Loading...
09/04/1991 - Packet AGENDA NPO #3 MEETING WEDNESDAY, SEPTEMBER 4, 1991 - 7:00 P.M. TIGARD CITY HALL 13125 S. W. HALL BLVD. TIGARD, OREGON 1. CALL TO ORDER 2. ROLL CALL: PORTER BISHOP FROUDE GARNER HANSEN _ MORTENSEN SMITH 3. Approve Minutes from August 7, 1991 meeting. 4. Suggested amendment to fence requirement - presentation by Staff. 5. SUB 91-0013/ SLR 91-0003/ MIS 91-0013 /VAR 91-0013/ PDR 91-0005 - Burton Engineering & Survey - Applicant requests a subdivision preliminary plat/planned development conceptual plan approval of the area that has become known as Phase 213 of the Summit at Bull Mountain subdivision. LOCATION: Bull Mountain Road and SW 139th Avenue at south, and the existing southern terminus of SW 135th Avenue at the north edge of the subdivision. (WCTM 2S1 9, tax lots 102, 103, 104, 200, and 2S1 4, tax lots 900, 1000, 1100). ZONE: R-7 PD (Residential, 7 units per acre, Planned Development). 6. OTAK/MB Development. At the August 19, 1991 meeting,the Planning Commission decided to continue this item until September 23. The Commission preferred no crossing of the ravine on this property, because they felt the proposed road would be unsafe. 7. Review Notices of Decision received. 8. Other Business. 9. Adjournment TO ENSURE A QUORUM TO CONDUCT BUSINESS, PLEASE CALL LIZ NEWTON AT 639-4171, EXTENSION 3081F YOU ARE UNABLE TO ATTEND klbginljo*W-a f NPO 3 MINUTES August 7, 1991 Present: Porter, Froude, Garner, Hansen, Mortensen, Bishop (excused), Smith (absent) We had a joint meeting with NPO 7 and had a presentation from Liz Newton on the proposed new ordinance on RV storage,and a long discussion between members on new fence requirements. There was a new resident present - Mr. Reid- who has encountered a problem siting a fence on his new lot and home. He requested we vote for the new ordinance because the existing one is too restrictive. We jointly heard a presentation by David Bantz of Otak Engineering on a proposed subdivision for MB Development Company on property east of SW 132nd, south of Walnut. This proposal will come before City Planning Commission on Monday, August 19, 1991 , case number 91-0009. NPO 3 then went into our own meeting. We continued discussion on Otak - MB Development proposal. Herman Porter commented this new proposal was inadequate as the Gaarde Street extension because of the proposed size. He proposed we reject it and if the City Council decides on an alignment that goes through the proposed MB Development property to exist on SW 132nd. NPO 3 would concur in this plan, but if another alignment which makes a new intersection, other than an existing one, on SW Walnut, then the first proposal would be preferable. NPO 3 Motion - "Move to deny this proposal on the grounds the Gaarde Street extension through this proposed subdivision has not been included in the plan because the alignment for Gaarde Street extension has not been reconciled between NPO 3 proposal and Tigard Transporation staff proposal." Passed unanimously, we recommend strongly the City Council make Gaarde Street extension a priority to bring to a conclusion now. Approved annexation request by Brajawich because of septic tank failure. RV Storage Proposed Ordinance • We suggest a number be attached to the RV storage units allowed such as 1, 2, 3... • Make RV storage mandatory on private property rather than parked permanently ,. in the street as in some areas. • Explore and communicate ways that older neighborhoods can put in place or renew CC and R's to enforce new ordinance or to make rules the people in the individual neighborhoods would like put in place in their neighborhoods. Fences • NPO 3 requests that someone knowledgeable on this ordinance come to our NPO meeting in September. We did not take a position yet. We had many questions and discussed at length. We would request the wording before the "C" - probably "A" and "B" of the Code TMC 18.102.020 - Visual