Loading...
Permit (195) CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2017-00183 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 07/19/2017 T[t g Parcel: 1S1260000300 Jurisdiction: Tigard Site address: 9402 SW WASHINGTON SQUARE RD P01 Project: Dick's Sporting Goods Subdivision: None Lot: None Project Description: Removing existing doors and vestibule at eastern side of building;Removing existing sales counters,ceiling fixtures,and electrical fixtures;Replacing flooring,walls,and finishes at the sales and fitting room locations. Contractor: WDS CONSTRUCTION INC Owner: PPR WASHINGTON SQUARE LLC 111 ROWELL ST PO BOX 847 BEAVER DAM,WI 53916 CARLSBAD, CA 92018 PHONE: 920-356-1255 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 07/19/2017 $2,168.99 Demolition Occupancy Grp: M Occupancy Load: 1211 12%State Surcharge-Building 07/19/2017 $260.28 Dwelling Units: 0 Plan Review 06/29/2017 $1,409.84 Stories: 2 Height: 0 ft DC Provision Review,COM TI-Ping 07/19/2017 $357.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 07/19/2017 $867.60 Value: $276,000 Info Process/Archiving-Lg$2.00(over 07/19/2017 $30.00 11x17) Metro Const.Excise Tax 07/19/2017 $331.20 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $5,424.91 Required: Required Items and Reports(Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done corda ith approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days ATTENTION: Oregon law re• es you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 9 -001-0010 through OAR 952-0. -1090. Y• may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. sued By: / Permittee Signature: v \• Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. .•3uilding Permit Application ` Commercial 14`11(t)1,11(I t S1r o)\1) illCity of TigardRECEfirone,�,: //- Date/13 : fir ra Permit No.:, /. - ED ,- w 13125 SW Hall Blvd.,Tigard,OR 9 Plan Review - 1 _" Phone: 503.718.2439 Fax: 503.598.1960 ° Date/By: 7" J .. J Other Permit: i t;:t t?L Inspection Line: 503.639.4175 Date Ready/By: a ' Internet: www.tigard-or.govTIGANotified/A4ethod: �7 Je , p Pe 2 for CITY°F / ( 1) Supplemental Information i R10141t3S,e(c..c,y,mr TYPE O REQ D DATA:1-AND 2-FAMILY DWELLING New construction ►1 Demolition t :"" t` Permit fees*are based on the value of the work performed. rs Addition/alteration/replacement 0 O t w. Indicate the value(rounded to the nearest dollar)of all er equipment,materials,labor,overhead,and the profit for the CATEGORX OF CONSTRUCTIt)N , work indicated on this application. ❑ 1-and 2-family dwelling ►y Commercial/i I '' Valuation: $ O�^7 6;0<3 0 Accessory 0Multi-family buildingc A11 AA + Number of bedrooms: 4t �� N 0 Master builder Other: 1)IVISI 1' Number of bathrooms: . - JO$ SITE INFORMATION AND LOCA Total umber of floors: Job site address:09400 SW WASHINGTON SQUARE ROAD it' . ,JA-ft.f( "1''t `1i '1'`" New dwelling area square feet City/State/ZIP:Portland,Oregon 97223ti�, �• Garage/carport area: square feet Suite/bldg./apt.no.: Project name:Dicks Sporting Goods Covered porch area: square feet Cross street/directions to job site:SW.Washington Square Road and Blum Road Deck area: square feet Washington Square Mall Tigard,Oregon Other structure area: square feet REQUIRED DATAt COMMERCIAL-USE CHECKLIST', Subdivision: 1 Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.:1S126-00300 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK ; work indicated on this application. Remove existing doors and vestibule at eastern side of building.Remove existing Valuation: $276,000 sales counters,ceiling fixtures,electrical fixtures,and flooring.Replace Existing building area: 90165 square feet flooring,lighting,wails,and finishes at that locations and womens fitting rm. New building area: 90165 square feet + PROPERTY OWNER TEN Number of stories: 2 Name:PPR WASHINGTON SQUARE LLC Macerich Company Type of construction: IIB Address:401 WilshireBoulevard,Suite#700 Occupancy groups: City/State/ZIP:Santa Monica,CA 90407 Existing: yes Phone:( )310 394-6000 I Fax:( ) _ New: ' APPLICANT4 CONTACT PERSON BUILDING PERMIT FEES* Business :Steen Patrick Maher Architect - -'(Pleaserefer to feeaeeleis d , ' Contact name:Michael J.Knapp Structural plan review fee(or deposit): A s:712 4th Ave S. FLS plan review fee(if applicable): City/State/ZIP:Nashville TN.37210 Total fees due upon application: Phone:(615) 170 I Fax::(616)244-8141 Amount received: E-mail:na.knapp@mimarch.com PHOTOVOLTAICSOLAR PANEL SYSTEM FEES* CONTRACTOR , ' `" Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name:WDS Submit two(2)sets of roof plan with connection details A s:111 Rowell Street and fire department access,along with the 2010 Oregon Solar Installation Specialty Code checklist. City/State/ZIP:Beaver Dam,Wi.53916 Permit fee(includes plan review — - and administrative fees): $180.00 9 Phone:(920)356-1255 Pax:(920)3561270 --- -.