Plans (17) MINDESI N. FIELD REPORT Page 1 of 1 II GDIect:. Polygon-129-03_, Prepared By..... , Greit GregSchaertl Project Name: River Terrace East Date•. , 8/18/17 Nation: SW Sholls Ferry&SW Roy Rogers, Report#: 150 Beaverton , Arrival: : 0808. Departure: 0845 Weather:. Sunny, 50's Permit#: Site Visit Requested By: : Sam (Polygon) Met With(on site): Sam (Polygon), Zack(Strauss Excavating,on phone) ... bgthrough Observe footing subgrade at:6uildl 9(Units 39 rou thro h 43) Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving FR-58(12/06) Decommission temporary storm and sewer lines thro Tract E Upon arrival,contractor(Strauss Excavating)had excavated the footings for Building 9(Units 39 through 43)to the design footing elevation(see site plan). Footing subgrade varied from brown silt in the southern portion of the building footprint(Units 39 and 40)to crushed gravel structural fill in the northern portion of the building(Units 41, 42 and 43). According to contractor,the crushed gravel was%-inch-minus sourced from Baker-Farmington placed to a thickness of up to approximately 10 inches. According to the contractor,the northern portion of the site had previously been used by NEI (excavators)to store rock onsite. Prior to placement of crushed gravel, contractor removed geotextile from this area and stripped the underlying vegetation to expose brown silt that was similar to the brown silt exposed in the southern portion of the site. A'/z-inch diameter steel foundation probe was used to observe the consistency of the native silt and the density of the crushed gravel fill. Probing indicated that the native silt was stiff,with penetrations of less than 2 inches under full body weight. The crushed gravel fill appeared well keyed,and probing indicated that the material was dense, with penetrations of less than 4-inch under full body weight. The probe was used to penetrate the crushed gravel at several locations and observe the consistency of the underlying subgrade. Probing indicated that the underlying subgrade was stiff,with penetrations of up to 3 inches under full body weight. Based on observation, probing,and discussion with Polygon and Strauss Excavation,the footing subgrade observed today has been prepared in general accordance with GeoDesign geotechnical recommendations. Distribution: Attachments:Site Plan(1) Reviewed by: This report presents opinions formed as a result of ow obsenatbn of activities relating to geotedmIcal engineering or environmental services We rely on the convector to comply with the plays and specifications throughout the duration of the project irrespective of the pr .of our represerttive•Our work does bot gide supervision or direction of the awrvacoor.the contractors employees or agents,Our firm is not espeweible for site safe,.This field report irepresentation of our field.." recomm�ans.The report can only be considered find upon revYAle'edi1 n inject manager,as indi f s in the"Reviewed*y'section. r Signature:; :.. :r �&"ss 15575 SW Sequoia Parkway,Suite 100 1 Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068 arah:t I so - a . , v prlp �.' ..� —.:--'�y "_f •. ��� 7 fig&wT - 4 ��� • , • _ • IM's a .,„,..„, _,,,,.....„.., �„ 1 „ _ „,, . .. . gi ' .4 i�J.:-. g. !1 4 iVii. i� a� I�11 ` Ir ft�^ 11411111111111ell':11110111 ..,C” � (t ;.� r• i ''i mpM•wnl0wvn. sal IntArrial 8 Jqq ; a stio . i 1 �. ,, - -t' � :IUiPiLJjj: i ..,4;1 3�.� 1� i�,..., .:::::_-7.7:141;41 -t' ,� 3s''''-:-T.::' im.; www......; f SIA r\ z '.,. 1 : :14,1111! 1 ly ------- - - - - ..-s- , - ,i --.. ,, - .. . , pi -11„ - - r.. i f I. I I. : River•- Terrace ast Y ' uaMuDi'1t! it;II PLAN i " ,,,,.r Olt II .. .._. .m rs" illsrNssNORTH y41R► 1n' alt 8 ; -----«vm !!","!•!•,1,0•811•MiliMosm —-—omtpmnunz sash silt .s:� nilinWreliMMI rt�enrt snsrir.Din WWWie 11 MrYIr10,04r kiliiiir..* ......k. . itio . i (wudiris6oli it SCALE