Clearance: Required. Submitted by, 4Bverly�Fr de Acting Secretary NP03MIN.807 loginvo PROPOSAL DESCRIPTION FILE NO: SUB 91-0013 / SLR 91-0003 / MIS 91-0007 / VAR 91-0013/ PDR 91-0005 FILE TITLE: BURTON ENGINEERING & SURVEY APPLICANT: THOMAS BURTON OWNER: SEIYU INTERNATIONAL 11945 SW PACIFIC HIGHWAY #302 1070 NW MURRAY ROAD TIGARD, OR 97223 PORTLAND, OR 97229 REQUEST: The applicant requests Subdivision preliminary plat/Planned Development conceptual plan approval of the area that has become known as Phase 2B of the Summit at Bull Mountain subdivision. This application is a continuation of the review of Phase 2 of the Summit at Bull Mountain subdivision. The original review requested; 1) Subdivision/Planned Development approval to allow 97 acres to be divided into 276 lots between approximately 8,000 and 32,000 square feet; 2) Variance approval to allow an increased lot width to depth ratio on certain lots where a ratio of 2.5:1 is normally required, 3) a Sensitive Lands permit to allow development of 54 lots on slopes that exceed 25% grade, and 4) two Lot Line Adjustments. Approval was granted for the northern 215 lots included in the preliminary plat. Consideration of the southern 58 lots (Phase 2B) and the method for access to SW Bull Mountain Road was continued by the Planning Commission and shall now be reviewed. Also, the applicant requests that the Commission approve sub-phasing of what was originally referred to as Phase 2 into 7 sub-phases. LOCATION: Bull Mountain Road and SW 139th Avenue at south, and the existing southern terminus of SW 135th Avenue at the north edge of the subdivision. (WCTM 2S1 9, tax lots 102, 103, 104, 200, and 2S1 4, tax lots 900, 1000, 1100) ZONING DESIGNATION: R-7 PD (Residential, 7 units per acre, Planned Development) COMPREHENSIVE PLAN DESIGNATION: Medium Density Residential NPO NO: 3 CHAIRPERSON: Herman Porter PHONE: 639-0895 STAFF DECISION XX PLANNING COMMISSION DATE 9/23/91 TIME 7:00 _ HEARINGS OFFICER DATE _/_/ TIME CITY COUNCIL DATE / TIME XX REQUEST FOR COMMENTS (see attached list) RETURN BY ATTACHMENTS: XX VICINITY MAP } LANDSCAPING PLAN _ NARRATIVE _ ARCHITECTURAL PLAN XX SITE PLAN STAFF CONTACT PERSON: Jerry Offer PREPARE FOR PLANNER APPROVAL: XX ADVERTISEMENT - TIMES _/ / OREGONIAN XX NOTICE TO PROPERTY OWNERS TO BE MAILED _ LETTER OF ACCEPTANCE OF APPLICATION NOTICE TO DLCD - ATTACHMENTS: COMPREHENSIVE PLAN POLICIES: 2.1.1, 3.1.1, 3.4.2, 3.5.1, 7.1.2 7.3.1, 7.4.4, 7.6.1, 8.1.1, 8.1.2 8.1.3, Bull Mtn. Community Plan CODE SECTIONS: 18.54, 18.80, 18.92, 18.150, 18.160, 18.162, 18.164 NEIGHBORHOOD PLANNING ORGANIZATION DEVELOPMENT REVIEW CHECKLIST NPO # 3 Request; Zone; Location; The applicant requests Subdivision preliminary plat/Planned Development conceptual plan approval of the area that has become known as Phase 2B of the Summit at Bull Mountain subdivision. This application is a continuation of the review of Phase 2 of the Summit at Bull Mountain subdivision. The original review requested; 1) Subdivision/Planned Development approval to allow 97 acres to be divided into 276 lots between approximately 8,000 and 32,000 square feet; 2) Variance approval to allow an increased lot width to depth ratio on certain lots where a ratio of 2 .5: 1 is normally required, 3) a Sensitive Lands permit to allow development of 54 lots on slopes that exceed 25% grade, and 4) two Lot Line Adjustments . Approval was granted for the northern 215 lots included in the preliminary plat. Consideration of the southern 58 lots (Phase 2B) and the method for access to SW Bull Mountain Road was continued by the Planning Commission and shall now be reviewed. Also, the applicant requests that the Commission approve sub-phasing of what was originally referred to as Phase 2 into 7 sub-phases. LOCATION: Bull Mountain Road and SW 139th Avenue at south, and the existing southern terminus of SW 135th Avenue at the north edge of the subdivision. (WCTM 2S1 9, tax