— State surcharge(12%ofpermit fee): $21.60 CCB lir.:205$10 d eel m' //J /1 - - -•- Total fee due upon application: $201.60 Authorized signature: y 4 //�, p� This permit application expires if a permit is not obtained cis/ �// within 180 days after it has been accepted as complete. Print name:Bob Pickart I Date:06/16/17 J * Fee methodology set by Tri-County Building Industry Service Board. I:lBuilding\Permits\BUP-COM PerrnitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) _ Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 276,000.00 MULTIPLIER (25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 69,000.00 ELEMENTS: In choosing which accessible elements to provide wider this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 0.00 (b) An accessible entrance: $ 0.00 (c) An accessible route to the altered area: $ 0.00 (d) At least one accessible restroom for each sex or a single unisex restroom: $ 0.00 (e) Accessible telephones: $ 0.00 (f) Accessible drinking fountains:and, $ 0.00 (g) When possible,additional accessible elements such as storage and alarms: $ 0.00 TOTAL(shall equal line [2] of Valuation Computation): $ 0.00 * The building was built in 2007 and during the asbuilt survey by MJM for this alteration there were no elements that were not accessible. Items (a) thru (g) were all up to current codes. I:ABuilding\I'errnits\BI.)P-t:(tNt l'crmit:App.dnc 037()3/ ■ City of Tigard 71 COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review — Commercial - With Land Use TIGARD Building Permit #: ec j J/7-Y //J Site Address: /`- a) A A, S7 Pei Suite/Bldg#: _0/ Project Name: /�ic SOr- qS (Name of commercial busin ss occupying th L�Daspace. If vacant,enter Spec Space.) Planning Review �f Proposal: 77/ptn- i rav 1S , pmor-- r 0'dr— 074- trZ(Verify site address/suite# exists and active in permit systee I it ver Terrace Neighborhood: ❑ Yes 1a No in and Use Case#: '��% - �(� � Plans Match Approved Land Use: 'Rite Plan �1 fondscape Plan �1 Kher: /Rite Forestry Plan 1/ Elevation Plan Building Height: Maximum Height Q00 ' Actual Height 0.k 0 t enditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuanc� X Business Licen : Exists: Yes ❑ No,applicant notified to obtain business license tol 'ublic Facilities Improvement (PFI) Permit: Required: ❑ Yes, applicant was notified No Applied For: ❑ Yes ❑ No, stop intake Notes: Approved by Planning: _1/4"----- --.1 - - _ �A Date: ( /a2,. i - Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: E Approved E Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal `-�Original Submittal Date: Gj/c71)/ /l Site Plans: # 3 Building Plans: # 3 Building Permit#: ter building permit#above. Workflow Routing: rf--Manning [ -1 veering E-"Pfrmit Coordinator -Beilcling Workflow Sign-off: Ki--Sign-off for Planning(include notes from planning review) Route Application Documents: uilding: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: ezei,b ,y ," c„. ‘,/ ; 4/' S' :7%-re reCz l VA7 i xe .34-;,,,,.,4,,,4,, J By Permit Technician: '- Date: `j/'7 1:\Building\Forms\B1dgPermitRvw_COM_WithLandUse 070915.docx Engineering Review Slope at building pad: (70 �I'FIPermit#: la I A [;; Conditions "Met"prior to issuance of building permit 2'asements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) ❑'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes R'No Assess Water Quantity Fee in-lieu: E Yes Er-No LIDA Facility on lot: ❑ Yes g---No E NOT Approved by Engineering: Date Notes: Approved by Engineering: IL_ -"L.....k __,.. Date: 7, .-/7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes in:N/A Tigard Trans SDC: ❑ Yes PN/A Parks SDC: ❑ Yes p N/A teOK to Issue Permit Approved by Permit Coordinator: Date:?/ 6! `- I:\Building\Fonns\B1dgPermitRvw COM WithLandUse 070915.docx Ste h nP Trans ittaI p e atrick Maher, Architect RECEIVED 1► Date: 06/21/2017 JUN 2 2 201? CITY dF 7,� Ship To: City of Tigard(Building Permit Office) ARCHITECTURE Stephen Patrick Maher, GARD Architect BUILDING DIVISION 13125 SW Hall Blvd. 712 4TH Ave S NASHVILLE,TN 37210 OR 97223 615.244.8170Tigard, 615.244.8141 www.mjmarch.com From: Mike Knapp Project Number I Project Name I Shipping Method MJM# 17077 DSG Store 342 Tigard OR We transmit the following: El Drawings ❑Change Order ['Shop Drawing Reproducibles ❑ Samples 0 Shop Drawing Prints ['Product Literature ❑ Specifications El Other: Permit app.and fee For your: p Files CI Information ❑ Use Il Review ❑Comment El Distribution to others ❑' Approval ❑Other : Item# Qty. Date Description 1 3 6/21/17 (3)Review sets In 2 1 6/21/17 Permit Application 3 1 6/21/2017 Permit application Fee Description City of Tigard Building Department, We are sending you:Permit Application,Permit Fee,and three(3)sets of plans for the alterations at Dick's Sporting Goods there at Washington Square Mall.We plan to eliminate the doors and vestibule at the eastern side of the building along with the interior elements(flooring,electrical,and fixtures)on the interior.We will replace flooring,electrical,add walls,and new fixtures during this alteration. If you have any questions, please give me a call. Thanks, Michael J.Knapp, Project Manager Stephen Patrick Maher,Architect.