... $75.00 Description I Qty. I Fee I Total I * Renewable electrical energy systems: Check Type of Work Involved: 5 kva or less 100.70 2 5.01 to 15 kva 1 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 ElBurglar Alarm Wind generation systems in excess of 25 kva: 25.01 to 50 kva 301.04 2 n Garage Door Opener* 50.01 to 100 kva 552.26 2 >100 kva(fee in accordance with 552.26 2 ❑ Heating,Ventilation and Air Conditioning OAR 918-309-0040) System* Solar generation systems in excess of 25 kva: Each additional kva over 25 7.42 3 ❑ Vacuum Systems* >100 kva-no additional charge 0.0 3 EEach additional inspection over allowable in any of the above: Other: Each additional inspection is 66,25/hr 1 charged at an hourly(I hr min) Inspections for which no fee is 90.00/hr specificallz listed('/z hr min) COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Fee for each commercial system $75.00 Subtotal: (SEE OAR 918-309-0000) Plan review,if required(25%of permit fee): State surcharge(12%of permit fee): Check Type of Work Involved: TOTAL PERMIT FEE: This permit application expires if a permit is not obtained within 180 CAudio and Stereo Systems days after it has been accepted as complete. * Number of inspections allowed per permit. ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation ❑ Fire Alarm Installation ❑ HVAC ❑ Instrumentation ❑ Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical • Nurse Calls ❑ Outdoor Landscape Lighting* ❑ Protective Signaling n Other Total number of commercial systems: *No licenses are required. Licenses are required for all other installations 1:\I3uilding1Permits ELC_PermitApp_ELR_ERE.doc Rev 05,21/2013 4 City of Tigard Building Division 13125 SW Hall Blvd,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 TI G A R D Inspection Line: 503.639.4175 www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof.-M. nted PhotoVoltaic Solar Panel System Property Information Installation Address: 15356 Sw Oak Valley Terrace City: Tigard, OR 97224 Zip: Owner's Name: Hung Nguyen Date: 7/13/2017 Contractor's Name: Elemental Energy CCB #: 195141 Design Parameters o the Property/Structure If"Yes", does not Is the installati. qualify for the Yes Flood Hazard Located in a ood ❑ prescriptive path, follow Area plain/flood ay? ❑� No OSSC or ORSC for design requirements. Wind Exposure Is the ind exposure Yes If"Yes", qualifies for C"or less? ❑ No the prescriptive path. I stallations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ❑r Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Lo• i Is the Ground Snow Installations on all Load 50 psf or less? structuresIf"Yes", qualifies for other than ❑ Yes the prescriptive path. above ❑ No 1 I:Building/Forms/PhotoV oltaic-Checklist.docx City of Tigard , II Building Division 13125 SW Hall Blvd,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 TI G A R D Inspection Line: 503.639.4175 www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted 1 PhotoVoltaic Solar Panel System Property Information Installation Address: 15356 Sw Oak Valley Terrace City: Tigard, OR 97224 Zip: Owner's Name: Hung Nguyen Date: 7/13/2017 Contractor's Name: Elemental Energy CCB #: 195141 Design Parameters of the Property/Structure If"Yes", does not Is the installation qualify for the Flood Hazard Located in a flood ® Yes prescriptive path, follow Area plain/flood way? 0 No OSSC or ORSC for design requirements. Wind Exposure Is the wind exposure ❑ Yes If"Yes", qualifies for "C" or less? ❑ No the prescriptive path. Installations on detached Is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ❑✓ Yes the prescriptive path. and/or their accessory Ground structures. 0 No Snow Load Is the Ground Snow Installations on all Load 50 psf or less? If"Yes", qualifies for structures other than ❑ Yes the prescriptive path. above ❑ No 1 1.•Bui Iding/Forms/Photovoltaic-Checklist.docx Is the construction material wood and does Yes Type of If"Yes", qualifies for the construction qualify El No the prescriptive path. Construction as"conventional light frame" construction? Is the spacing 24 inches or less? Pre-engineered trusses. ElYes If"Yes", qualifies for the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? If"Yes", qualifies for Nominal lumber. ❑✓ Yes the prescriptive path. 0 No Is the combined weight El Yes of the PV modules and If"Yes", qualifies for racking less than or ® No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation layout in accordance 0 Yes « with Section 305.4(3) of If Yes , qualifies for ❑ No the prescriptive path. the 2010 Oregon Solar Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max. two layers the prescriptive path. ❑✓ of composition shingle. Is the roof mounted ❑✓ Yes Connections of solar assembly the solar assemblyconnected to roof If"Yes", qualifies for ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:/Building/Forms/PhotoV oltaic-Checklist.docx Is the gauge 26 or less? ❑ Yes If"Yes", qualifies for ❑ No the prescriptive path. 115 lbs for 60 inch spacing or less? If"Yes", qualifies for ❑✓ Yes the prescriptive path. ❑ No Minimum Uplift rating of Clamps? 75 lbs for 48 inches spacing or less? If"Yes", qualifies for ElYes the prescriptive path. ❑ No Attachment of roof mounted If the spacing falls solar systems Spacing of clamps? Minimum 24 inches within 24 inches and 60 directlyto inches inches, qualifies for the Maximum 60 inches prescriptive path. standing seam metal panels Width of roofing If the width of the panel panels? 18 inches or less is less than 18 inches, inches qualifies for the prescriptive path. Minimum#10 at 24 inches o/c? Size and spacing of Yes If"Yes", qualifies for fastener? the prescriptive path. ❑ No Is the roof decking of WSP min. %2"thickness, ❑✓ Yes decking connected to If"Yes", qualifies for framing members ❑ No the prescriptive path. w/min. 8d nails @ 6"/12"o/c? Is the height less than or Maximum 18 inches equal to 18 inches? Height of the from the top of the If"Yes", qualifies for solar modules module to the roof Yes the rescri tive path. p p surface. 0 No 3 I:Bui lding/Forms/PhotoVoltaic-Checklist.docx • Submittal Documents required for Prescriptive Installations Show the location of the PV system in relation to buildings, structures, property lines, and, as applicable, flood hazard areas. Site Plan Details must be clear and easy to read. Minimum size of the plan is 8.5 x 11 inches. Attach a simple structural plan showing the roof framing(rafter size, type, and spacing) and PV module system racking attachment. System must be shown in sufficient detail and clarity to assess whether it Structural Plan meets the prescriptive construction requirements as listed earlier above in the matrix. Minimum size of the plan is 8.5 x 11 inches. PV Modules Manufacturer: Hyundai Model Number: HiS-S29ORG Listing Agency: UL 4 I:B uilding/Forms/Photo Voltaic-Checklist.docx