MEMORANDUM
sr02 i/
To: Mr.Tim Walker
Dream Builder Custom Homes Inc.
13115 SW St.James Lane
Tigard, OR 97224
'ax,O PROFFs
Date: October 17, 2016 co�G I N� '70
4.
From: Stig Widell, PE �r POR-'‘v N
Associate O ✓�Yt0.4P?
OA P
RE: Framing Inspection 6
Nguyen Residence Remodel EXPIRES: 6130/
12412 SW Autumn View Dr
Tigard, OR
We are writing this memo to inform you of our observations and recommendations
from our site inspection on September 16, 2016 at your request. We understand the
original contractor,Timber Ridge Development, and the owners are in disagreement
and will be entering mediation to resolve their issues. Our inspection is being
provided to inform you of our recommendations to complete the framing to meet our
design intent and are as follows:
Lateral Load Elements:
' A general review of the lateral design, attachments and details was performed.We
found the existing conditions to be in general conformance with the approved
drawings and structural intent,with the exceptions listed below:
A shear wall in Master Bath on upper floor was not attached to the roof truss.
Provided connection per our detail R1 at this wall location.
Shear wall in 'His Walk-in' at the master bedroom on upper floor is not attached to the
roof truss. Provide connection per our detail R2 at this wall location.
Shear transfer from the roof is required at the shear wall between Bedroom 2 and the
Entry. Install diagonal bracing per D22/56.
An HDU11 holdown was installed in lieu of the HDU14 indicated on the permit
drawings at dining room on the main floor. Verify anchor rods and install appropriate
holdown.
A_SHER1VIAN
ENGINEERING
INC f—I.
The Specified double sided shear walls currently have plywood on one side only. Once
shear inspection has been passed,the second side shall be installed.
It was noted that the shear wall between the crawl space under the garage and the
mechanical storage had a large number of missed nails. Verify nailing has been
installed per the shear wall schedule into framing members.
Several areas had nail heads that were not driven fully flush with the plywood. The
nail heads shall be tapped fully flush for all shear walls.
Interior shear wall straps shall be attached to framing below per detail D13/S5. In
areas where the framing member is not flush with the face of wall,blocking shall be
provided as shown in revised detail R3 such that the strap is no more that W' out of
plumb.
Per the framing inspection by David Young,verify that the plywood is nailed per the
shear wall schedule 'edge nailing'at point load transfer points per detail D14.
Framing:
A general review of the framing design, attachments and details was performed. We
found the existing conditions of the main house to be in general conformance with the
approved drawings and structural intent, with the exceptions listed below.The back
deck framing was incomplete and will require the revisions below.
Main House:
Roof header RHD1 in the master bath is specified as a 4x12,but a 6x8 was installed. A
6x8 DF#1 header is an acceptable replacement for this header in this location.
The headers over the windows in the great room were not specified on the plans and
therefore defaulted to the minimum 6x8 per the approved plans. It appears 4x8's
were installed in this location. We have reviewed the loading and find theses headers
to be acceptable.
Beam UFB8 appears to have been switched to a 5-1/8x in place of a 3-1/2x, which is
acceptable. The posts were designed as 4x10's to fit in a 2x4 stud wall, but have
changed to 6x6's in a 2x6 stud wall. We have reviewed the loading and find this
change to be acceptable.
SHERMAN
AENGINEERING _.
ZINC J L
Per the framing inspection by David Young:
The bedroom wall corner at the left rear shall be connected to the intersecting wall in
the closet. Finish nailing truss hanger at living room double girder truss. Bearing
plates or shims shall be installed at locations with hip crossing flat chord studs. Install
pressure blocking at jack trusses in garage for top chord connections to the wall per
the truss mfg.specs.
The post supporting UFB5 at the dining room was specified as a 4x6 post and a 4x4
post was used.We recommend adding a 2x4 this post with 16d at 8"centers.
The wet bar in the family room on the lower floor was eliminated from the plans. This
change eliminates the need for beam MFB2, however the footings in this
configuration require review. The permit drawings show an expanded footing that
was intended to provide support for the shear walls at the kitchen and it appears to
have been stopped short of the intersecting wall. Further site investigation is required
to verify the extent of the existing footings and possible need for retrofit in this area.
Exterior strip footings shall be embedded a minimum of 18" below grade per details
'BJ10' on sheet 10. Geotech shall review existing slope and grade to ensure the
existing conditions meet their specifications.
Deck Framing:
The deck framing, posts and footings were partially completed at the time of our site
observation.
It is our understanding that the pin piles were installed as intended per the 9-10-15
memo. However the tie grade beams have only been formed not poured at this time.
The deck posts have not been installed in the locations per the plans. This causes the
deck beams to have a span greater than which they were designed,therefore the post
locations or beam sizes must be changed. We recommend shifting the lower outer
columns to align with the center of the footings and install beams per the attached
markups. All posts and beams shall be attached with appropriate column cap and post
base brackets. See attached for deck framing configuration.
All exterior beams shall be pressure treated, per our notes, if they are intended to be
exposed, but may be untreated if they are to be fully wrapped and protected from the
elements.
Two of the deck posts have checks and splits that we have reviewed and find to be
within acceptable tolerances.
AS. HERMAN
ENGINEERING
INC ("L,___
The diagonal bracing and deck ledger shall be installed per detail D26/S6. The deck
joists shall be spliced per detail D27/S6.