lots 102, 103, 104, 200, and 2S1 4, tax lots 900, 1000, 1100) Please review the attached development proposal and comment on those items listed below which concern(s) this NPO regarding this application. This listing is a template to aid in your review of this proposal. Please let us know how you feel about this development taking place in your portion of the city. Thank You. Access To and From Site Traffic Impact Neighborhood Impact Environmental Impact w R • • COMMENT: NO COMMENT: [ ] Signed: Date: 3 W f S,II. i S.p. W S 2 0 H FI-5 8 9 S.W. NIGH TOR OR. W < sw MOINVTAW RIOT CT SIX ALPINE VIEW SX ALPINE VIEW— tE, O 41r qr ~J f W 4 „ T BURTON ENGINEERING AND SURVEY CO. nod�ffIn11945 SW PACIFIC HIGHWAY #302 TIGARD, OREGON 97223 PH. (503)639-6116 MAR 16 1990 FAX (503) 639-6117 March 15, 1990 CITY OF TIGARD PLANNING DEPS. NARRATIVE TO ACCOMPANY PROPOSED SUBDIVISION PLAT "BULL MOUNTAIN ST-RR !T VIEW ESTATES PHASE 2" The proposed subdivision plat lies south of phase 1 and extends from phase 1 which lies south of existing S .W. 135th. Ave . and extends south to Bull Mountain Road. This proposed subdivision area is approximately 97 acres and contains 276 lots . This proposed subdivision will be constructed in conjunction with the phase 1 portion. Construction of phase 1 and phase 2 will complete the extension of S .W. 135th. Ave . from S.W. Walnut St . through to Bull Mountain Road. Also the S.W. 132nd. connection through Bench View subdivision will be completed to Bull Mountain Road. These streets are designed to minor collector standards . All other streets are designed to local street standards . Considerable effort has been made to work with individual neighbors, CPO group, NPO. group and City of Tigard Planning and Engineering Departments in developing this plan. Lot sizes have been planned much larger than required for this zoning ranging in size from 8, 000 sq . ft . +- to over 32, 000 sq . ft . The lots have been designed for maximum view and compatibility with somewhat challenging hillside topography . Sanitary sewer is designed to for gravity flow throughout . Sewer on the easterly portion of the project connect through the phase 1 project , to the existing Bench View subdivision, to 3 Mountains Sewer recently constructed . The Southerly portion of the project must be connected to an existing sewer. located approximately 700 feet South of Bull Mountain Road on S.W. 139th. Ave . The Westerly portion of the project is planned to connect through the proposed phase 3 and extend North on the Bonneville Power right of way to the intersection with S.W. Scholls Ferry Road and connect to an existing sewer located just North of Scholls Ferry Road. The proposed storm drainage will drain to existing drainageways and calculations will be submitted with final plans for proper sizing of on and offsite storm facilities . Street construction can be maintained with a maximum of 12% grade except for the most westerly street in the project. We hereby request allowance of a 15 % grade on this street . Water system is being designed at this time in conjunction with Tigard Water District . They have agreed to provide an adequate water supply and we are working jointly to design the system. The system is somewhat complex and beyond the scope of this preliminary layout. Trees are an important consideration for a portion of this project . We request the Bull Mountain Community plan be adhered to for disposition of the trees . This plan requires at least 50% of existing trees be preserved during development. However, prior to development harvesting of marketable trees is permitted in accordance with the Forest Preservation Act . These trees must be replaced with suitable trees of at least 1 1/2 inches in diameter. We request the prerogative of being able to harvest these trees during the clearing process prior to development construction with the understanding they will be replaced as specified