Subject: Framing Clarifications
Hong Residence
12990 SW Hillside Terrace,Tigard, OR
MCE Project Number: 170541
Dear Mr. Eck:
As requested by Jonathan Roth of Jonathan Roth Construction on your behalf, Paul R.
Albertine, S.E. of Miller Consulting Engineers, Inc. has reviewed the design by our office
dated June 26, 2017, to provide clarification.
Detail 1 on sheet S3.01 is intended to provide anchorage of the main floor shear wall
piers to the shear wall below. These hold downs at each pier require anchorage only to
the shear wall below, and not to the foundation. According to prior construction
documents the shear wall below has hold downs at each end, and does not require
additional anchorage. Please refer to the attached sketch detail for clarification.
In the construction documents we have specified that all new 6 x 6 columns to be DF/L
No. 1. The construction documents also require verification of the presence of 6 x 6
columns below. The construction documents do not require verification that existing
column material is DF/L No. 1.
We trust that this letter/report is sufficient for your needs. If you have any additional
questions or comments, please do not hesitate to call. . Rt C T URq
nth. PO)
Respectfully,
Co c„, ��G I N Fc� (9,
Miller Consulting Engineers,Inc. cr 16572
.ned by Paul R DIGITALLY SIGNED
DN E 1(r�mdler-se.com,
co.P 'Albertine, �Q OREGON lV
Paul R Alb I E ening,0=Miller
:'. sul Engineers,Inc.", G�
Paul R. Albertine, S.E., P.E. L Port',S=Oregon,C=US
Principal goo R A Lg�G
EXPIRES:12 -31 -2017
Engineering Practical,Diverse Structural Solutions Since 1978
9570 S W Barbur Blvd.,Suite 100, Portland,Oregon 97219-5412
Phone:(503)246-1250 Fax (503)246-1395 www.miller-se.com
y
CE) OOP
(i)) <q j I,J AT L(1) 1 a (F) 1-7 0i),
17 'AT ( 0.( 5-r ("(-7ci (. 1> LJ/ 1r_7f},
/
owls IGF (pp- 571AD 006, ,"6 eVi57)
,( Pb1 ,1 I
ck . } f41 ) l
It
� `
-,...,,, i! I
1'
/f(rl 0
,�
y
II
I I
l t
Vt/ 1 z I tie) ;j/ /7 rf7rJi,
KI(r(rtv-r t)eo Is _
--------------=, 1
- (,i) Vi.r6- (nrw(,,,
1 I
I I
I r
sl?WCTUR� (L) I�K �1 . -16p pt WI(
�,Ep PROA-4. (0)s7,,,„p56,�
c�- G � N S, Flpv,r�_;tY`2.,, Note: If existing double stud
�- a 0 is not present add an
Lc- 16572 additional 2 x 8 stud and
DIGITALLY SIGNED pedI c-,1,,,,; fasten with two rows 10d at
.o OREGON 6 inches on center.
13
EXPIRES:12 —31 —2017
,ned by Paul R
ON E�ltmIller-se.com,
P Albertine,
Paul R Alb I E enng 0="Miller
su : Engineers,Inc.",
r L Pod ,S=Oregon,C=us
.08.07
9570 SW Barbur Blvd Project Name Hong Residence Project# 170541
Suite One Hundred
SS Portland,OR 97219Mb Location 12990 SW Hillside Terrace, Tigard, OR 97223
Client Ledgewood Construction
MILLER Phone 503.246.1250
CONSULTING Fax 503.246.1395 KEG8/4/17 1 of 1
www.miller-se.com By Ck'd Re4 Date Page
ENGINEERS