If you have any questions please give us a call.
CC: Don Sherman,Sherman Engineering, Inc.
File-lnsp Memo 092016.doc
0 V _e) kkZ.
ox —x 111 . � > (ox�� E
1401- X
Wc 011
?con' k..4 t'w►'-t9
t.
x 4 x 12 G t. slag ;( j b'/Z .
It.
1 4If tia-Affsa
L
Tors- LOC4len►w S .. ..___
1 Si1 J G fol-Z- L.)Gov1-0‘\,) e-x t$11 NJ G o ST
M NI t%) rt. u,R- 9 I(_
�� 14-0 s,
t5'- Ser,,, - 'f t
%'
0
nC a -� a h
C:1 1 E3 [----0
fC1
5`4, x12 GL Ki 4 f. „pi,. 6xt2 rfF r.1:
K0f V2_ ?T.
N
%\iC " —.� se104_,t_. ��[y�. 1? _o Sty
�' ) ^Cr
ArsX14 xIt C., t- it _ I gt(5 x t'L G� 12
2KV V ''‘ Drbl' 2A4 f V 4 of(or
/-.—Sa--744)
D.........„ it-a_ 0 .N=r- J1 EL`M 0 N
1 ,v ?OS ?0S1- Cmc periclot S fr ) V2£44N. Sl
S
tv k—i*A1— 0 EXi-< fivt4 i 0 ?L- 0 ik'
PROVIDE Ibci's PER
'SOLE"NAILING ON SHEAR
SCHEDULE
EXISTING 2x10 TO REMAIN
r
00Elow
4 (E)
(E) TRUSS PER PLAN
NAIL TRUSS BOTTOM
I CHORD TO 2x W/I6d's
EXISTING A35's j PER 'SOLE NAILING ON
PER SHEAR SCFIEDU E SHEAR SCHEDULE
tl
SHEAR WALL W/SHEATHING PER
PLAN AND SI-EAR SCHEDULE
® SREAR TRANS. AT OFFSET TRUSS
RESKI SCALE: I" = I'-0'
PROVIDE A351s PER
SHEAR SCHEDULE
PROVIDE I6d"5 PER
"SOLE" NAILING S�O�N�SSHryryEAR�
EXISTING 2x10 TO REMAIN
1► � (E) TRUSS PER PLAN
;see
I
1
SHEAR WALL W/SHEATHING PER 1
PLAN AND SHEAR SCHEDULE
(-D SHEAR TRANS. AT OFFSET TRUSS
RF5K1 SCALE: I' = I'-o'
1
L ---'tr---- 2X STUD WALL
® Ib" O.G.
HOLDOWN STRAP PER PLAN
(WRAP STRAP AS REQ'D) )
FLR JSTS/BEAM PER PLAN
O O O
O 0 0 0
2X BLKG 0 0
O 0 0
Mit
1
l T518 STRAP EA END OF
JSTS W HOLDOWN
L STRAPS ABOVE PROVIDE BLOCKING FOR
TO BEAM WHERE OCCURS FLUSH STRAP INSTALLATION-
NAIL TO EXISTING JOIST W
(8) 16d's MIN.EACH SIDE OF
' STRAP
2X STUD BRG WALL--)
TYP AALL HOLDOt1N TO J5T/BEAM
HLDSK5 SCALE= 1" = I'-O"
2X4 DIA&
817 o 4" O.G.` r0.C. kV I6D G 4"
EA END
V' ' •lniiii. .y
Fir
r
f I
�
• i 2- I6D j..
i
r
..Jr \, •
(frx) NI V. : • NI .
2X4 BLKG ® TOP 6 BOT
OF TRUSS IN/(2)I6D
EA END d A35 CLIPS
49 16" O.G. TO TOP PLATE
1-#3 ANGN
DBL 2X TOP PLATE
D22 SHEAR WALL BRAG I NG @ ROOF TRUSS
RFT2A SCALE: I" = I'-O"
WALL 514T6 SIDING PER PLAN
DECK FASTENER INTO
LEDGER # J5T m 16"OCG.
FLASH BEHIND SIDING •
PT 2X LEDGER VW
1/4" X 3-1/2"5D5 WOOD rS-CREW5
1 AT 8"OL STAGGERED
W!MIN.2" EDGE DISTANCE
• 2X6 DEGK1N&
•
Air r r
Ilafolc�
E
DECK J5T PER PLAN
•
(17'-O" SPAN MAX)
LU52 HNGRS TO
LEDGER
2x STUD WALL 6 16" O.G.
•
2x DIA& BRAG'G W/
(2) I6dEAJST4A35TIE
TO RIM J5T(OR TOP PL)
I�2 DECK JOIST/MALL CONNECTION
FIr52A dck-IO' SPAN SCALE. i" = r'-O"
DECK FASTENER INTO
7 BLOCKING AT I6" o/c
2X6 DECKING
riir< r�rx i ,-
I
. ,
..,›
•. 1\
I
I
\. ADECK JST PER PLAN
/\OVER LAP DECK JOISTS
AND NAIL TOGETHER W/
(5) IOd NAILS 2x DIAG BRAG* W/
(2) 16d EA J5T 8 A35 CLIP
BEAM PER PLAN TO BEAM
DECK SPLICE CONNECTION
P27F1rS2A dck-IO' SPAN