above . Removal of these harvestable trees would not count in the 50% preservation amount as specified on the Bull Mountain Community plan listed as item 5 under design elements . Lots have been designed to provide a building area with maximum view and preservation of natural trees and shrubbery. Trees are uniformly distributed on the northerly portion of this project . The tree line and locations are shown on the topographic map . Their are three major drainageways through this property. Lots have been designed with extra depth to preserve these areas in a natural state on the back portions of the lots . These back portions are therefore sloped more than 25% grade . Also the length/width ratio exceeds the 2 1/2 allowance . We are therefore applying for a sensitive land permit for slopes in excess of 25% on these lots as follows : Lots 1 thru 11 , Lots 42 thru 54, Lots 109 thru 123, Lots 128 thru 142 . We are applying for length/width ratio variance for lots 1 thru 3, Lots 45 thru 52, Lots 132 thru 142 . We also request a lot line adjustment to satisfy some concerns and requirements of neighbors as follows : Adjust T.L. 102 to accrue to T.L. 100 from the Northeast corner of T.L. 100 to the Southeast corner of T. L. 100 . This adds a 50 foot strip of land to T.L. 100 on the East side throughout its entire length. These T.L.s are indicated on map 2S 1 9 . An additional lot line adjustment is requested to allow 15 feet to be added to Lot 1 , Hi Tor(T.L. 100) This would allow the addition of 15 feet to the entire east side of Lot 1 necessary to allow the owner access to his back yard. This T.L. 100 is shown on map 2S 1 9 BB. The 15 foot strip would be taken from T.L. 200 as shown on 2S 1 9 map . RECEIVED PLANNING :f U L_ 2 9 BURTON FNGME.( nIN( AND SURVEY CO l 1945 SW PACIFIC HIGHWAY 4302 T.IGARD, C)REGON 9722:1 PH ( 503)639--6116 .h!ly 29 , 1991 ,)err`/-n1-f1.'r, Pt) Box 23397 13125 SW H, 11 Blvd . Tigard , Oregon 97223 R-9—, S+_lfitM"i t cot Rpt I i Mr'?UVItaln Phase 2 B =approval Plea , inti of final of pr•oje�'!c;t . Dear Here-.wick sm ;l1 rnsfs showing the proposed layout of the above mentioned project . We i7ave rareviously subrnvitt:ed this for rev"iE'w, btat: tice: friar) cl h rlfj the or do=r` of pha-iing fc)r proposed 6 , 7 and 3 as shown herewith .. We are! Ing tc) pr`oceed with approvals, as fol lows : 1 . Approval of preliminary layout: of i:)iV�se 2B . 2 . Al:)proval of phasing a�-: designated oi; the map i r)c 1 .1;_..! 'i n! 1g, ti id t' 36 35 34 33 32 31 30 29 4 16 15 37 38 39 40 41 42 43 44 14 45 53 17 13 52 51 50 49 48 46 47 12 54 ; s SS 56 57 g 60 n.> 10 120 79 119 9 118 117 116 80 8 111 112 81 78 113 114 115 77 SCALE 1"-300' , 7 82 76 JUNE 1991 98 83 JOB NO. 89 — 340 & 403 6 97 96 95 94 93 84 75 5 99 4 100 101 102 92 85 74 103 3 \ 91 86 73 109 108 2 104 72 6lv' 90 87 107 89 71 .. a - .'3.'... ..t. 392 384 823 354 123 122 121 248 245 244 `233 232 230 229 228 385 3 391 381 355 124 249 248 243 234 231 227 390 38b 356 125 250 247 226 380 251 242 235 225 / 387 379 357 128 252 282 241 236 224 281 240 223 389 388 378 358 127 253 2J8237 222 196 728 280 � 35s 129 254 2 239 227 197 377 376 360 T30 279 220 198 255 219 199 375 361 131 256 78 218 200 363 257 277 217 201 371 374132 258 276 216 202 1 364 362 259 4 133 3 275 21 204 203 193 373 365 214 372 366 274 205 194 0 213 06 780 290 212 07 370 369;3e8 211 179 1 79 387 189 s 295 294 2 178 14.5 762182 144 210 70 177 188 143 287 ' 163 146 142 141 140 283 284 285 286 169 1 183 1s4 r7s 18 165 147 1 168 175 184 148 149 140 151 iS2 153 =154 155 1S$ 1b7, 15$TM 1 166 334 352 335 333 351 350 297 296 336 332 337 330 331 349 OWNER: 329 298 299 300 338 348 Y y J,y,J�+'� 347 NTERNAT 10220ES.W. I GREE BUI RGAL CORP.303 302 301 328 PORTLAND, OR 97223 E 450 304 327 � 345 346 305 343 Jos 307 342 326 341 340 339 325 3URTON ENGINEERING AND SURVEY CO. 309 308 N;9 324 302 TIGARD PLAZA PORTLAND, OR 97223 310 PH.: 639-6116 323 317 4 3 12 POND