06/02/1993 - Packet AGENDA
NPO #3 MEETING
WEDNESDAY, JUNE 2, 1993 - 7.00 P.M.
TIGARD CITY HALL
13125 SW HALL BLVD.
TIGARD, OREGON
City of Tigard
JOINT MEETING WITH NPO #7 FOR THE FOLLOWING:
• Proposed Land Use Notification Process
MATERIAL ATTACHED - Presentation and Discussion - Liz Newton
• Proposed CIT Boundaries - Presentation and Discussion - Liz Newton
ADJOURN TO REGULAR MEETING
1. CALL TO ORDER
2. ROLL CALL: PORTER BISHOP FROUDE
GARNER HANSEN HELM
MORTENSEN
3. Approve Minutes from May 5, 1993 meeting (attached).
4. SUB 93-0002 Ames - Status Report (memo attached)
5. Hot and Now - Update
6. Other Business.
7. Adjournment
TO ENSURE A QUORUM TO CONDUCT BUSINESS, PLEASE CALL L2 NEWTON AT
639-4171, EXTENSION 308 IF YOU ARE UNABLE TO ATTEND
h:\login\o\npo3-a
MAY-11-1993 12:58 FROM PGE COMM&INDUST PROGRAMS TO 96847297 P.02
i 0
NPO #3 MINUTES
May 5, 1993
1. joint meeting with NPO #7 called to order at 7:07 p.m.
2 . Duane Roberts of the city planning staff presented
information regarding the proposed wetlands inventory.
3 . Joint meeting adjourned and NPO #3 called to order at 7.53
p.m.
4. Present: Bishop, Froude, 4arner, Haneen, Helm, Mortensen,
Porter
5 . Review of notices received were discussed.
6. Discussion was held regarding the final decision of the
HOG'tl Now and Taco Bell applications..
7. Lou Anon Mortensen asked to be excused at the June meeting so
that she can aLLead Lhe WulttuL islciUla dtlaeAALIUtI meeLlny .
S . Meeting adjourned at 8:20 p.m.
Respectfully submitted,
Lila Garner
I --
•
LAND USE NOTIFICATION PROCESS
If a proposed development involves the following, the applicant
must contact affected property owners (as specified in the TMC) ,
and the CIT Steering Committee representative following the pre-
application meeting but BEFORE submitting the application:
Comprehensive Plan Map or Text Amendment
Zoning Code Map or Text Amendment
Conditional Use
variance
Subdivision
Planned Development
Site Development Review
These requirements do not apply to applications not listed.
The following must be completed:
The applicant shall contact the affected property owners, CIT
representative via first class letter.
The letter shall briefly describe the proposed development and
its location and request a meeting to discuss the application
in more detail. The meeting should occur within 4 weeks of
the date the letter is sent. The meeting should be held in
the evening during the week so the maximum number of
interested parties may attend and should be held in the CIT
area, if possible. Efforts shall be made to avoid scheduling
conflicts with City Council, Planning Commission or other
community wide meetings.
The applicant shall submit an affidavit of mailing with the
mailing label list of all property owners and residents (as
specified in the TMC) , with the application.
The applicant shall provide and post notice at the site at a
location which is viewable from a public right-of-way. The
notice shall be posted on the same day the letter to
interested parties is mailed. The notice shall state that the
site may be considered for a land use action and the telephone
number where the applicant may be reached for additional
information about the proposal. The applicant shall complete
an affidavit of posting for the notices, which shall be
submitted with the application.
The applicant shall provide a sign-up sheet at the meeting
held to discuss the proposal. Those in attendance that wish
to sign will be notified of future meetings, hearings, and
provided copies of written decisions or recommedations on the
proposal generated by the City.
In order for an application to be accepted, the applicant must
submit:
A copy of the letter sent setting the meeting(s) on the
proposal with a mailing list(s) .
Corresponding affidavit(s) of mailing.
Affidavit of posting for the sign.
A copy of the sign-up sheet(s) from meeting(s) held with
interested citizens on the proposal.
MEMORANDUM
CITY OF TIGARD, OREGON
TO: NPO #3
FROM: Jerry Offer. Development Review Planner
DATE: May 26, 1993
SUBJECT: SUB 93-0002 (Ames) Resubmittal
On April 5, 1993, the Planning Commission continued the hearing on
the Ames Orchard II subdivision proposal for the property between
the intersection of SW 121st Avenue and Gaarde Street and the Ames
Orchard subdivision. The Planning Commission was not satisfied
with the applicants' proposal or with the proposal as recommended
by City staff to be modified.
