Loading...
Report (22) Frr,,r 7409 SW Tech Center Dr,Ste.145 Tigard,OR 97223 Ph:503-443-3799 Fax:503-620-2748 ,rr ra'.y'rrr:.rtic '" ' ' '99 Special Inspection Final Report Date: 09-11-2015 Job#15-5433-09 Permit#BUP2015-00176 Mail To: Project: NORLIFT OF OREGON, INC STOUT TANKS&KETTLE PO BOX 68348 16300 SW 76TH AVE PORTLAND, OR 97268 PORTLAND,OR 91224 To Whom It May Concern: ACS Testing, Inc.attests that their inspectors performed special inspection(s)on a continuous and/or Periodic basis as required by the specific jurisdiction and/or IBC. Special inspection(s)were performed For the following: Anchors-Expansion Based on personal observation,inspection and reports reviewed by me for the above project, I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications,and the applicable codes and standards for the jurisdiction. -14-db.t\O rdit.61\A-A--- Approved by: Bob Brown/President BB/KP i may'" Proud to be Nationally Accredited by International Accrediting Service ACCREDITED