Loading...
Report (32) ACS Testing,Inc ,rrrur 7409 SW Tech Center Dr.,Suite 145 Tigard,OR 97223 ""x111 SPECIAL INSPECTION REPORT phone:503-443-3799 Fax 503-620-2748 ort, Job# 16-6497 503.443.3799 Date: 12-23-16 Permit# BUP2015-00366 Mail To: Project: KELLER HOLLAND TIGARD INVESTORS,LLC TIGARD APARTMENT 1111 MAIN STREET,SUITE 700 _13015 S / , ' �(/� VANCOUVER,WA 98660 TIGARD,OR 97008 1 SlJ �/"r^'� JOB#HC201355 BUILDING 6 Inspector: Jerry Frampton Cert#OBOA 859 Field Inspection: ACS representative on site for inspection of deficiencies noted on Froelich engineers structural observation report dated 10/27/16 by Rod Hammerberg, P.E. The following items were noted on this date- observation report line item 6: stair landing of apartments has hinge point in columns,please provide RFI for fix; this RFI has been provided (RFI#76)and the required fixes have been completed. Observation report line item 7: please provide LS50 clips to tie stringers to landing that stringers sit on; these clips have been added and are acceptable. Observation report line item 8: A35 and LTP4 clips not installed as required by detail 1/S600; these clips have now been installed and are acceptable. Observation report line item 9: girder trusses must have either(2)2x6 studs or(4)2x4 studs directly under them all the way to foundation. Girder trusses bearing on party wall missing these; the missing studs have been added and are acceptable. Structural observation report line item 10: this item is addressed and acceptable per RFI 88. structural observation report line item 11: A35 clips were not installed on drag trusses as required by detail 8/S600; these clips have now been installed and are acceptable. Structural observation report line item 12: shear transfer from diaphragm to shearwall at step floors; this item was addressed by RFI 77 and is now acceptable. Observation report line item 13: lags were not installed into deck ledger as shown on detail 8/S500; these lags have now been installed and are acceptable. Observation report line item 14: deck joist hangers not fully supported and will need to have hanger manufacturer provide letter that hangers as installed will be adequate for design load;this letter has been provided and this issues is resolved. Observation report line item 15: straps missing as called out by keynote 12 on floor framing plans form top plates to joists at each apartment entry door; these straps are in place and acceptable. Observation report line items 1 through 5 at the community building were inspected and accepted by City of Tigard building inspector.No issues noted. Our reports pertain to the material tested or inspected only.Information contained herein is not to be reproduced except in full, without prior written authorization from this office. Reviewed: e) 6r\,,,t„r„ Date: 12-27-2016 BB/JF CC: Betty Wollam, Ray Wolf, Jon Sakewitez, Kevin Kunishige, Ron Hammerberg, Sarah Bartholomew, Bill Bennett s HOLLAND CONSTRUCTION, INC. 135th & Scholls REQUEST FOR INFORMATION # 088 Project: 135th&Scholls Project#: HC20-135S Date Created: 12/01/16 Answer Company Answered By Author Company Authored By Froelich Consulting Engineers Rod Hammerberg Holland Construction Tom Strassenberg 6969 SW Hampton Street 13145 SW Scholls Ferry Rd Portland,OR 97223 Tigard,OR 97008 Phone: 503.910.9050 Subject Discipline Category Sole Plate Fasteners at Shearwalls Structural Confirmation Reference: Time Frame RFI 3,Submittal 06 05 23.001 R1-Nails and Fasteners Date Required: 12/08/16 Question: Per the attached reviewed submittal,please confirm that a Hy-Tek 5"x.148 Screw Shank nail is approved for sole plate connections at shear walls. RESPONSE: Sole plate connections on the shearwalls is required to be 1/4"diameter SOS screws as called out in the shearwall schedule.0.148" diameter nails are not to be used as a substitute for the SOS screws. DATE: 12/01/16 SIGNED: Rod Hammerberg,FE CC: File and any listed below Name Company Name Email Steve DeMonte LRS Architects sdemonte@Irsarchitects.com AS REQUESTED I AM REVISING OUR RESPONSE TO THE SOLE PLATE ATTACHMENT AT THE SHEARWALL. IT IS ACCEPTABLE TO USE THE 0.148" DIAMETER X 5' LONG HYTEK NAIL IN PLACE OF THE SDS SCREW AS LONG AS THE NAILING THAT IS DONE ON THE SOLE PLATE IS PER THE SKETCHES IN THE NAILING SUBMITTAL. Rod Hammerberg , FE 12-9-16