The Commission continued the hearing on this matter until June 7,
1993. The applicants submitted a revised subdivision plan on May
7, 1993. This was too late to be reviewed at the NPO's May 5th
meeting. We would appreciate the NPO re-reviewing this proposal at
your June 2nd meeting and getting comments to the Planning Division
as soon as possible, or presenting your comments directly to the
Commission on June 7th. The Planning Division staff report on
this revised proposal will be available for review on June lst.
Thank you.
•
AT ENGINEERING INC.
ENGINEERING • DEVELOPMENT SERVICES . SURVEYING
AMES ORCHARD PHASE H
APPLICATION FOR DEVELOPMENT
May 5, 1993
Requesting:
Subdivision preliminary plat review to divide Tax Lot 600,
Tax Map 2S1 10BA containing 12.68 acres into 33 lots that
average 13,500 SF.
Variances to permit: right-of-way width of 40'and a
curb width of 28'for proposed S.W.Vista Circle and
S.W. 121st Court
APPLICANT OWNER
Bull Mountain Land Development Co. Robert Ames
16325 SW Boones Ferry Rd. c%Mark Rockwell
Lake Oswego, OR 97035 16325 S Boones Ferry Rd.
Contact: Mark Rockwell Lake Oswego, OR 97035
(503) 635-2996 (503) 635-2996
DEVELOPMENT CONSULTANT
Alpha Engineering Inc.
9600 SW Oak, Suite 230
Portland, OR 97223
Project Manager.Randy Clarno
Staff Planner: Mark Dane
(503) 425-8003
TRAFFIC CONSULTANT
Kittleson&Associates
610 SW Alder, Suite 700
Portland, OR 97205
Project Manager: Gary Katsion
(503) 228-5230
PLAZA WEST SUITE 230 & 9600 S.W. OAK & PORTLAND, OREGON 97223 & 503-452-8003 & FAX 503-452-8043
I. BACKGROUND INFORMATION
The initial application for this parcel was submitted January 25,of this year. After discussions with staff,
a final application was submitted March 10. It requested a zone change from R2 to R3.5, a subdivision
approval, and a variance to the right-of-way width and improvement standard. On April 7, the Plarming
Commission approved the zone change and continued the hearing for the subdivision and variance request
to June 7, 1993. The purpose for the continuation was to allow the applicant time to redesign the plan
in response to the Commission and neighborhood concerns.
A revised subdivision application is now being submitted
The applicant has revised the right-of-way design. A variance to the standard right-of-way and
improvement width is still requested.
H. VICINITY INFORMATION
This application is situated on Tax lot 600,Tax Map 2S1 JOBB. The site lies south of the intersection of
S.W.Gaarde Street and SW 121st Avenue and north of the plat of Ames Orchard. Existing developments
lie to the east, south and west of the property. A Planned Development is proposed north of the site.
This vicinity is composed of upscale single family dwellings,which to the west are zoned R4.5,to the north
PD R4.5 and to the south R1. The property to the east is in unincorporated Washington County and is
zoned R-5 (per County Zoning).
M. SITE INFORMATION AND PROPOSAL DESCRIPTION
The subject site is currently vacant. An old orchard covers 2/3 of the site excepting the east end. There
are no other trees on the site which is primarily covered with grasses and brambles. A few overgrown
shrubs lie on the north boundary of the property and a drainage course runs along the east boundary.
The site slopes down from the southwest corner to the northeast at a steady 10%for the westerly 3/4 of
the property increasing to about 16%-17% at the east end of the property with some localized slopes of
20% (see section 18.88).
It is the intent of the applicant to develop a 33 lot subdivision. In order to accomplish this subdivision as
proposed,the applicant has requested a number of land use and development approvals as described below:
a) Subdivision preliminary plan approval to divide the parcel into 33 lots ranging in size from 11,050
to 28,100 square feet. All lots would have direct access onto a public street. The site will access
the intersection of SW 121st Avenue, and SW Gaarde Street by extending SW 121st Avenue to
SW 121st Court.A loop street will complete the on site circulation.
