Loading...
Report Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, ugene Office (541)345-0289 Inc.• Salem Office (541) 589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER May 31, 2016 T1505048 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: JAPANESE INTERNATIONAL BAPTIST CHURCH (JIBC) Address: 8500 SW SPRUCE ST-Tigard, OR Permit#: BUP2015-00112 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Reinforced Concrete Adhesive Anchors Structural Steel The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition"or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:1ProjectslGeneral\2015\71505048105-31-2016 Final Letter.doc updated 11/30/11 May 31, 2016 11505048 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. (—XJ) Kurtis Parkin Fa/Q Project Manager KP/nm Attachment cc: ESI CONSTRUCTION INC-ROGER BROCKWAY4 ROGER@ESIGc.coM CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP' BARNETT WALTER@TIGARD-OR.GOV LEWIS &VAN VLEET INC -GARY LEWIS GJLEWIS@LWI.COM Carlson Testing, Inc. Incompleted Items List (NCL) May 27,2016 T1505048. Project Name: JAPANESE INTERNATIONAL BAPTIST CHURCH (JIBC) Project Address: 8500 SW SPRUCE ST TIGARD OR Permit No: BUP2015-00112 P.O.No: 150902 Project Manager: K. PARKIN Item# Insp. Date Item Description Compliance CTi Sign4MT Date Corrected 1 WR 11/17/2015 SOILS Proctor: 2 Req % Comp: 92 RETESTED ON 11/23/15. W. RIDER 11/23/2015 Date Tested Test # % Comp RETEST NUMBER 1A. 11/17/2015 BC 1 89 Location: GRID A/1 FOOTING. 2 WR 11/17/2015 SOILS Proctor: 2 Req % Comp: 92 RETESTED ON 11/23/15. W. RIDER 11/23/2015 Date Tested Test # % Comp RETEST NUMBER 4A. 11/17/2015 BC 4 90 Location: GRID B/1.1 FOOTING. 3 WR 11/17/2015 SOILS Proctor: 2 Req % Comp: 92 RETESTED ON 11/23/15. W. RIDER 11/23/2015 Date Tested Test # % Comp RETEST NUMBER 5A. 11/17/2015 BC 5 90 Location: GRID A/4 FOOTING. CC:ESI CONSTRUCTION INC - ROGER BROCKWAY CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT LEWIS & VAN VLEET INC - GARY LEWIS Page: 1