GDI Project: Polygon-129-03 Prepared By: Bret Moskal
Project Name: River Terrace East Date: 7/21/17
Location: SW Sholls Ferry&SW Roy Rogers, Report#: 143
Beaverton
Arrival: 1350 Departure: 1515
Weather: Sunny, 80's Permit#:
Site Visit Requested By: Spencer(NEI) Met With(on site): Spencer(Via phone), NEI
crew, onsite earthwork crews
Purpose. Evaluate: Lots 145 & 146 footing subgrade,Temporary parking lot, structural fill
Outstanding Issues: Proof roll road and curb base rock and repair as needed before paving
FR-58 (12/06)Decommission temporary storm and sewer lines through Tract E
At time of arrival I observed three earth work crew onsite in the process of preparing subgrade and fill.
„Lots 145& 146
I observed that one of the onsite earthwork crew was in the process of cutting footing subgrade for model homes
within lots 145& 146.I observed the subgrade to consist generally of structural fill material with areas of exposed
basalt. Using a%2"diameter steel foundation rod I probed the footing subgrade for the building within these lots.
Probing indicated stiff subgrade (Probing basalt I hit immediate refusal). I was informed there will be no footing
base rock.
Temporary Parking Lot
I observed that one of the onsite earthwork crew was in the process of preparwarea within lots 139& 140 for a
temporary parking lot for model homes. I was informed that crew placed approx.4"of%" minus crushed rock on
the surface of structural fill subgrade and there will be an approx. 2"AC section. Compaction efforts were completed
utilizing a large single smooth drum roller. I observed no to negliable deflection under the roller during compaction
efforts. Using a Y2"diameter steel foundation rod I probed the,parking area base rock. Probing indicated dense base
rock. I was informed AC section would be removed at a later date and subgrade repair before construction of
building.
.Structural Fill
While onsite I was informed by NEI that they had placed approx. l'to 1.5' of native fill material within lots '166-170
(see site plan for details). Compaction efforts were completed utilizing a CAT 815$)pad foot compactor. Using
Troxler 3430 nuclear density gauge I tested the relative density of the fill and compared the results to a field
adjusted proctor value of 116.0pcf'at 16.3 percent optimum moisture content(proctor value was adjusted due to
amount of rock present in testing areas). 92%compaction of optimum dry density value is required to meet our
recommendations. Areas tested met our recommendations. I observed 17 and 20 blows on a Y2"diameter steel pin
with a 6-lbs hammer to drive pin approx. 12" into material, indicating density compacted fill.
Based on our observations, testing,and,,probing, areas of observed fill, subgrade, parking area base rock,indicated
on attached site plan have been prepared in general accordance with our geotechnical recommendations.
15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I fax 503.968.3068
GEODESIGNzFIELD REPORT
Page 2 of 2
Distribution:
Attachments: Site Plans (1), NDDS(1)
Reviewed by: SMD
This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and
specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees
or agents.Our firm Is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing;and preliminary recommendations, can only be
considered final upon review of the Geopesign project manager,as indicated by initials in the"Reviewed By"section.
Signature: '
15575 SW Sequoia Parkway,Suite 100 I Portland,OR 97224 I Off 503.968.8787 I Fax 503.968.3068
GEODESIGNv NUCLEAR DENSITY GAUGE DATA
GDI Project: Polygon-129-03 Project Name: River Terrace East Date: 7/21/2017
Sampled By: btm Project Location; sw Shons Ferry&SW Roy Rosters,Beaverton Page: 1 of 1
Material Source Maximum Density:pcf(required) Optimum Moisture
A 3/4'1-0 CR Baker Farm A 125 pcf(D698) A 13.5%
B 3/4"-0 CR Baker Farm B 11 9.2 pcf(D6 98) B 1 2.8%
C 3/4"-0 CR- Baker Farm C 1 27.7 pcf(D1 557) C 12.0%
D Onsite Soil D 11 6.0 pcf(Field Adjusted) .. D 16.0%
*-Elevation relative to blow grade
Test % % %
Date Location Elevation* Fill Type Compactor Density
No. Moisture Maximum Require
1 7/21 structrai Fill-Lots 169-170 0 A CAT 815D 115.5 13.6 100% 92
2 7/21 Structrai Fin-Lots 168-167 0 A CAT 815D 108.6 12.6 94% 92
Polygon-129-03__FR143_072117__NDDS__btm
\ .
„,
p < 7
1 .._.c) EP\ 1 q 3
A
, .
41.
' � �, .a:' iI ,.^^R^.. $ i ,;,# ■ ,•”` --.. --#: mom. - ,•�■vr. ....,.. _I. * x43 - 1ei i CcCR.
Lillir „ "71'.."'"a'"'"'"I;;'""IN/ • ' :,:, *, —
,,''''';::.----1,-:,.„...,.,.-"`-'
,r..F^`F -s r - -#rte 4 c -.lilt $ a liyc y t
«. «. w - h R! .
� dd RR °°o® . y,� .. 290�9 E ^: "` t;tpirr .`- f 174'#(0,411.1'01, POIYGONNW COMPANY
g.
q. —11411 1 . 4404''''y3„a�,a 'd'as,•-yr�� h a< t,'
) ,, ». «,». , "'°� y4 �[` 1 ifivita` 9N} 4 ,.'s'
L t r t'•.