A storm water quality facility will be built in the northeast corner of the property to treat
on site drainage resulting from the proposed development.
b) A variance is requested to permit a curb-to-curb width of 28'within a 40'wide right-of-way for
S.W. 121st Court and S.W.Vista Circle, an internal loop street (see Utility Plans for details).
SUBDIVISION APPLICATION
COMPREHENSIVE PLAN COMPLIANCE:
Statewide planning goals do not need to be addressed for a development proposal because the Tigard
Comprehensive Plan has been acknowledged to be in compliance with statewide planning goals. The
relevant criteria in this case are Tigard Comprehensive Plan policies:2.1.1, 3.1.1,6.1.1,6.3.1,7.1.2, 7.3.1,
7.2.1, 7.4.4, 8.1.1, and 12.1.1.
Section 2 :Citizen Involvement
Policy 2.1.1 is satisfied because City of Tigard Neighborhood Planning Organization#7 was provided with
a copy of the proposal and was afforded the opportunity to discuss the proposal at their January 1993
regular meeting prior to issuance of this report. Also,several meetings with local residences have occurred
to address any concerns and consider their input relative to design. NPO#7 was also provided with the
opportunity to review the revised plan at their May 5, 1993 meeting.In addition,property owners within
250 feet of the site will be given notice of the public hearing on the proposal and will be advised of their
opportunity to comment.
Section 3: Natural Features and Open Space
Policy 3.1.1 will be satisfied in that established and proven engineering techniques related to the site plan
will ensure those areas having slopes in excess of 20%are suitable for the proposed development. There
is no evidence of slumping earth slides or movement and minimal potential for severe soil erosion. The
foundation soils appear adequate for the proposed development.
There are no areas designated or significant wetlands on this site, nor are there any area of significant
environmental concern.
Policies 3.2-3.7 are not relevant to the project.
Section 4: Air.Water and Land Resources Quality
This section is not relevant to this application.
Section 5• Economy
This section is not relevant to this application.
Section 6: HOusiriQ
Policy 6.1.1 is satisfied because the proposed development would increase potential residential development
opportunities in the City by some 33 residences.In this particular case,the underlying zone would provide
opportunity for an 44 units,however the applicant is proposing significantly less than the maximum density
allowed. Policy 6.3.1 is satisfied because the proposed plan would not allow uses or a residential density
not presently permitted in the surrounding area and would therefore maintain the character of this semi-
established residential area
Policy 6.4.1 is satisfied in that the proposed development allows for an effuient use of the site.
Policies 6.2 and 6.5 are not relevant to this application.
Section 7: Public Facilities and Services
Policies 7.1.2, 7.3.1 and 7.4.4 can be satisfied because extension of sewer, water and storm drainage
facilities to serve the development will be required prior to approval of the final plat. Preliminary plans
for extension of these facilities are provided in conformance with City standards.
Policy 7.2.1 will be satisfied with the creation of a storm water quality facility which will handle all on-site
drainage. In addition, erosion control techniques will be applied per the site development plan.
Policies 7.5, 7.6, 7.7, 7.8 and 7.9 regarding local services will be satisfied and coordinated with the city as
required.
Policies 7.10, 7.11 and 7.12 are not relevant to this application.
' • 0
Section 8: Transportation
Policy 8.1.3 calls for the provision of safe and efficient street system which will accommodate present and
future needs. This policy is satisfied because: an additional 10'is being dedicated to Gaarde Street; the
streets and sidewalk will be constructed to adequate level consistent with City standards;street signs will
be provided where required by the City; adequate on-street parking will be available; open space will be
dedicated to implement a bicycle/pedestrian corridor.
Policies 8.2, 8.3, 8.4 and 8.5 are not relevant to his application.
Section 9: Enerev
This section is not relevant to this application.
Section 10: Annexation
This site is already a part of the City of Tigard therefore this section is not applicable.
Section 11: Area of Special Concern
This section is not relevant to this application.
Section 12: Location Criteria
The new R 3.5 zoning is compatible with the surrounding area,and complies with this section of the code.
COMPLIANCE WITH ZONING PROVISIONS -TITLE 18
Criteria applicable for subdivision approval are code chapters 18.48, 18.92, 18.100, 18.102, 18.10618.108,
18,114, 18.134, 18.160 and 18.164.
18.48: R-3.5 Single Family Residential
Under the proposed R-3.5 zoning district,all the lots would meet the requirements laid down by the code.
