Report (38) Bend Office (541)330-9155 Carlson Testin Inc. Geotechnical Office (503)601-8250 Eugene Office (541)345-0289 g, Salem Office (503)589-1252 Tigard Office (503)684=3460 Special Inspection FINAL SUMMARY LETTER Date: August 1, 2017 Job#: T1607865 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Pacific Rim Martial Arts Address: 8970 SW Burnham St. —Tigard, OR Permit#: BUP2016-00235 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Cast-In-Place Anchors, Adhesive Anchors &Screw Anchors Structural Steel Wood Construction The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the "As-Built Condition" or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:\Projects\General\2016\T1607865\08-01-17 Final Letter.doc Updated 11/30/11 Date: August 1, 2017 Job#: T1607865 Page 2 of 2 CTI's services did notinclude responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. 4144 Neil S. Shannon Project Manager NS/jng cc: Pacific Rim Martial Arts—Mike Martyn'' mike.martyn@gmail.com City of Tigard Building Division—Walter"Chip" Barnett v EMAILED Eleven Engineering & Design LLC— Nate Carter Nate.carter@11-ed.com Radian Construction —Dave Whitney dave@radianconstruction.com Carlson Testing, Inc. Incompleted Items List (NCL) Aug 01,2017 T1607865. Project Name: PACIFIC RIM MARTIAL ARTS Project Address: 8970 SW BURNHAM ST TIGARD OR Permit No: BUP2016-00235 P.O.No: Project Manager: NEIL S. SHANNON Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 KEJ 12/12/2016 NO APPROVED MIX DESIGN ON SITE. MIX USED WAS WCP RECEIVED AND REVIEWED. STEVEN W. LEACH 05/12/2017 #355501WH. SLUMP WAS 3.5" AND AIR WAS 1.6%. 12/22/16: REMAINS OUTSTANDING. 2 TR 12/22/2016 NO APPROVED MIX DESIGN ON SITE. MIX USED WAS WCP RECEIVED AND REVIEWED. STEVEN W. LEACH 05/12/2017 406001W - SLUMP: 4", AIR: 1.6%. ENGINEER OF RECORD TO REVIEW. 3 KG 01/10/2017 NO APPROVED MIX DESIGN ON SITE. MIX USED WAS RECEIVED AND REVIEWED. STEVEN W. LEACH 05/12/2017 597FS. SLUMP WAS 4"±1" AND AIR WAS 1.5% 4 BP 02/01/2017 5/8" ANCHORS EMBEDDED AT 17" FOR HOLDOWNS WITH NO DETAILS CONFIRMED IN RFI NEIL S. SHANNON 08/01/2017 APPROVED DETAIL. #01. CC:PACIFIC RIM MARTIAL ARTS - MIKE MARTYN CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT ELEVEN ENGINEERING & DESIGN LLC - NATE CARTER RADIAN CONSTRUCTION - DAVE WHITNEY Page: 1 Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office Salem Office (541)345-0289 (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: July 27, 2017 Job#: T1701331 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Landmark Ford Lincoln—Service Department Renovation Address: 12300 SW 68th Ave.—Tigard, OR Permit#: BUP2016-00285 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Reinforced Concrete Screw Anchors Structural Steel All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full,without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TEST NG INC. Neil S. Shannon Project Manager NS/jng cc: Landmark Ford—Jim Corliss JCORLISS@LANDMARKFORD.COM City of Tigard Building Division—Walter'Chip' Barnett WALTER@TIGARD-OR.GOV BK Engineers Inc— Bill Berry BILL@BKENGINEERS.COM LRS Architects Inc—Byron Balogh BBALOGH@LRSARCHITECTS.COM R& H Construction—Dave Fuerstenberg DFUERST@RHCONST.COM P:\Projects\General\2017\T1701331\07-27-17 Final Letter.doc Updated 11/30/11