1141
ei,
j 1 _ .-------;,i.•;===----. ►, 11.f I a ,4 -d iii `: -, r.:m.au,/FIN...,:r.es:...
z
a z+cq xrstib, �y4 ■•r �` m #p
41 wr IS. t- c: +� s f ti a .5[ 'i ,n YGR amir 1. ._` ttF#
' „,,,' 001'-.0e..R s s is a a° e' ii r.`r i . r rs. x £
,70 1
I
t� a s��l � } .� trip. �` �tnM � a' «,, r � � ' 1s,+rsar *+;mf.-
•
a +
« 8 i3it " { girt a [, .,1$ v,n«...,— '.��v.,...wss,R<.e.i ale ,q fr9R p_ �16
§ &,r >R _ nilm
410;111,..
a ��l ic.w �ttb t d a y��I :�t y4. a w[n
'R4 '''11',..''','''..---'
` IE1 5L I ,.. ^� _.._,limn
�N P,_______ __ ,...w l ---,.;i
; .+"^S ' +,,,-.I�-J. 4 r £r f Fx E
[ [P�iR" j'1y 14fir$ 1wR 11
River
Terrace
���r� •Larmw. "if � � ��' �, � ,, er
7 }1 * _ .,„1 : A11wr --ii:�Ilr�` - t t h /J 4t4 '" i East
7y.111 oy p }7L.
, ConsWction Documents
3 le* y �' `s fr GRADING
•. �a■i1�aa1�3olkare.its salsa■� SI.L:niam is? in, .■.n: .—: PLAN
■
F.
MATCHLDIE
NORTH
ill
ail
GRADING PLAN SHEET S 3
rttact,iiil .1 on
to CF -�.._.... ..«.....:.,,,. - ,..
G. 5[0.[ .:...
ASSRLYIATIDN LEGEND:
.
� �ll�[/ «. d6«PW°•SNRF SII■itl ................ Mf: C46iPurnM
��"'TT �+ L71p9PRi Ail CONSTRUCTION NOTES M.rorawnu KVF,wFe sr. zwru
i 61 O[rtiC. aq ,+' 10[a
MEM oxa [P[pcewa W«ilpel(y. rP,... err
RRADRMRSEIEER
E ua[a .c:amnl awcmrawauc
120aW1ei43A aw. uwPewf0ml,n<axmcrms t mstoimiuoa[■■N&tmpa■wu[2r
/�� 0[5001201 F It i1,Zr504[,,,,,,GlmPOPr Mme. 6CMY.etS
;►t�'"- 6 1$1110 3 ul0 AYE 13.50FOrFONGI P[MRfmolre la LL...'
ix_RR:_ta 0Fnt •s _34P&OMSOpF i, R:SfA C.A5O t.5LmI0Ri 11,, m e
tYR F(i;miYl[L4324 ,QM (.1040014 301.
1111 213[143[20.EMI$01YM01ttil01530[I.rMrdO W1 mmlw srwrnwu.ro COnsC Px1
rasrtF., m00[0'E1[A
E22.0mono. -amvcx ::. .=-,a .r _. 0
�1. ( t t trrot 1. cey.A i. ww 0.20210S10110.2001121110E m sr
SCALE .
i;t awls 0#0.0[00.0-0
ELVVATtON PATUM:NGVD 29
64pn®,C ate. et P. abs.J`Jc�- °`f'�bltt oma-
111, 7--,,749)7-ov2
"RIVER TERRACE EAST"
PORTIONS r OF LOTS 745 AND
HUB AND TACK CERTIFICATION
NE & SE 1,14 SEC. 6, T 2 ', R 1 W W.M.
CI1Y OF T CARD, WASHINGTON COUNTY,; OREGON
SURVEYED JULY 19, 201
I I
FREPARED FOR: I I
POLYGON
bNOR9 THWEST
13TSCOMPANY LO9 I I LT�Oa 1 1 9LOT
1t
VANCOUVER, WA. 98660
I S89'58'43''E
8.0° S89"58 43"E. 37.00
1..11-L _ z* -- — _ _
_ --I
.. „::
,,
, _ _ _ ...._....._ „...... _ ___ ,,,,......__ _, ‘•12-. tNiN L 1 _ _
.... LOT 146 L -I� LOT ;148 14, LOT 144—
I I
jo
o
1 c»
4I.°°
c �—a: ,.. ,
st
7 r. ADJUSTED LOT 1
DESCRIBED ED IN N.
T APPROVED LOT LINE
04 oil' 1 ADJUSTMENT CASE
a ,„Cl, ANO. LLA2OI7-oOOO$ 1
t
__ . _�__� a °t H - - -
EASEMENT
PUBLIC UTILITY '�'� t
- __ _ _ __ __ —� �_ __
REGISTERED I
PROPESSICNAL ►
LANDz. 'SURVEYOR f N89'58`43"W` 45.00' \,
.. t
.. ,
OREGON
t a JULY 9,2002
TRAVIS a JANSEN
57751
SW DESCHUTES LANE
a RENEWS:60/2019`
I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALEa 10 20
SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT
n I HAVE ACCURATELY SURVEYED AND STATED THE OFFSETS.
TO THE FOUNDATION ENVELOPE FOR PORTIONS OF LOTS 145 1 INCH = 20 FEET
AND 146 OF THE' PLAT OF "RIVER TERRACE EAST".
DRAWN BY: OPS DATE: 7J21 /17
a. RVIEEI Tr.� DATE: / 1/ 7 ' IFiC ?1V11UN1TYt
z PLANNING - ENGINEERING SURVEYING
PROJECT NO.: 395-041
(5t 3) 941-9484