R-3.5:
Average Min. Max. Height
Minimum lot size Lot Width of Home
10,000 SF 65 FT 30 FT
Minimum Setback Requirements:
Front Yard Side Yard Street Side Yard Rear Yard
20 FT 5 FT 20 FT 15 FT
18.88: Solar Access Requirements
This application is for a 33 lot subdivision. Therefore 80% or 26 lots must comply with solar access
requirements. Of these,2-lots 28 and 29 are exempted because of an east-west slope of greater than 20%
The remaining 24 lots comply with the basic requirements of a 90'north south dimension,and a front line
orientation within 30 degrees of trues east/west bearing. These lots are No.s 1-6, 12-27, & 33.
Therefore less than 20%of the proposed 33 lots do not comply with solar access standards therefore this
application meets solar requirements.
18.92: Density Calculations
Gross Area: 552,350 SF(12.68 AC)-(Public Improvements = 110,420 SF)/R-3.5(10,000 SF) = 44 lots
potential density, 33 lots are proposed which is a density of 3.3 per acre.
Section 18.100: Landscaping& Screening
No screening or buffering is required as the surrounding land uses are compatible with the proposed
subdivision. All street trees will comply with City of Tigard specifications.
Section 18.102: Visual Clearance Areas
visual clearance is complied with on the affected lots in this application - See Utility Plan.
Section 18.106: Parking& Loading Requirements
All proposed lots will meet the minimum of off-street parking requirements.
Section 18.108: Access Egress and Circulation
All lots will have direct access to a public street. The site accesses the existing road system at the
intersection of Gaarde Street and 121st Avenue. Internally the a loop street connects to the southerly
extension of 121st. All lots will use the 121st entrance to access the site. A 1'non-vehicular strip will be
created along the north line of lots 11 through 17 to nullify the possibility of said lots accessing the possible
future extension of Gaarde Street (see Circulation Plan).
At the initial public hearing there was considerable discussion whether or not this site should contribute
to the construction of that portion of Gaarde extension that adjoins the site to the north. To help evaluate
this it is important to note the following.
a) The site receives no benefit from the Gaarde extension relative to direct access or improved access by
it's residents to area destinations. In reality the extension is a detriment to the site,particularly to those
lots directly adjacent to the street.
b) The site has little to no ability to contribute area to the proposed right-of--way due to the existing
alignment of Gaarde east of the site. In addition, Vista Point an approved PUD north of the Gaarde
extension has already proposed sufficient right-of-way to compete the necessary improvements.
c) The S.W.Gaarde extension is absolutely necessary to provide access and circulation for the Vista Point
development.
d) The proposed development will generate$48,180 in Traffic Impact Fees. These fees are collected to
contribute to the improvement of collector streets such as the Gaarde extension.
In summary the proposed project receives no benefit from the Gaarde extension. Therefore funds that
will be collected from the Traffic Impact Fees appear to be more than a sufficient contribution to the
construction of this portion of the Gaarde extension.
Section 18.114: Signs
Traffic signs will be provided if requested by the City.
Section 18.134: Variance
A variance to the traditional street standard is requested to reduce the right-of-way width and curb-to-curb
width for the proposed Vista Circle, which is the main internal loop street, and S.W. 121st Court. In
addition, the applicant request to provide a sidewalk on one side only.
The functional characteristics of the proposed street exceeds that of the City's current local street
standards as it relates to:
1. Number of on-street parking spaces per unit.
2. Width of driving area or"clear zone"for local traffic and emergency service vehicles.
3. Clearance between improvements and the right-of-way line.
4. Pedestrian travel.
To require the current standard improvement of a 50 foot wide right-of-way and 34 foot wide street would
create unnecessary hardship on both the applicant and City by.
1. Requiring the applicant to incur additional development costs with a wider street and
right-of-way. This may also require up-sizing drainage facilities to accommodate the
increase in storm water runoff.
2. Require the City to maintain right-of-way and facilities that are sized larger than
necessary.
In summary,the proposed street does not sacrifice any of the integrity of the City's current standard and
in most cases exceeds the City's standard. In addition, to require the current standard in this particular
circumstance would create unnecessary hardship on both the applicant and the City.
18.160: Subdivision AAPlication
All submission requirements will be addressed and met where applicable to this development. Variances
are addressed in Section 18.134.